메뉴 건너뛰기




Volumn 41, Issue 3, 2004, Pages 323-330

Probabilistic safety assessment for instrumentation and control systems in nuclear power plants: An overview

Author keywords

Common cause failures; Graded quality assurance; Instrumentation and control systems; Nuclear power plants; Power system deregulation; Probabilistic safety assessment; Risk informed regulation

Indexed keywords

ACCIDENT PREVENTION; CONTROL SYSTEMS; DEREGULATION; ELECTRICITY; FAILURE (MECHANICAL); NUCLEAR ENERGY; NUCLEAR INDUSTRY; QUALITY ASSURANCE;

EID: 2442462439     PISSN: 00223131     EISSN: None     Source Type: Journal    
DOI: 10.1080/18811248.2004.9715491     Document Type: Article
Times cited : (20)

References (51)
  • 1
    • 0033169410 scopus 로고    scopus 로고
    • Issues for nuclear plants in a deregulated electricity supply industry
    • J. D. Shiffer, “Issues for nuclear plants in a deregulated electricity supply industry,” Nucl. Energy, 38[4], 259 (1999).
    • (1999) Nucl. Energy , vol.38 , Issue.4 , pp. 259
    • Shiffer, J.D.1
  • 3
    • 2442570527 scopus 로고    scopus 로고
    • Modernizing and maintaining instrumentation and control systems to increase the competitiveness of nuclear power plants in a deregulated environment
    • Washington, D.C., Nov. 13-17
    • J. Naser, R. Torok, S. Ramesh, “Modernizing and maintaining instrumentation and control systems to increase the competitiveness of nuclear power plants in a deregulated environment,” The Third American Nuclear Society International Topical Meeting on NPIC&HMIT, Washington, D.C., Nov. 13-17, 2000, (2000).
    • (2000) The Third American Nuclear Society International Topical Meeting on Npic&Hmit , vol.2000
    • Naser, J.1    Torok, R.2    Ramesh, S.3
  • 5
    • 0032655011 scopus 로고    scopus 로고
    • On the use of probabilistic and deterministic methods in risk analysis
    • K. Christian, “On the use of probabilistic and deterministic methods in risk analysis,” J. Loss Prevention Process Ind., 12, 399 (1999).
    • (1999) J. Loss Prevention Process Ind. , vol.12 , pp. 399
    • Christian, K.1
  • 8
    • 0006900347 scopus 로고
    • Probabilistic assessment of risk for reactor design and sitting
    • I. B. Wall, “Probabilistic assessment of risk for reactor design and sitting,” Trans. Am. Nucl. Soc., 12, 1 (1969).
    • (1969) Trans. Am. Nucl. Soc. , vol.12 , pp. 1
    • Wall, I.B.1
  • 9
    • 0014922772 scopus 로고
    • Reactor sitting and design from a risk viewpoint
    • H. J. Otway, R.C. Erdmann, “Reactor sitting and design from a risk viewpoint,” Nucl. Eng. Des., 3, 365 (1970).
    • (1970) Nucl. Eng. Des. , vol.3 , pp. 365
    • Otway, H.J.1    Erdmann, R.C.2
  • 13
    • 0030166313 scopus 로고    scopus 로고
    • Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook nuclear plant units 1 and 2
    • R. C. Carruth, W. G. Sotos, “Design concepts for the reactor protection and control process instrumentation digital upgrade project at the Donald C. Cook nuclear plant units 1 and 2,” IEEE Trans. Nucl. Sci., 43[3], 1899 (1996).
    • (1996) IEEE Trans. Nucl. Sci. , vol.43 , Issue.3 , pp. 1899
    • Carruth, R.C.1    Sotos, W.G.2
  • 16
    • 2442459492 scopus 로고    scopus 로고
    • Reliability modeling of digital safety systems of nuclear power plant
    • Japan, April
