-
1
-
-
0021484063
-
Performance of hierarchical production scheduling policy
-
Akella, R., Choong, Y.F. and Gershwin, S.B. (1984), "Performance of hierarchical production scheduling policy", IEEE Transactions Components Hybrids Manufacturing Technol., Vol. 7 No. 3, pp. 225-40.
-
(1984)
IEEE Transactions Components Hybrids Manufacturing Technol.
, vol.7
, Issue.3
, pp. 225-240
-
-
Akella, R.1
Choong, Y.F.2
Gershwin, S.B.3
-
2
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker, K.R. and Scudder, G.D. (1990), "Sequencing with earliness and tardiness penalties: a review", Op. Res., Vol. 38 No. 1, pp. 22-36.
-
(1990)
Op. Res.
, vol.38
, Issue.1
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
3
-
-
0020013653
-
A state of the art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, J.H., Phillips, D.T. and Hogg, G.L. (1982), "A state of the art survey of dispatching rules for manufacturing job shop operations", Int. J. Prod. Res., Vol. 20 No. 1, pp. 27-45.
-
(1982)
Int. J. Prod. Res.
, vol.20
, Issue.1
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
4
-
-
0023868981
-
Sequencing in flexible manufacturing systems and other short queue length systems
-
Co, H.C., Jaw, T.J. and Chen, S.K. (1998), "Sequencing in flexible manufacturing systems and other short queue length systems", J. Man. Systems, Vol. 7 No. 1, pp. 1-9.
-
(1998)
J. Man. Systems
, vol.7
, Issue.1
, pp. 1-9
-
-
Co, H.C.1
Jaw, T.J.2
Chen, S.K.3
-
5
-
-
0038755232
-
Production control policies for a flexible assembly system
-
Doulgeri, Z. and Magaletti, N. (1991), "Production control policies for a flexible assembly system", Int. J. Robotics and CIM, Vol. 8 No. 2, pp. 113-19.
-
(1991)
Int. J. Robotics and CIM
, vol.8
, Issue.2
, pp. 113-119
-
-
Doulgeri, Z.1
Magaletti, N.2
-
6
-
-
0038755220
-
A hierarchical knowledge-based scheduling and control for FMSs
-
Doulgeri, Z., D'Alessandro G. and Magaletti, N. (1993), "A hierarchical knowledge-based scheduling and control for FMSs", Int. J. Computer Integrated Manufacturing, Vol. 6 No. 3, pp. 191-200.
-
(1993)
Int. J. Computer Integrated Manufacturing
, vol.6
, Issue.3
, pp. 191-200
-
-
Doulgeri, Z.1
D'Alessandro, G.2
Magaletti, N.3
-
8
-
-
0025460688
-
On line loading and dispatching in flexible manufacturing systems
-
Garetti, M., Pozzetti, A. and Bareggi, A. (1990), "On line loading and dispatching in flexible manufacturing systems", Int. J. Prod. Res., Vol. 28 No. 7, pp. 1271-92.
-
(1990)
Int. J. Prod. Res.
, vol.28
, Issue.7
, pp. 1271-1292
-
-
Garetti, M.1
Pozzetti, A.2
Bareggi, A.3
-
9
-
-
0023964289
-
Closed-loop job release control for VLSI circuit manufacturing
-
Glassey, C.R. and Resende, M.G.C. (1998), "Closed-loop job release control for VLSI circuit manufacturing", IEEE Trans. on Semiconductor Manufacturing, Vol. 1 No. 1, pp. 36-46.
-
(1998)
IEEE Trans. on Semiconductor Manufacturing
, vol.1
, Issue.1
, pp. 36-46
-
-
Glassey, C.R.1
Resende, M.G.C.2
-
10
-
-
0023211257
-
Hierarchical scheduling approach in flexible assembly systems
-
Raleigh, NC
-
Graves, R. (1987), "Hierarchical scheduling approach in flexible assembly systems", Proceedings of the 1987 IEEE Conference on Robotics and Automation, Raleigh, NC, Vol. 1, pp. 118-23.
-
(1987)
Proceedings of the 1987 IEEE Conference on Robotics and Automation
, vol.1
, pp. 118-123
-
-
Graves, R.1
-
11
-
-
0026155862
-
Scheduling approaches for random job shop flexible manufacturing systems
-
Hutchinson, J., Leong, K., Snyder, D. and Ward, P. (1991), "Scheduling approaches for random job shop flexible manufacturing systems", Int. J. Prod. Res., Vol. 29 No. 5, pp. 1053-7.
-
(1991)
Int. J. Prod. Res.
, vol.29
, Issue.5
, pp. 1053-1057
-
-
Hutchinson, J.1
Leong, K.2
Snyder, D.3
Ward, P.4
-
13
-
-
0020915621
-
An algorithm for the computer control of flexible manufacturing systems
-
Kinemia, J. and Gershwin S.B. (1983), "An algorithm for the computer control of flexible manufacturing systems", IIE Transactions, Vol. 15 No. 4, pp. 353-62.
-
(1983)
IIE Transactions
, vol.15
, Issue.4
, pp. 353-362
-
-
Kinemia, J.1
Gershwin, S.B.2
-
14
-
-
0025416939
-
Analysis of scheduling rules for an FMS
-
Montazeri, M. and Van Wassenhove, L.N. (1990), "Analysis of scheduling rules for an FMS", Int. J. Prod. Res., Vol. 28 No. 4, pp. 785-802.
-
(1990)
Int. J. Prod. Res.
, vol.28
, Issue.4
, pp. 785-802
-
-
Montazeri, M.1
Van Wassenhove, L.N.2
-
15
-
-
0004251445
-
-
Van Nostrand Company, Princeton, NJ
-
Tocher, K. (1963), The Art of Simulation, Van Nostrand Company, Princeton, NJ.
-
(1963)
The Art of Simulation
-
-
Tocher, K.1
|