메뉴 건너뛰기




Volumn 104, Issue 3, 2004, Pages 309-321

Simulating production performance: Cross case analysis and policy implications

Author keywords

Case studies; Operations management; Performance management; Simulation

Indexed keywords

COMPUTER SIMULATION; ENTERPRISE RESOURCE PLANNING; GRAPHICAL USER INTERFACES; MAXIMUM LIKELIHOOD ESTIMATION; OPERATIONS RESEARCH; PRODUCTIVITY; STRATEGIC PLANNING; AUTOMATION; FINITE DIFFERENCE METHOD; INDUSTRY; MANAGEMENT; MANUFACTURE; PERFORMANCE; SCHEDULING;

EID: 3242722020     PISSN: 02635577     EISSN: None     Source Type: Journal    
DOI: 10.1108/02635570410530720     Document Type: Article
Times cited : (16)

References (24)
  • 1
    • 2942612365 scopus 로고    scopus 로고
    • Case study methodology as a means of theory building: Performance measurement in facilities management organisations
    • Amaratunga, D. and Baldry, D. (2001), "Case study methodology as a means of theory building: performance measurement in facilities management organisations", Work Study, Vol. 50 No. 3, pp. 95-104.
    • (2001) Work Study , vol.50 , Issue.3 , pp. 95-104
    • Amaratunga, D.1    Baldry, D.2
  • 3
    • 0032050252 scopus 로고    scopus 로고
    • Abstracting performance in hierarchical manufacturing simulation
    • Ball, P. (1998), "Abstracting performance in hierarchical manufacturing simulation". Journal of Materials Processing Technology, Vol. 76, pp. 246-51.
    • (1998) Journal of Materials Processing Technology , vol.76 , pp. 246-251
    • Ball, P.1
  • 4
    • 0035157420 scopus 로고    scopus 로고
    • Strategy management through quantitative modelling of performance measurement systems
    • Bititci, U.S., Suwignjo, P. and Carrie, A.S. (1999), "Strategy management through quantitative modelling of performance measurement systems". International Journal of Production Economics, Vol. 69 No. 1, pp. 15-22.
    • (1999) International Journal of Production Economics , vol.69 , Issue.1 , pp. 15-22
    • Bititci, U.S.1    Suwignjo, P.2    Carrie, A.S.3
  • 6
    • 2942604448 scopus 로고
    • Performance measurement at the sharp end: Driving continuous improvement on the shop floor
    • Daniels, R.C. (1995), "Performance measurement at the sharp end: driving continuous improvement on the shop floor", Engineering Management Journal, Vol. 30 No. 7, pp. 34-9.
    • (1995) Engineering Management Journal , vol.30 , Issue.7 , pp. 34-39
    • Daniels, R.C.1
  • 7
    • 0000396488 scopus 로고
    • Measure of manufacturing performance in advanced manufacturing systems
    • de Ron, A.J. (1995), "Measure of manufacturing performance in advanced manufacturing systems", International Journal of Production Economics, Vol. 41, pp. 147-60.
    • (1995) International Journal of Production Economics , vol.41 , pp. 147-160
    • De Ron, A.J.1
  • 8
    • 0037616527 scopus 로고    scopus 로고
    • Effects of workstation loading on the objective of the system's entry policy in FMS
    • Doulgeri, Z. and Kehris, E. (2003), "Effects of workstation loading on the objective of the system's entry policy in FMS", Integrated Manufacturing Systems, Vol. 14 No. 3, pp. 293-304.
    • (2003) Integrated Manufacturing Systems , vol.14 , Issue.3 , pp. 293-304
    • Doulgeri, Z.1    Kehris, E.2
  • 9
    • 0031076668 scopus 로고    scopus 로고
    • An integrated dynamic performance measurement system for improving manufacturing competitiveness
    • Ghalayini, A.M., Noble, J.S. and Crowe, T.J. (1997), "An integrated dynamic performance measurement system for improving manufacturing competitiveness", International Journal of Production Economics, Vol. 48, pp. 207-25.
    • (1997) International Journal of Production Economics , vol.48 , pp. 207-225
    • Ghalayini, A.M.1    Noble, J.S.2    Crowe, T.J.3
  • 10
    • 0027624372 scopus 로고
    • Integrated performance measurement: A review of current practice and emerging trend
    • Gregory, M.J. (1993), "Integrated performance measurement: a review of current practice and emerging trend", International Journal of Production Economics, Vol. 30, pp. 281-96.
