-
1
-
-
2942612365
-
Case study methodology as a means of theory building: Performance measurement in facilities management organisations
-
Amaratunga, D. and Baldry, D. (2001), "Case study methodology as a means of theory building: performance measurement in facilities management organisations", Work Study, Vol. 50 No. 3, pp. 95-104.
-
(2001)
Work Study
, vol.50
, Issue.3
, pp. 95-104
-
-
Amaratunga, D.1
Baldry, D.2
-
2
-
-
1642527646
-
Enhancing simulation software for use in manufacturing
-
Baldwin, L.P., Eldabi, T., Hlupic, V. and Irani, Z. (2000), "Enhancing simulation software for use in manufacturing", Logistics Information Management, Vol. 13 No. 2, pp. 263-70.
-
(2000)
Logistics Information Management
, vol.13
, Issue.2
, pp. 263-270
-
-
Baldwin, L.P.1
Eldabi, T.2
Hlupic, V.3
Irani, Z.4
-
3
-
-
0032050252
-
Abstracting performance in hierarchical manufacturing simulation
-
Ball, P. (1998), "Abstracting performance in hierarchical manufacturing simulation". Journal of Materials Processing Technology, Vol. 76, pp. 246-51.
-
(1998)
Journal of Materials Processing Technology
, vol.76
, pp. 246-251
-
-
Ball, P.1
-
4
-
-
0035157420
-
Strategy management through quantitative modelling of performance measurement systems
-
Bititci, U.S., Suwignjo, P. and Carrie, A.S. (1999), "Strategy management through quantitative modelling of performance measurement systems". International Journal of Production Economics, Vol. 69 No. 1, pp. 15-22.
-
(1999)
International Journal of Production Economics
, vol.69
, Issue.1
, pp. 15-22
-
-
Bititci, U.S.1
Suwignjo, P.2
Carrie, A.S.3
-
6
-
-
2942604448
-
Performance measurement at the sharp end: Driving continuous improvement on the shop floor
-
Daniels, R.C. (1995), "Performance measurement at the sharp end: driving continuous improvement on the shop floor", Engineering Management Journal, Vol. 30 No. 7, pp. 34-9.
-
(1995)
Engineering Management Journal
, vol.30
, Issue.7
, pp. 34-39
-
-
Daniels, R.C.1
-
7
-
-
0000396488
-
Measure of manufacturing performance in advanced manufacturing systems
-
de Ron, A.J. (1995), "Measure of manufacturing performance in advanced manufacturing systems", International Journal of Production Economics, Vol. 41, pp. 147-60.
-
(1995)
International Journal of Production Economics
, vol.41
, pp. 147-160
-
-
De Ron, A.J.1
-
8
-
-
0037616527
-
Effects of workstation loading on the objective of the system's entry policy in FMS
-
Doulgeri, Z. and Kehris, E. (2003), "Effects of workstation loading on the objective of the system's entry policy in FMS", Integrated Manufacturing Systems, Vol. 14 No. 3, pp. 293-304.
-
(2003)
Integrated Manufacturing Systems
, vol.14
, Issue.3
, pp. 293-304
-
-
Doulgeri, Z.1
Kehris, E.2
-
9
-
-
0031076668
-
An integrated dynamic performance measurement system for improving manufacturing competitiveness
-
Ghalayini, A.M., Noble, J.S. and Crowe, T.J. (1997), "An integrated dynamic performance measurement system for improving manufacturing competitiveness", International Journal of Production Economics, Vol. 48, pp. 207-25.
-
(1997)
International Journal of Production Economics
, vol.48
, pp. 207-225
-
-
Ghalayini, A.M.1
Noble, J.S.2
Crowe, T.J.3
-
10
-
-
0027624372
-
Integrated performance measurement: A review of current practice and emerging trend
-
Gregory, M.J. (1993), "Integrated performance measurement: a review of current practice and emerging trend", International Journal of Production Economics, Vol. 30, pp. 281-96.
-
(1993)
International Journal of Production Economics
, vol.30
, pp. 281-296
-
-
Gregory, M.J.1
-
11
-
-
0035780960
-
Simulation integration in manufacturing system development: A study of Japanese industry
-
Holst, L. and Bolmsjo, G. (2001), "Simulation integration in manufacturing system development: a study of Japanese industry", Industrial Management & Data Systems, Vol. 101 No. 7, pp. 339-56.
-
(2001)
Industrial Management & Data Systems
, vol.101
, Issue.7
, pp. 339-356
-
-
Holst, L.1
Bolmsjo, G.2
-
12
-
-
2942607526
-
Performance measurement in 'design for X'
-
Huang, G.Q. and Mak, K.L. (1997), "Performance measurement in 'design for X'", Proceedings of the CIRP International Symposium on Advanced Design and Manufacture in the Global Manufacturing Era, 21-22 August, Hong Kong.
