메뉴 건너뛰기




Volumn 18, Issue 1, 2005, Pages 41-52

An order dispatcher for dispersed manufacturers solved by a mixed-variable hybrid genetic algorithm

Author keywords

[No Author keywords available]

Indexed keywords

GENETIC ALGORITHMS; INTEGER PROGRAMMING; MATHEMATICAL MODELS; PROBLEM SOLVING;

EID: 27844511464     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/0951192042000237519     Document Type: Article
Times cited : (5)

References (29)
  • 1
    • 0042206805 scopus 로고
    • Some facets for an assignment problem with side constraints
    • Aboudi, R. and Nemhauser, G.L., Some facets for an assignment problem with side constraints. Operations Research, 1991, 39(2), 244-250.
    • (1991) Operations Research , vol.39 , Issue.2 , pp. 244-250
    • Aboudi, R.1    Nemhauser, G.L.2
  • 4
    • 0032633864 scopus 로고    scopus 로고
    • The assignment problem with seniority and job priority constraints
    • Caron, G., Hansen, P. and Jaumard, B., The assignment problem with seniority and job priority constraints. Operations Research, 1999, 47(3), 449-453.
    • (1999) Operations Research , vol.47 , Issue.3 , pp. 449-453
    • Caron, G.1    Hansen, P.2    Jaumard, B.3
  • 5
    • 0347138149 scopus 로고    scopus 로고
    • Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach
    • Chang, P.T. and Lo, Y.T., Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach, International Journal of Computer Integrated Manufacturing, 2001, 14(4), 367-384.
    • (2001) International Journal of Computer Integrated Manufacturing , vol.14 , Issue.4 , pp. 367-384
    • Chang, P.T.1    Lo, Y.T.2
  • 6
    • 0032041372 scopus 로고    scopus 로고
    • Job shop scheduling for missed due-date performance
    • Cheng, T.C.E. and Jiang, J., Job shop scheduling for missed due-date performance. Computers & Industrial Engineering, 1998, 34(2), 297-307.
    • (1998) Computers & Industrial Engineering , vol.34 , Issue.2 , pp. 297-307
    • Cheng, T.C.E.1    Jiang, J.2
  • 10
    • 0035401203 scopus 로고    scopus 로고
    • A Tabu search heuristic for the generalized assignment problem
    • Diaz, J.A. and Fernandez, E., A Tabu search heuristic for the generalized assignment problem. European Journal of Operational Research, 2001, 132, 22-38.
    • (2001) European Journal of Operational Research , vol.132 , pp. 22-38
    • Diaz, J.A.1    Fernandez, E.2
  • 16
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • Gordon, V., Proth, J.M. and Chu, C., A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research, 2002, 139, 1-25.
    • (2002) European Journal of Operational Research , vol.139 , pp. 1-25
    • Gordon, V.1    Proth, J.M.2    Chu, C.3
  • 17
    • 0242650223 scopus 로고    scopus 로고
    • Next generation computer integrated manufacturing strategies and tachniques
    • Gunasekaran, A., Next generation computer integrated manufacturing strategies and tachniques. International Journal of Computer Integrated Manufacturing, 2001, 14(2), 137-139.
    • (2001) International Journal of Computer Integrated Manufacturing , vol.14 , Issue.2 , pp. 137-139
    • Gunasekaran, A.1
  • 19
    • 0343517765 scopus 로고    scopus 로고
    • Solving an assignment-selection problem with verbal information and using genetic algorithms
    • Herrera, F., Lopez, E., Mendana, C. and Rodriguez, M.A., Solving an assignment-selection problem with verbal information and using genetic algorithms. European Journal of Operational Research, 1999, 119, 326- 337.
    • (1999) European Journal of Operational Research , vol.119 , pp. 326-337
    • Herrera, F.1    Lopez, E.2    Mendana, C.3    Rodriguez, M.A.4
  • 22
    • 0022746883 scopus 로고
    • Resource-constrained assignment scheduling
    • Mazzola, J.B. and Ian, A.W., Resource-constrained assignment scheduling. Operations Research, 1986, 34(4), 560-572.
    • (1986) Operations Research , vol.34 , Issue.4 , pp. 560-572
    • Mazzola, J.B.1    Ian, A.W.2
  • 24
    • 84867971809 scopus 로고    scopus 로고
    • Single machine scheduling with assignable due dates
    • Qi, X., Yu, G. and Bard, J.F., Single machine scheduling with assignable due dates. Discrete Applied Mathematics, 2002, 122, 211-233.
    • (2002) Discrete Applied Mathematics , vol.122 , pp. 211-233
    • Qi, X.1    Yu, G.2    Bard, J.F.3
  • 25
    • 0034316129 scopus 로고    scopus 로고
    • Machine loading algorithms for the elimination of tardy jobs in flexible batch machining applications
    • Rahimifard, S. and Newman, S.T., Machine loading algorithms for the elimination of tardy jobs in flexible batch machining applications. Journal of Materials Processing Technology, 2000, 107, 450-458.
    • (2000) Journal of Materials Processing Technology , vol.107 , pp. 450-458
    • Rahimifard, S.1    Newman, S.T.2
  • 28
    • 0033727977 scopus 로고    scopus 로고
    • Heuristic and exact algorithms for the simultaneous assignment problem
    • Yamada, T. and Nasu, Y., Heuristic and exact algorithms for the simultaneous assignment problem. European Journal of Operational Research, 2000, 123, 531-542.
    • (2000) European Journal of Operational Research , vol.123 , pp. 531-542
    • Yamada, T.1    Nasu, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.