    • (1993) International Journal of Production Economics , vol.30 , pp. 281-296
    • Gregory, M.J.1
  • 11
    • 0035780960 scopus 로고    scopus 로고
    • Simulation integration in manufacturing system development: A study of Japanese industry
    • Holst, L. and Bolmsjo, G. (2001), "Simulation integration in manufacturing system development: a study of Japanese industry", Industrial Management & Data Systems, Vol. 101 No. 7, pp. 339-56.
    • (2001) Industrial Management & Data Systems , vol.101 , Issue.7 , pp. 339-356
    • Holst, L.1    Bolmsjo, G.2
  • 13
    • 0036338382 scopus 로고    scopus 로고
    • A procedure for establishing a reference state in qualitative simulation of operational systems
    • Kritchanchai, D. and MacCarthy, B. (2002), "A procedure for establishing a reference state in qualitative simulation of operational systems", Industrial Management & Data Systems, Vol. 102 No. 6, pp. 332-40.
    • (2002) Industrial Management & Data Systems , vol.102 , Issue.6 , pp. 332-340
    • Kritchanchai, D.1    MacCarthy, B.2
  • 14
    • 3843144923 scopus 로고
    • Integrated performance measurement system design: A literature review and research agenda
    • Neely, A., Gregory, M. and Platts, K. (1995), "Integrated performance measurement system design: a literature review and research agenda". International Journal of Operations & Production Management, Vol. 15 No. 4, pp. 80-116.
    • (1995) International Journal of Operations & Production Management , vol.15 , Issue.4 , pp. 80-116
    • Neely, A.1    Gregory, M.2    Platts, K.3
  • 16
    • 0031636297 scopus 로고    scopus 로고
    • Comprehensive simulation analysis of a flexible hybrid assembly system
    • Saad, M.S. and Bryne, M.D. (1998), "Comprehensive simulation analysis of a flexible hybrid assembly system". Integrated Manufacturing Systems, Vol. 9 No. 3, pp. 156-67.
    • (1998) Integrated Manufacturing Systems , vol.9 , Issue.3 , pp. 156-167
    • Saad, M.S.1    Bryne, M.D.2
  • 17
    • 0006114861 scopus 로고    scopus 로고
    • A review and analysis of the state-of-the-art research on productivity measurement
    • Singh, H., Motwani, J. and Kumar, A. (2000), "A review and analysis of the state-of-the-art research on productivity measurement", Industrial Management & Data Systems, Vol. 100 No. 5, pp. 234-41.
    • (2000) Industrial Management & Data Systems , vol.100 , Issue.5 , pp. 234-241
    • Singh, H.1    Motwani, J.2    Kumar, A.3
  • 18
    • 0033343596 scopus 로고    scopus 로고
    • Assessing manufacturing performance: An advanced manufacturing technology portfolio perspective
    • Small, M.H. (1999), "Assessing manufacturing performance: an advanced manufacturing technology portfolio perspective", Industrial Management & Data Systems, Vol. 96 No. 6, pp. 266-77.
    • (1999) Industrial Management & Data Systems , vol.96 , Issue.6 , pp. 266-277
    • Small, M.H.1
  • 20
    • 0035780957 scopus 로고    scopus 로고
    • Business process modelling in small to medium sized companies
    • Tam, A.S.M., Chu, L.K. and Scuilli, D. (2001), "Business process modelling in small to medium sized companies". Industrial Management & Data Systems, Vol. 101 No. 4, pp. 144-52.
    • (2001) Industrial Management & Data Systems , vol.101 , Issue.4 , pp. 144-152
    • Tam, A.S.M.1    Chu, L.K.2    Scuilli, D.3
  • 22
    • 0032257703 scopus 로고    scopus 로고
    • Simulation applied to final engine drop assembly
    • paper presented at the, Washington, DC, 13-16 December
    • Williams, E.J. and Orlando, D.E. (1998), "Simulation applied to final engine drop assembly", paper presented at the Winter Simulation Conference, Washington, DC, 13-16 December.
    • (1998) Winter Simulation Conference
    • Williams, E.J.1    Orlando, D.E.2
  • 23
    • 0242527648 scopus 로고    scopus 로고
    • The Lanner Group, Redditch
    • WITNESS (2002), Users Manual, The Lanner Group, Redditch.
    • (2002) Users Manual


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.