    • P. V. Varde, D. Y. Lee, J. B. Han, “Reliability modeling of digital safety systems of nuclear power plant,” 11th Int. Conf. On Nuclear Engineering, Japan, April 20-23, 2003, (2003).
    • (2003) 11Th Int. Conf. On Nuclear Engineering , vol.2003 , pp. 20-23
    • Varde, P.V.1    Lee, D.Y.2    Han, J.B.3
  • 21
    • 0032909453 scopus 로고    scopus 로고
    • Context in the risk assessment of digital systems
    • C. J. Garrett, G. E. Apostolakis, “Context in the risk assessment of digital systems,” Risk Anal., 19[1], 23 (1999).
    • (1999) Risk Anal. , vol.19 , Issue.1 , pp. 23
    • Garrett, C.J.1    Apostolakis, G.E.2
  • 22
  • 24
    • 0035213620 scopus 로고    scopus 로고
    • Recent application of PSA for managing nuclear power plant safety
    • I. B. Wall, J. J. Haugh, et al., “Recent application of PSA for managing nuclear power plant safety,” Prog. Nucl. Energy, 39, 367 (2001).
    • (2001) Prog. Nucl. Energy , vol.39 , pp. 367
    • Wall, I.B.1    Haugh, J.J.2
  • 25
    • 0008478335 scopus 로고    scopus 로고
    • Probabilistic safety assessment past, present and future: An IAEA perspective
    • L. Lederman, F. Niehaus, B. Tomic, “Probabilistic safety assessment past, present and future: An IAEA perspective,” Nucl. Eng. Des., 160, 273 (1996).
    • (1996) Nucl. Eng. Des. , vol.160 , pp. 273
    • Lederman, L.1    Niehaus, F.2    Tomic, B.3
  • 26
    • 0035545683 scopus 로고    scopus 로고
    • Use of risk assessment in the nuclear industry with specific reference to the Australian situation
    • R. F. Cameron, A. Willers, “Use of risk assessment in the nuclear industry with specific reference to the Australian situation,” Reliab. Eng. Syst. Saf., 74, 275 (2001).
    • (2001) Reliab. Eng. Syst. Saf. , vol.74 , pp. 275
    • Cameron, R.F.1    Willers, A.2
  • 27
    • 0036891201 scopus 로고    scopus 로고
    • An analysis of safety-critical digital systems for risk-informed design
    • H. G. Kang, T. Sung, “An analysis of safety-critical digital systems for risk-informed design,” Reliab. Eng. Syst. Saf., 78, 307 (2002).
    • (2002) Reliab. Eng. Syst. Saf. , vol.78 , pp. 307
    • Kang, H.G.1    Sung, T.2
  • 28
    • 0027808825 scopus 로고
    • What is living PSA?
    • R. I. Freeman, G. R. Moir, “What is living PSA?,” Nucl. Energy, 32[6], 355 (1993).
    • (1993) Nucl. Energy , vol.32 , Issue.6 , pp. 355
    • Freeman, R.I.1    Moir, G.R.2
  • 29
    • 0031549809 scopus 로고    scopus 로고
    • Living PSA-risk monitoring—Current use and developments
    • P. Kafka, “Living PSA-risk monitoring—Current use and developments,” Nucl. Eng. Des., 175[3], 197 (1997).
    • (1997) Nucl. Eng. Des. , vol.175 , Issue.3 , pp. 197
    • Kafka, P.1
  • 30
    • 2442459408 scopus 로고    scopus 로고
    • Real time risk assessment of operational events
    • L. J. Perryman, N. A. S. Foster, et al., “Real time risk assessment of operational events,” Nucl. Eng. Des., 160[1-2], 203 (1996).
    • (1996) Nucl. Eng. Des. , vol.160 , Issue.1 , pp. 203
    • Perryman, L.J.1    Foster, N.A.S.2
  • 31
    • 0036571185 scopus 로고    scopus 로고
    • Optimization of power plant operation— Application of plant specific PSA
    • K. Gotz, T. Richter, “Optimization of power plant operation— Application of plant specific PSA,” Nucl. Eng., 43[3], 71 (2002).
    • (2002) Nucl. Eng. , vol.43 , Issue.3 , pp. 71
