메뉴 건너뛰기




Volumn 131, Issue 12, 2005, Pages 1283-1291

Integrated design/construction/operations analysis for fast-track urban freeway reconstruction

Author keywords

Case reports; Concrete pavements; Constructability; Fast track construction; Highway construction; Reconstruction

Indexed keywords

CASE REPORTS; FAST TRACK CONSTRUCTION; HIGHWAY CONSTRUCTION;

EID: 28844454200     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:12(1283)     Document Type: Article
Times cited : (11)

References (15)
  • 1
    • 5244376247 scopus 로고    scopus 로고
    • Incentive/disincentive provisions in highway contracts
    • Arditi, D., Khisty, J., and Yasamis, F. (1997). "Incentive/ disincentive provisions in highway contracts." J. Constr. Eng. Manage., 123(3), 302-307.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 302-307
    • Arditi, D.1    Khisty, J.2    Yasamis, F.3
  • 3
    • 84861293139 scopus 로고    scopus 로고
    • Sacramento, Calif, (October 1)
    • California Department of Transportation (Caltrans). (2003). "Long-life pavement rehabilitation strategies." Sacramento, Calif, 〈http://www.dot.ca.gov/research/roadway/llprs/llprs.htm〉 (October 1).
    • (2003) Long-life Pavement Rehabilitation Strategies
  • 4
    • 29044449007 scopus 로고    scopus 로고
    • Sacramento, Calif. (October 3)
    • California Department of Transportation (Caltrans). (2004). "I-15 Devore Rapid Rehab Project." Sacramento, Calif. 〈http://www.dot.ca. gov/dist8/i15devore/〉 (October 3).
    • (2004) I-15 Devore Rapid Rehab Project
  • 5
    • 29044434295 scopus 로고    scopus 로고
    • Public roads
    • winter
    • Federal Highway Administration (FHWA). (1996). "Public roads." J. Highway Research Development, 59(3), winter.
    • (1996) J. Highway Research Development , vol.59 , Issue.3
  • 6
    • 11644308477 scopus 로고    scopus 로고
    • Lane rental-Innovative way to reduce road construction time
    • Herbsman, Z. J., and Glagola, C. R. (1998). "Lane rental-Innovative way to reduce road construction time." J. Constr. Eng. Manage., 124(5), 411-417.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.5 , pp. 411-417
    • Herbsman, Z.J.1    Glagola, C.R.2
  • 7
    • 15944379640 scopus 로고    scopus 로고
    • A computer simulation model: Construction analysis for highway rehabilitation strategies (CA4PRS)
    • Lee, E. B., and Ibbs, C. W. (2005). "A computer simulation model: Construction analysis for highway rehabilitation strategies (CA4PRS)" J. Constr. Eng. Manage., 131(4), 449-458.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 449-458
    • Lee, E.B.1    Ibbs, C.W.2
  • 8
    • 0034433072 scopus 로고    scopus 로고
    • Construction productivity and constraints for concrete pavement rehabilitation in urban corridors
    • Transportation Research Board, Washington, D.C.
    • Lee, E. B., Ibbs, W., Roesler, J., and Harvey, J. (2000). "Construction productivity and constraints for concrete pavement rehabilitation in urban corridors." Transportation Research Record, 1712, Transportation Research Board, Washington, D.C., 13-22.
    • (2000) Transportation Research Record , vol.1712 , pp. 13-22
    • Lee, E.B.1    Ibbs, W.2    Roesler, J.3    Harvey, J.4
  • 9
    • 15944414569 scopus 로고    scopus 로고
    • Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis
    • in press
    • Lee, E. B, Ibbs, C. W., and Thomas, D. (2005a). "Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis." J. Infrastruct. Syst., in press.
    • (2005) J. Infrastruct. Syst.
    • Lee, E.B.1    Ibbs, C.W.2    Thomas, D.3
  • 10
    • 29144475511 scopus 로고    scopus 로고
    • Accelerated pavement rehabilitation and reconstruction with long-life asphalt concrete on high-trafficked urban highway
    • in press
    • Lee, E. B., Lee, H. J., and Akbarian, M. (2005b). "Accelerated pavement rehabilitation and reconstruction with long-life asphalt concrete on high-trafficked urban highway." J. Transportation Research Board, in press.
    • (2005) J. Transportation Research Board
    • Lee, E.B.1    Lee, H.J.2    Akbarian, M.3
  • 11
    • 0012656277 scopus 로고    scopus 로고
    • Case study of urban concrete pavement reconstruction on Interstate 10
    • Lee, E. B., Roesler, J. R., Harvey, J. T., and Ibbs, C. W. (2002). "Case study of urban concrete pavement reconstruction on Interstate 10." J. Constr. Eng. Manage., 128(1), 49-56.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.1 , pp. 49-56
    • Lee, E.B.1    Roesler, J.R.2    Harvey, J.T.3    Ibbs, C.W.4
  • 13
    • 14744281187 scopus 로고    scopus 로고
    • MultiCool: A numerical solution program for multi-layer cooling time of asphalt concrete pavement
    • Timm, D., Voller, V., Lee, E. B., and Harvey, J. (2001). "MultiCool: A numerical solution program for multi-layer cooling time of asphalt concrete pavement." Int. J. Pavement Eng., 2(3), 169-185.
    • (2001) Int. J. Pavement Eng. , vol.2 , Issue.3 , pp. 169-185
    • Timm, D.1    Voller, V.2    Lee, E.B.3    Harvey, J.4
  • 14
    • 0003693579 scopus 로고    scopus 로고
    • National Research Council, Washington, D.C.
    • Transportation Research Board. (2000) Highway capacity manual (HCM), National Research Council, Washington, D.C.
    • (2000) Highway Capacity Manual (HCM)
  • 15
    • 84861294671 scopus 로고    scopus 로고
    • Madison, Wis., (June 12)
    • Wisconsin Department of Transportation (WisDOT. (2002). "Plans & projects: Existing highways." Madison, Wis. 〈http://www.dot. wisconsin.gov/projects/state/sixyear/hwys.htm〉 (June 12).
    • (2002) Plans & Projects: Existing Highways


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.