메뉴 건너뛰기




Volumn , Issue , 2005, Pages 422-427

A decision support model for determining the applicability of Prognostic Health Management (PHM) approaches to electronic systems

Author keywords

Cost modeling; Decision support; Imperfect monitoring; Prognostic health management (PHM)

Indexed keywords

COST MODELING; DECISION SUPPORT; IMPERFECT MODELING; PROGNOSTIC HEALTH MANAGEMENT (PHM); IMPERFECT MONITORING;

EID: 27744485540     PISSN: 0149144X     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (27)

References (13)
  • 3
    • 0242494883 scopus 로고    scopus 로고
    • In-situ sensors for product reliability monitoring
    • S. Mishra, M. Pecht, D. Goodman, "In-situ Sensors for Product Reliability Monitoring," Proceedings of SPIE, Vol. 4755, 2002, pp. 10-19.
    • (2002) Proceedings of SPIE , vol.4755 , pp. 10-19
    • Mishra, S.1    Pecht, M.2    Goodman, D.3
  • 9
    • 0024718118 scopus 로고
    • A survey of preventative maintenance models for stochastically determining single-unit systems
    • C. Valdez-Flores, R. Feldman, "A Survey of Preventative Maintenance Models for Stochastically Determining Single-Unit Systems," Naval Research Logistics, Vol. 36, 1989, pp. 419-446.
    • (1989) Naval Research Logistics , vol.36 , pp. 419-446
    • Valdez-Flores, C.1    Feldman, R.2
  • 10
    • 0026417692 scopus 로고
    • A survey of preventative maintenance models for multi-unit systems
    • D. Cho, M. Parlar, "A Survey of Preventative Maintenance Models for Multi-Unit Systems," European J. Operational Research, Vol. 51, 1991, pp. 1-23.
    • (1991) European J. Operational Research , vol.51 , pp. 1-23
    • Cho, D.1    Parlar, M.2
  • 11
    • 0034655050 scopus 로고    scopus 로고
    • A model to determine the optimal critical level and the monitoring intervals in condition-based maintenance
    • W. Wang, "A Model to Determine the Optimal Critical Level and the Monitoring Intervals in Condition-Based Maintenance," Int. J. Production Research, Vol. 38, No. 6, 2000, pp. 1425-1436.
    • (2000) Int. J. Production Research , vol.38 , Issue.6 , pp. 1425-1436
    • Wang, W.1
  • 12
    • 0742307383 scopus 로고    scopus 로고
    • Optimization of replacement times using imperfect monitoring information
    • December
    • A. Barros, C. Berenguer, A. Grall, "Optimization of Replacement Times Using Imperfect Monitoring Information," IEEE Trans. on Reliability, Vol. 52, No. 4, (December) 2003, pp. 523-533.
    • (2003) IEEE Trans. on Reliability , vol.52 , Issue.4 , pp. 523-533
    • Barros, A.1    Berenguer, C.2    Grall, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.