-
(1997)
Proceedings of the CIRP International Symposium on Advanced Design and Manufacture in the Global Manufacturing Era, 21-22 August, Hong Kong
-
-
Huang, G.Q.1
Mak, K.L.2
-
13
-
-
0036338382
-
A procedure for establishing a reference state in qualitative simulation of operational systems
-
Kritchanchai, D. and MacCarthy, B. (2002), "A procedure for establishing a reference state in qualitative simulation of operational systems", Industrial Management & Data Systems, Vol. 102 No. 6, pp. 332-40.
-
(2002)
Industrial Management & Data Systems
, vol.102
, Issue.6
, pp. 332-340
-
-
Kritchanchai, D.1
MacCarthy, B.2
-
14
-
-
3843144923
-
Integrated performance measurement system design: A literature review and research agenda
-
Neely, A., Gregory, M. and Platts, K. (1995), "Integrated performance measurement system design: a literature review and research agenda". International Journal of Operations & Production Management, Vol. 15 No. 4, pp. 80-116.
-
(1995)
International Journal of Operations & Production Management
, vol.15
, Issue.4
, pp. 80-116
-
-
Neely, A.1
Gregory, M.2
Platts, K.3
-
15
-
-
0004009033
-
-
McGraw-Hill, New York, NY
-
Pegden, C.D., Shannon, R.E. and Sadowski, R.P. (1995), Introduction to Simulation Using SIMAN, 2nd ed., McGraw-Hill, New York, NY.
-
(1995)
Introduction to Simulation Using SIMAN, 2nd Ed.
-
-
Pegden, C.D.1
Shannon, R.E.2
Sadowski, R.P.3
-
16
-
-
0031636297
-
Comprehensive simulation analysis of a flexible hybrid assembly system
-
Saad, M.S. and Bryne, M.D. (1998), "Comprehensive simulation analysis of a flexible hybrid assembly system". Integrated Manufacturing Systems, Vol. 9 No. 3, pp. 156-67.
-
(1998)
Integrated Manufacturing Systems
, vol.9
, Issue.3
, pp. 156-167
-
-
Saad, M.S.1
Bryne, M.D.2
-
17
-
-
0006114861
-
A review and analysis of the state-of-the-art research on productivity measurement
-
Singh, H., Motwani, J. and Kumar, A. (2000), "A review and analysis of the state-of-the-art research on productivity measurement", Industrial Management & Data Systems, Vol. 100 No. 5, pp. 234-41.
-
(2000)
Industrial Management & Data Systems
, vol.100
, Issue.5
, pp. 234-241
-
-
Singh, H.1
Motwani, J.2
Kumar, A.3
-
18
-
-
0033343596
-
Assessing manufacturing performance: An advanced manufacturing technology portfolio perspective
-
Small, M.H. (1999), "Assessing manufacturing performance: an advanced manufacturing technology portfolio perspective", Industrial Management & Data Systems, Vol. 96 No. 6, pp. 266-77.
-
(1999)
Industrial Management & Data Systems
, vol.96
, Issue.6
, pp. 266-277
-
-
Small, M.H.1
-
19
-
-
0002648590
-
System level improvement using discrete event simulation
-
Spedding, T.A. and Chan, K.K. (2001), "System level improvement using discrete event simulation", International Journal of Quality & Reliability Management, Vol. 18 No. 1, pp. 84-103.
-
(2001)
International Journal of Quality & Reliability Management
, vol.18
, Issue.1
, pp. 84-103
-
-
Spedding, T.A.1
Chan, K.K.2
-
20
-
-
0035780957
-
Business process modelling in small to medium sized companies
-
Tam, A.S.M., Chu, L.K. and Scuilli, D. (2001), "Business process modelling in small to medium sized companies". Industrial Management & Data Systems, Vol. 101 No. 4, pp. 144-52.
-
(2001)
Industrial Management & Data Systems
, vol.101
, Issue.4
, pp. 144-152
-
-
Tam, A.S.M.1
Chu, L.K.2
Scuilli, D.3
-
21
-
-
0036017711
-
Case research in operations management
-
Voss, C., Tsikriktsis, N. and Frohlich, M. (2002), "Case research in operations management", International Journal of Operations & Production Management, Vol. 22 No. 2, pp. 195-218.
-
(2002)
International Journal of Operations & Production Management
, vol.22
, Issue.2
, pp. 195-218
-
-
Voss, C.1
Tsikriktsis, N.2
Frohlich, M.3
-
22
-
-
0032257703
-
Simulation applied to final engine drop assembly
-
paper presented at the, Washington, DC, 13-16 December
-
Williams, E.J. and Orlando, D.E. (1998), "Simulation applied to final engine drop assembly", paper presented at the Winter Simulation Conference, Washington, DC, 13-16 December.
-
(1998)
Winter Simulation Conference
-
-
Williams, E.J.1
Orlando, D.E.2
-
23
-
-
0242527648
-
-
The Lanner Group, Redditch
-
WITNESS (2002), Users Manual, The Lanner Group, Redditch.
-
(2002)
Users Manual
-
-
|