-
1
-
-
5244376247
-
Incentive/disincentive provisions in highway contracts
-
Arditi, D., Khisty, J., and Yasamis, F. (1997). "Incentive/ disincentive provisions in highway contracts." J. Constr. Eng. Manage., 123(3), 302-307.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 302-307
-
-
Arditi, D.1
Khisty, J.2
Yasamis, F.3
-
3
-
-
84861293139
-
-
Sacramento, Calif, (October 1)
-
California Department of Transportation (Caltrans). (2003). "Long-life pavement rehabilitation strategies." Sacramento, Calif, 〈http://www.dot.ca.gov/research/roadway/llprs/llprs.htm〉 (October 1).
-
(2003)
Long-life Pavement Rehabilitation Strategies
-
-
-
4
-
-
29044449007
-
-
Sacramento, Calif. (October 3)
-
California Department of Transportation (Caltrans). (2004). "I-15 Devore Rapid Rehab Project." Sacramento, Calif. 〈http://www.dot.ca. gov/dist8/i15devore/〉 (October 3).
-
(2004)
I-15 Devore Rapid Rehab Project
-
-
-
5
-
-
29044434295
-
Public roads
-
winter
-
Federal Highway Administration (FHWA). (1996). "Public roads." J. Highway Research Development, 59(3), winter.
-
(1996)
J. Highway Research Development
, vol.59
, Issue.3
-
-
-
6
-
-
11644308477
-
Lane rental-Innovative way to reduce road construction time
-
Herbsman, Z. J., and Glagola, C. R. (1998). "Lane rental-Innovative way to reduce road construction time." J. Constr. Eng. Manage., 124(5), 411-417.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.5
, pp. 411-417
-
-
Herbsman, Z.J.1
Glagola, C.R.2
-
7
-
-
15944379640
-
A computer simulation model: Construction analysis for highway rehabilitation strategies (CA4PRS)
-
Lee, E. B., and Ibbs, C. W. (2005). "A computer simulation model: Construction analysis for highway rehabilitation strategies (CA4PRS)" J. Constr. Eng. Manage., 131(4), 449-458.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.4
, pp. 449-458
-
-
Lee, E.B.1
Ibbs, C.W.2
-
8
-
-
0034433072
-
Construction productivity and constraints for concrete pavement rehabilitation in urban corridors
-
Transportation Research Board, Washington, D.C.
-
Lee, E. B., Ibbs, W., Roesler, J., and Harvey, J. (2000). "Construction productivity and constraints for concrete pavement rehabilitation in urban corridors." Transportation Research Record, 1712, Transportation Research Board, Washington, D.C., 13-22.
-
(2000)
Transportation Research Record
, vol.1712
, pp. 13-22
-
-
Lee, E.B.1
Ibbs, W.2
Roesler, J.3
Harvey, J.4
-
9
-
-
15944414569
-
Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis
-
in press
-
Lee, E. B, Ibbs, C. W., and Thomas, D. (2005a). "Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis." J. Infrastruct. Syst., in press.
-
(2005)
J. Infrastruct. Syst.
-
-
Lee, E.B.1
Ibbs, C.W.2
Thomas, D.3
-
10
-
-
29144475511
-
Accelerated pavement rehabilitation and reconstruction with long-life asphalt concrete on high-trafficked urban highway
-
in press
-
Lee, E. B., Lee, H. J., and Akbarian, M. (2005b). "Accelerated pavement rehabilitation and reconstruction with long-life asphalt concrete on high-trafficked urban highway." J. Transportation Research Board, in press.
-
(2005)
J. Transportation Research Board
-
-
Lee, E.B.1
Lee, H.J.2
Akbarian, M.3
-
11
-
-
0012656277
-
Case study of urban concrete pavement reconstruction on Interstate 10
-
Lee, E. B., Roesler, J. R., Harvey, J. T., and Ibbs, C. W. (2002). "Case study of urban concrete pavement reconstruction on Interstate 10." J. Constr. Eng. Manage., 128(1), 49-56.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.1
, pp. 49-56
-
-
Lee, E.B.1
Roesler, J.R.2
Harvey, J.T.3
Ibbs, C.W.4
-
12
-
-
0142174789
-
Evaluation of longer-life concrete pavements for California using accelerated pavement testing
-
Reno, Nev.
-
Roesler, J. R., Harvey, J., Hung, D., du Plessis, L., and Bush, D. (1999). "Evaluation of longer-life concrete pavements for California using accelerated pavement testing." Proc., Accelerated Pavement Testing International Conf., Reno, Nev.
-
(1999)
Proc., Accelerated Pavement Testing International Conf.
-
-
Roesler, J.R.1
Harvey, J.2
Hung, D.3
Du Plessis, L.4
Bush, D.5
-
13
-
-
14744281187
-
MultiCool: A numerical solution program for multi-layer cooling time of asphalt concrete pavement
-
Timm, D., Voller, V., Lee, E. B., and Harvey, J. (2001). "MultiCool: A numerical solution program for multi-layer cooling time of asphalt concrete pavement." Int. J. Pavement Eng., 2(3), 169-185.
-
(2001)
Int. J. Pavement Eng.
, vol.2
, Issue.3
, pp. 169-185
-
-
Timm, D.1
Voller, V.2
Lee, E.B.3
Harvey, J.4
-
14
-
-
0003693579
-
-
National Research Council, Washington, D.C.
-
Transportation Research Board. (2000) Highway capacity manual (HCM), National Research Council, Washington, D.C.
-
(2000)
Highway Capacity Manual (HCM)
-
-
-
15
-
-
84861294671
-
-
Madison, Wis., (June 12)
-
Wisconsin Department of Transportation (WisDOT. (2002). "Plans & projects: Existing highways." Madison, Wis. 〈http://www.dot. wisconsin.gov/projects/state/sixyear/hwys.htm〉 (June 12).
-
(2002)
Plans & Projects: Existing Highways
-
-
|