메뉴 건너뛰기




Volumn 13, Issue 1, 2006, Pages 62-81

Embedding good practice sharing within process improvement

Author keywords

Construction works; Knowledge sharing; Process analysis; Process planning

Indexed keywords

KNOWLEDGE BASED SYSTEMS; MATHEMATICAL MODELS; PROCESS CONTROL; SOCIETIES AND INSTITUTIONS; STRUCTURAL DESIGN; SUSTAINABLE DEVELOPMENT;

EID: 30644475714     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980610646502     Document Type: Article
Times cited : (8)

References (79)
  • 1
    • 84986065208 scopus 로고    scopus 로고
    • Process improvement in facilities management: The SPICE approach
    • Amaratunga, D., Sarshar, M. and Baldry, D. (2002), "Process improvement in facilities management: the SPICE approach", Business Process Management Journal, Vol. 8 No. 4, pp. 318-37.
    • (2002) Business Process Management Journal , vol.8 , Issue.4 , pp. 318-337
    • Amaratunga, D.1    Sarshar, M.2    Baldry, D.3
  • 2
    • 0036338256 scopus 로고    scopus 로고
    • Organisational structures to support concurrent engineering in construction
    • Anumba, C.J., Baugh, C. and Khalfan, M.M.A. (2002), "Organisational structures to support concurrent engineering in construction", Industrial Management & Data Systems, Vol. 102 No. 5, pp. 260-70.
    • (2002) Industrial Management & Data Systems , vol.102 , Issue.5 , pp. 260-270
    • Anumba, C.J.1    Baugh, C.2    Khalfan, M.M.A.3
  • 3
    • 0036499553 scopus 로고    scopus 로고
    • A process approach in measuring quality costs of construction projects: Model development
    • Aoieong, R.T., Tang, S.L. and Ahmed, S.M. (2002), "A process approach in measuring quality costs of construction projects: model development", Construction Management and Economics, Vol. 20, pp. 179-92.
    • (2002) Construction Management and Economics , vol.20 , pp. 179-192
    • Aoieong, R.T.1    Tang, S.L.2    Ahmed, S.M.3
  • 5
    • 30644476904 scopus 로고    scopus 로고
    • "Partnering, lean production and the high performance workplace", Proceedings of the 4th Annual Conference of the International Group for Lean Construction, available at: www.iglc.net/conferences/1996/papers/Barlow.pdf
    • Barlow, J. (1996), "Partnering, lean production and the high performance workplace", Proceedings of the 4th Annual Conference of the International Group for Lean Construction, available at: www.iglc.net/conferences/1996/papers/Barlow.pdf.
    • (1996)
    • Barlow, J.1
  • 8
    • 0032593173 scopus 로고    scopus 로고
    • Good practice in briefing: The limits of rationality
    • Barrett, P., Hudson, J. and Stanley, C. (1999), "Good practice in briefing: the limits of rationality", Automation in Construction, Vol. 8 No. 6, pp. 633-42.
    • (1999) Automation in Construction , vol.8 , Issue.6 , pp. 633-642
    • Barrett, P.1    Hudson, J.2    Stanley, C.3
  • 10
    • 0037391031 scopus 로고    scopus 로고
    • Exploitation, exploration, and process management: The productivity dilemma revisited
    • Benner, M.J. and Tushman, M.L. (2003), "Exploitation, exploration, and process management: the productivity dilemma revisited", Academy of Management Review, Vol. 28 No. 2, pp. 238-56.
    • (2003) Academy of Management Review , vol.28 , Issue.2 , pp. 238-256
    • Benner, M.J.1    Tushman, M.L.2
  • 11
    • 30644458171 scopus 로고    scopus 로고
    • "Building an organisational capability model to help deliver integrated solutions in complex products and systems", Proceedings of the Annual Meeting of the European Academy of Management (EURAM), 3-5 April, Bocconi University, Milan
    • Brady, T., Davies, A. and Hobday, M. (2003), "Building an organisational capability model to help deliver integrated solutions in complex products and systems", Proceedings of the Annual Meeting of the European Academy of Management (EURAM), 3-5 April, Bocconi University, Milan.
    • (2003)
    • Brady, T.1    Davies, A.2    Hobday, M.3
  • 13
    • 0040706449 scopus 로고    scopus 로고
    • A new way to manage process knowledge
    • Carr, N.G. (1999), "A new way to manage process knowledge", Harvard Business Review, September-October, pp. 24-5.