    • Gotz, K.1    Richter, T.2
  • 34
    • 0037401790 scopus 로고    scopus 로고
    • Conservative availability analyses including dependent failures in redundant I&C-systems with recurrent tests
    • H. D. Fischer, “Conservative availability analyses including dependent failures in redundant I&C-systems with recurrent tests,” Nucl. Eng. Des., 222, 79 (2003).
    • (2003) Nucl. Eng. Des. , vol.222 , pp. 79
    • Fischer, H.D.1
  • 35
    • 0024610915 scopus 로고
    • Defense-in-depth concept for nuclear power plant normal plant control systems using probability analysis
    • J. J. Lisboa, “Defense-in-depth concept for nuclear power plant normal plant control systems using probability analysis,” IEEE Trans. Nucl. Sci., 36[1], 1284 (1989).
    • (1989) IEEE Trans. Nucl. Sci. , vol.36 , Issue.1 , pp. 1284
    • Lisboa, J.J.1
  • 36
    • 0031988439 scopus 로고    scopus 로고
    • Reliability analysis of microcomputer circuit modules and computer based control systems important to safety of nuclear power plants
    • S. K. Khobare, S. V. Shrikhande, et al., “Reliability analysis of microcomputer circuit modules and computer based control systems important to safety of nuclear power plants,” Reliab. Eng. Syst. Saf., 59, 253 (1998).
    • (1998) Reliab. Eng. Syst. Saf. , vol.59 , pp. 253
    • Khobare, S.K.1    Shrikhande, S.V.2
  • 37
    • 0036645880 scopus 로고    scopus 로고
    • Optimization of safety equipment outages improves safety
    • M. Cepin, “Optimization of safety equipment outages improves safety,” Reliab. Eng. Syst. Saf., 77, 71 (2002).
    • (2002) Reliab. Eng. Syst. Saf. , vol.77 , pp. 71
    • Cepin, M.1
  • 39
    • 85010589270 scopus 로고    scopus 로고
    • A GQA resource allocation approach for digital I&C project
    • Detroit, MI, Oct
    • S. Yih, C. F. Fan, “A GQA resource allocation approach for digital I&C project,” Int. Topical Meeting on Probabilistic Safety Assessment, Detroit, MI, Oct. 6-9, 2002, 196 (2002).
    • (2002) Int. Topical Meeting on Probabilistic Safety Assessment , vol.2002 , Issue.196 , pp. 6-9
    • Yih, S.1    Fan, C.F.2
  • 40
    • 2442469697 scopus 로고    scopus 로고
    • Considerations for adopting risk informed techniques for electrical surveillance testing (Future revision of IEEE 338)
    • Detroit, MI, Oct. 6-9
    • G. E. Schinzel, T. J. Riccio, et al., “Considerations for adopting risk informed techniques for electrical surveillance testing (future revision of IEEE 338),” Int. Topical Meeting on Probabilistic Safety Assessment, Detroit, MI, Oct. 6-9, 2002, 618(2002).
    • (2002) Int. Topical Meeting on Probabilistic Safety Assessmen , pp. 618
    • Schinzel, G.E.1    Riccio, T.J.2
  • 42
    • 2442572718 scopus 로고    scopus 로고
    • The applicability of applying risk informed performance based approach to digital I&C regulation
    • Washington, D.C., Nov
    • S. Yih, D. S. Lee, et al., “The applicability of applying risk informed performance based approach to digital I&C regulation,” The Third American Nuclear Society Int. Topical Meeting on NPIC&HMIT, Washington, D.C., Nov. 13-17, 2000, (2000).
    • (2000) The Third American Nuclear Society Int. Topical Meeting on Npic&Hmit , vol.2000 , pp. 13-17
    • Yih, S.1    Lee, D.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.