    • (1999) Harvard Business Review , pp. 24-25
    • Carr, N.G.1
  • 15
    • 33744870364 scopus 로고
    • Organizational structure, environment and performance: The role of strategic choice
    • Child, J. (1972), "Organizational structure, environment and performance: the role of strategic choice", Sociology, Vol. 6 No. 1, pp. 1-22.
    • (1972) Sociology , vol.6 , Issue.1 , pp. 1-22
    • Child, J.1
  • 17
    • 20144378762 scopus 로고    scopus 로고
    • The coming commoditization of processes
    • Davenport, T.H. (2005), "The coming commoditization of processes", Harvard Business Review, Vol. 83 No. 6, pp. 100-8.
    • (2005) Harvard Business Review , vol.83 , Issue.6 , pp. 100-108
    • Davenport, T.H.1
  • 18
    • 0002481047 scopus 로고
    • The new industrial engineering: Information technology and business process redesign
    • Davenport, T.H. and Short, J. (1990), "The new industrial engineering: information technology and business process redesign", Sloan Management Review, Vol. 31 No. 4, pp. 11-27.
    • (1990) Sloan Management Review , vol.31 , Issue.4 , pp. 11-27
    • Davenport, T.H.1    Short, J.2
  • 19
    • 30644459054 scopus 로고    scopus 로고
    • Department of Trade and Industry London available at: www.dti.gov.uk/sectorsbuilding.html (accessed 24 July 2003)
    • Department of Trade and Industry (2003), Building, Construction and Property Services, Department of Trade and Industry, London, available at: www.dti.gov.uk/sectorsbuilding.html (accessed 24 July 2003).
    • (2003) Building, Construction and Property Services
  • 21
    • 0009917656 scopus 로고
    • How new is business process redesign?
    • Earl, M. and Khan, B. (1994), "How new is business process redesign?", European Management Journal, Vol. 12, pp. 20-30.
    • (1994) European Management Journal , vol.12 , pp. 20-30
    • Earl, M.1    Khan, B.2
  • 25
    • 0000789088 scopus 로고    scopus 로고
    • Putting academic ideas into practice: Technological progress and the absorptive capacity of construction organisation
    • Gann, D.M. (2001), "Putting academic ideas into practice: technological progress and the absorptive capacity of construction organisation", Construction Management and Economics, Vol. 19 No. 3, pp. 321-30.
    • (2001) Construction Management and Economics , vol.19 , Issue.3 , pp. 321-330
    • Gann, D.M.1
  • 26
    • 0000090984 scopus 로고    scopus 로고
    • Innovation in project-based, service-enhanced firms: The construction of complex products and systems
    • Gann, D.M. and Salter, A.J. (2000), "Innovation in project-based, service-enhanced firms: the construction of complex products and systems", Research Policy, Vol. 29, pp. 955-72.
    • (2000) Research Policy , vol.29 , pp. 955-972
    • Gann, D.M.1    Salter, A.J.2
  • 28
    • 84992933843 scopus 로고    scopus 로고
    • The technocratic totalitarianism of construction process improvement: A critical perspective
    • Green, S.D. (1998), "The technocratic totalitarianism of construction process improvement: a critical perspective", Engineering, Construction and Architectural Management, Vol. 5 No. 4, pp. 376-86.
    • (1998) Engineering, Construction and Architectural Management , vol.5 , Issue.4 , pp. 376-386
    • Green, S.D.1
  • 29
    • 0037367569 scopus 로고    scopus 로고
    • Re-engineering construction: Going against the grain
    • Green, S.D. and May, S.C. (2003), "Re-engineering construction: going against the grain", Building Research & Information, Vol. 31 No. 2, pp. 97-106.
    • (2003) Building Research & Information , vol.31 , Issue.2 , pp. 97-106
    • Green, S.D.1    May, S.C.2
  • 30
    • 30644477909 scopus 로고    scopus 로고
    • "Continuous process improvement and learning on construction projects - the role of process capability assessments", PhD thesis, Research Institute for the Built and Human Environment, University of Salford, Salford
    • Haigh, R. (2004), "Continuous process improvement and learning on construction projects - the role of process capability assessments", PhD thesis, Research Institute for the Built and Human Environment, University of Salford, Salford.
    • (2004)
    • Haigh, R.1
  • 31
    • 0001167750 scopus 로고
    • Re-engineering work: Don't automate, obliterate
    • Hammer, M. (1990), "Re-engineering work: don't automate, obliterate", Harvard Business Review, Vol. 90 No. 4, pp. 104-12.
    • (1990) Harvard Business Review , vol.90 , Issue.4 , pp. 104-112
    • Hammer, M.1
  • 32
    • 0142107525 scopus 로고    scopus 로고
    • Random House Business Books London
    • Hammer, M. (2001), The Agenda, Random House Business Books, London.
    • (2001) The Agenda
    • Hammer, M.1
  • 34
    • 1642626262 scopus 로고    scopus 로고
    • How process enterprise really works
    • Hammer, M. and Stanton, S. (1999), "How process enterprise really works", Harvard Business Review, Vol. 77 No. 6, pp. 108-20.
    • (1999) Harvard Business Review , vol.77 , Issue.6 , pp. 108-120
    • Hammer, M.1    Stanton, S.2
  • 36
    • 0008677341 scopus 로고    scopus 로고
    • Product complexity, innovation and industrial organisation
    • Hobday, M. (1998), "Product complexity, innovation and industrial organisation", Research Policy, Vol. 26, pp. 689-710.
    • (1998) Research Policy , vol.26 , pp. 689-710
    • Hobday, M.1
  • 37
    • 0000090982 scopus 로고    scopus 로고
    • Innovation in complex products and system
    • Hobday, M. (2000a), "Innovation in complex products and system", Research Policy, Vol. 29, pp. 793-804.
    • (2000) Research Policy , vol.29 , pp. 793-804
    • Hobday, M.1
  • 38
    • 0000090983 scopus 로고    scopus 로고
    • The project-based organisation: An ideal form for managing complex products and systems?
    • Hobday, M. (2000b), "The project-based organisation: an ideal form for managing complex products and systems?", Research Policy, Vol. 29, pp. 871-93.
    • (2000) Research Policy , vol.29 , pp. 871-893
    • Hobday, M.1
  • 39
    • 30644462542 scopus 로고    scopus 로고
    • Making transfer happen: An action perspective on learning transfer systems
    • Holton, E.F. Baldwin, T.T. Jossey-Bass San Francisco, CA
    • Holton, E.F. and Baldwin, T.T. (2003), "Making transfer happen: an action perspective on learning transfer systems", in Holton, E.F. and Baldwin, T.T. (Eds), Improving Learning Transfer in Organizations, Jossey-Bass, San Francisco, CA.
    • (2003) Improving Learning Transfer in Organizations
    • Holton, E.F.1    Baldwin, T.T.2
  • 40
    • 30644466422 scopus 로고    scopus 로고
    • "Bringing light to the dark side of lean construction: a response to Stuart Green", Proceedings of The 7th Annual Conference International Group for Lean Construction, 26-28 July, University of California, Berkeley, CA
    • Howell, G.A. and Ballard, G. (1999), "Bringing light to the dark side of lean construction: a response to Stuart Green", Proceedings of The 7th Annual Conference International Group for Lean Construction, 26-28 July, University of California, Berkeley, CA.
    • (1999)
    • Howell, G.A.1    Ballard, G.2
  • 41
    • 84936824011 scopus 로고
    • Organizational learning: The contributing processes and the literatures
    • Huber, G.P. (1991), "Organizational learning: the contributing processes and the literatures", Organization Science, Vol. 2 No. 1, pp. 88-115.
    • (1991) Organization Science , vol.2 , Issue.1 , pp. 88-115
    • Huber, G.P.1
  • 43
    • 30644457010 scopus 로고    scopus 로고
    • "Process improvement in construction by knowledge sharing and integration", Proceedings of The 1st International SCRI Symposium, 30-31 March, University of Salford, Salford, pp. 88-98
    • Jeong, K.S. and Haigh, R. (2004), "Process improvement in construction by knowledge sharing and integration", Proceedings of The 1st International SCRI Symposium, 30-31 March, University of Salford, Salford, pp. 88-98.
    • (2004)
    • Jeong, K.S.1    Haigh, R.2
  • 46
    • 84986120981 scopus 로고    scopus 로고
    • Development of a readiness assessment model for concurrent engineering in construction
    • Khalfan, M.M.A., Anumba, C.J. and Carrillo, P.M. (2001), "Development of a readiness assessment model for concurrent engineering in construction", Benchmarking: An International Journal, Vol. 8 No. 3, pp. 223-39.
    • (2001) Benchmarking: An International Journal , vol.8 , Issue.3 , pp. 223-239
    • Khalfan, M.M.A.1    Anumba, C.J.2    Carrillo, P.M.3
  • 47
    • 0003656231 scopus 로고
    • Technical Report 72 Centre for Integrated Facility Engineering (CIFE) Stanford University, Stanford, CA
    • Koskela, L. (1992), Application of the New Production Philosophy to Construction, Technical Report 72, Centre for Integrated Facility Engineering (CIFE), Stanford University, Stanford, CA.
    • (1992) Application of the New Production Philosophy to Construction
    • Koskela, L.1
  • 49
    • 84970395482 scopus 로고
    • The transfer of management innovations from Japan
    • Lillrank, P. (1995), "The transfer of management innovations from Japan", Organisation Studies, Vol. 16 No. 6, pp. 971-89.
    • (1995) Organisation Studies , vol.16 , Issue.6 , pp. 971-989
    • Lillrank, P.1
  • 50
  • 51
    • 0006490018 scopus 로고
    • The management of resources and the resource of management
    • Mahoney, J.T. (1995), "The management of resources and the resource of management", Journal of Business Research, Vol. 33, pp. 91-101.
    • (1995) Journal of Business Research , vol.33 , pp. 91-101
    • Mahoney, J.T.1
  • 52
    • 0001812752 scopus 로고
    • Exploration and exploitation in organizational learning
    • March, J.G. (1991), "Exploration and exploitation in organizational learning", Organization Science, Vol. 2 No. 1, pp. 71-87.
    • (1991) Organization Science , vol.2 , Issue.1 , pp. 71-87
    • March, J.G.1
  • 53
    • 0344824053 scopus 로고    scopus 로고
    • Diffusing 'best practice' in multinational firms: Prospects, practice and contestation
    • Martin, G. and Beaumont, P. (1998), "Diffusing 'best practice' in multinational firms: prospects, practice and contestation", International Journal of Human Resource Management, Vol. 9 No. 4, pp. 671-95.
    • (1998) International Journal of Human Resource Management , vol.9 , Issue.4 , pp. 671-695
    • Martin, G.1    Beaumont, P.2
  • 54
    • 0346639662 scopus 로고    scopus 로고
    • A conceptual framework for understanding business processes and business process modelling
    • Melao, N. and Pidd, M. (2000), "A conceptual framework for understanding business processes and business process modelling", Information Systems Journal, Vol. 10, pp. 105-29.
    • (2000) Information Systems Journal , vol.10 , pp. 105-129
    • Melao, N.1    Pidd, M.2
  • 55
    • 0012763346 scopus 로고    scopus 로고
    • An innovative supply chain strategy for customized housing
    • Naim, M. and Barlow, J. (2003), "An innovative supply chain strategy for customized housing", Construction Management and Economics, Vol. 21, pp. 593-602.
    • (2003) Construction Management and Economics , vol.21 , pp. 593-602
    • Naim, M.1    Barlow, J.2
  • 56
    • 0242724677 scopus 로고    scopus 로고
    • HC 87 The Stationery Office London
    • National Audit Office (2001), Modernising Construction, HC 87, The Stationery Office, London.
    • (2001) Modernising Construction
  • 59
    • 30644470347 scopus 로고    scopus 로고
    • "SPICE: is the capability maturity model applicable in the construction industry?", Proceedings of The 8th International Conference on Durability of Building Materials and Components, 30 May-3 June, CIB W78, Vancouver, pp. 2836-43
    • Sarshar, M., Finnemore, M. and Haigh, R. (1999a), "SPICE: is the capability maturity model applicable in the construction industry?", Proceedings of The 8th International Conference on Durability of Building Materials and Components, 30 May-3 June, CIB W78, Vancouver, pp. 2836-43.
    • (1999)
    • Sarshar, M.1    Finnemore, M.2    Haigh, R.3
  • 60
    • 84993044907 scopus 로고    scopus 로고
    • Improving project processes: Best practice case study
    • Sarshar, M., Haigh, R. and Amaratunga, D. (2004), "Improving project processes: best practice case study", Construction Innovation, Vol. 4, pp. 69-82.
    • (2004) Construction Innovation , vol.4 , pp. 69-82
    • Sarshar, M.1    Haigh, R.2    Amaratunga, D.3
  • 61
    • 30644460310 scopus 로고    scopus 로고
    • "Standardised process improvement for construction enterprises (SPICE): research methodology and approach", paper presented at Challenge of Change: Building & Construction in the New Millennium, Royal Institute of Chartered Surveyors (RICS) COBRA Annual Conference, Salford, 1-2 September
    • Sarshar, M., Haigh, R., Finnemore, M., Aouad, G. and Barrett, P. (1999b), "Standardised process improvement for construction enterprises (SPICE): research methodology and approach", paper presented at Challenge of Change: Building & Construction in the New Millennium, Royal Institute of Chartered Surveyors (RICS) COBRA Annual Conference, Salford, 1-2 September.
    • (1999)
    • Sarshar, M.1    Haigh, R.2    Finnemore, M.3    Aouad, G.4    Barrett, P.5
  • 63
    • 0141959790 scopus 로고    scopus 로고
    • Appropriate innovation in small construction firms
    • Sexton, M. and Barrett, P. (2003a), "Appropriate innovation in small construction firms", Construction Management and Economics, Vol. 21, pp. 623-33.
    • (2003) Construction Management and Economics , vol.21 , pp. 623-633
    • Sexton, M.1    Barrett, P.2
  • 64
    • 0141890852 scopus 로고    scopus 로고
    • A literature synthesis of innovation in small construction firms: Insights, ambiguities and questions
    • Sexton, M. and Barrett, P. (2003b), "A literature synthesis of innovation in small construction firms: insights, ambiguities and questions", Construction Management and Economics, Vol. 21, pp. 613-22.
    • (2003) Construction Management and Economics , vol.21 , pp. 613-622
    • Sexton, M.1    Barrett, P.2
  • 65
    • 9444243216 scopus 로고    scopus 로고
    • The role of technology transfer in innovation within small construction firms
    • Sexton, M. and Barrett, P. (2004), "The role of technology transfer in innovation within small construction firms", Engineering, Construction and Architectural Management, Vol. 11 No. 5, pp. 342-8.
    • (2004) Engineering, Construction and Architectural Management , vol.11 , Issue.5 , pp. 342-348
    • Sexton, M.1    Barrett, P.2
  • 66
    • 12844286866 scopus 로고    scopus 로고
    • Performance-based building and innovation: Balancing client and industry needs
    • Sexton, M. and Barrett, P. (2005), "Performance-based building and innovation: balancing client and industry needs", Building Research & Information, Vol. 33 No. 2, pp. 142-8.
    • (2005) Building Research & Information , vol.33 , Issue.2 , pp. 142-148
    • Sexton, M.1    Barrett, P.2
  • 68
    • 38149059709 scopus 로고    scopus 로고
    • Strategic Forum for Construction London
    • Strategic Forum for Construction (2002), Accelerating Change, Rethinking Construction, Strategic Forum for Construction, London.
    • (2002) Accelerating Change, Rethinking Construction
  • 69
    • 0002120459 scopus 로고    scopus 로고
    • Strategies for managing knowledge assets: The role of firm structure and industrial context
    • Teece, D.J. (2000), "Strategies for managing knowledge assets: the role of firm structure and industrial context", Long Range Planning, Vol. 33, pp. 35-54.
    • (2000) Long Range Planning , vol.33 , pp. 35-54
    • Teece, D.J.1
  • 70
    • 0342775775 scopus 로고    scopus 로고
    • Dynamic capabilities and strategic management
    • Teece, D.J., Pisano, G. and Shuen, S. (1997), "Dynamic capabilities and strategic management", Strategic Management Journal, Vol. 18 No. 7, pp. 509-33.
    • (1997) Strategic Management Journal , vol.18 , Issue.7 , pp. 509-533
    • Teece, D.J.1    Pisano, G.2    Shuen, S.3
  • 71
    • 0141994502 scopus 로고    scopus 로고
    • Construction and the time compression paradigm
    • Towill, D.R. (2003), "Construction and the time compression paradigm", Construction Management and Economics, Vol. 21, pp. 581-91.
    • (2003) Construction Management and Economics , vol.21 , pp. 581-591
    • Towill, D.R.1
  • 73
    • 84986132547 scopus 로고    scopus 로고
    • Organisational learning and innovation in the construction industry
    • Vakola, M. and Rezgui, Y. (2000), "Organisational learning and innovation in the construction industry", The Learning Organization, Vol. 7 No. 4, pp. 174-83.
    • (2000) The Learning Organization , vol.7 , Issue.4 , pp. 174-183
    • Vakola, M.1    Rezgui, Y.2
  • 76
    • 0037366619 scopus 로고    scopus 로고
    • Models of manufacturing and the construction process: The genesis of re-engineering construction
    • Winch, G. (2003a), "Models of manufacturing and the construction process: the genesis of re-engineering construction", Building Research & Information, Vol. 31 No. 2, pp. 107-18.
    • (2003) Building Research & Information , vol.31 , Issue.2 , pp. 107-118
    • Winch, G.1
  • 77
    • 0037367689 scopus 로고    scopus 로고
    • Re-valuing construction
    • Winch, G. (2003b), "Re-valuing construction", Building Research & Information, Vol. 31 No. 2, pp. 82-4.
    • (2003) Building Research & Information , vol.31 , Issue.2 , pp. 82-84
    • Winch, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.