-
1
-
-
0024944070
-
Single machine flowtime scheduling with a single breakdown
-
I. Adiri, J. Bruno, E. Frostig, and A. H. G. Rinnooy Kan, "Single machine flowtime scheduling with a single breakdown," Act. Informatica, vol. 26, no. 7, pp. 679-696, 1989.
-
(1989)
Act. Informatica
, vol.26
, Issue.7
, pp. 679-696
-
-
Adiri, I.1
Bruno, J.2
Frostig, E.3
Kan, A.H.G.R.4
-
2
-
-
84989688255
-
Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
-
I. Adiri, E. Frostig, and A. H. G. Rinnooy Kan, "Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs," Naval Res. Logistics, vol. 38, no 2 pp 261-271, 1991.
-
(1991)
Naval Res. Logistics
, vol.38
, Issue.2
, pp. 261-271
-
-
Adiri, I.1
Frostig, E.2
Kan, A.H.G.R.3
-
3
-
-
0025498911
-
Single-machine scheduling subject to stochastic breakdown
-
J. Birge, J. B. G. Frenk, J. Mittenthal, and A. H. G. Rinnooy Kan, "Single-machine scheduling subject to stochastic breakdown," Naval Res. Logistics, vol. 37, pp. 661-677, 1990.
-
(1990)
Naval Res. Logistics
, vol.37
, pp. 661-677
-
-
Birge, J.1
Frenk, J.B.G.2
Mittenthal, J.3
Kan, A.H.G.R.4
-
4
-
-
0031530447
-
Complexity of scheduling problems with multi-purpose machines
-
P. Brucker, B. Jurisch, and A. Kramer, "Complexity of scheduling problems with multi-purpose machines," Ann. Oper. Res., vol. 70, no. 6, pp. 57-73, 1997.
-
(1997)
Ann. Oper. Res.
, vol.70
, Issue.6
, pp. 57-73
-
-
Brucker, P.1
Jurisch, B.2
Kramer, A.3
-
5
-
-
4444344468
-
Deterministic and stochastic scheduling with teamwork tasks
-
X. Cai and X. Zhou, "Deterministic and stochastic scheduling with teamwork tasks," Naval Res. Logistics, vol. 51, no. 6, pp. 818-840, 2004.
-
(2004)
Naval Res. Logistics
, vol.51
, Issue.6
, pp. 818-840
-
-
Cai, X.1
Zhou, X.2
-
6
-
-
4444319965
-
Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria
-
X. Cai, X. Sun, and X. Zhou, "Stochastic scheduling subject to machine breakdowns: the preemptive-repeat model with discounted reward and other criteria," Naval Res. Logistics, vol. 51, no. 6, pp. 800-817, 2004.
-
(2004)
Naval Res. Logistics
, vol.51
, Issue.6
, pp. 800-817
-
-
Cai, X.1
Sun, X.2
Zhou, X.3
-
7
-
-
0032654777
-
Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost
-
X. Cai and X. Zhou, "Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost," Oper. Res., vol. 47, pp. 422-437, 1999.
-
(1999)
Oper. Res.
, vol.47
, pp. 422-437
-
-
Cai, X.1
Zhou, X.2
-
8
-
-
0034558594
-
Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine
-
_, "Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine," Ann. Oper. Res., vol. 98, pp. 313-331, 2000.
-
(2000)
Ann. Oper. Res.
, vol.98
, pp. 313-331
-
-
-
9
-
-
1642492010
-
Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime
-
X. Cai, X. Sun, and X. Zhou, "Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime," Probability Eng. Inf. Sci., vol. 17, no. 4, pp. 467-485, 2003.
-
(2003)
Probability Eng. Inf. Sci.
, vol.17
, Issue.4
, pp. 467-485
-
-
Cai, X.1
Sun, X.2
Zhou, X.3
-
10
-
-
84974201117
-
A note on stochastic scheduling on a single machine subject to breakdown-the preemptive-repeat model
-
E. Frostig, "A note on stochastic scheduling on a single machine subject to breakdown-the preemptive-repeat model," Probability Eng. Inf. Sci., vol. 5, pp. 349-354, 1991.
-
(1991)
Probability Eng. Inf. Sci.
, vol.5
, pp. 349-354
-
-
Frostig, E.1
-
12
-
-
0021444223
-
Scheduling stochastic jobs on a single machine subject to breakdowns
-
K. D. Glazebrook, "Scheduling stochastic jobs on a single machine subject to breakdowns," Naval Res. Logistics Quart., vol. 31, no. 2, pp. 251-264, 1984.
-
(1984)
Naval Res. Logistics Quart.
, vol.31
, Issue.2
, pp. 251-264
-
-
Glazebrook, K.D.1
-
13
-
-
0023367406
-
Evaluating the effects of machine breakdowns in scheduling stochastic problems
-
_, "Evaluating the effects of machine breakdowns in scheduling stochastic problems," Naval Res. Logistics, vol. 34, no. 3, pp. 319-335, 1987.
-
(1987)
Naval Res. Logistics
, vol.34
, Issue.3
, pp. 319-335
-
-
-
14
-
-
0002844482
-
On nonpreemptive policies for stochastic single-machine scheduling with breakdowns
-
_, "On nonpreemptive policies for stochastic single-machine scheduling with breakdowns," Probability Eng. Inf. Sci., vol. 5, pp. 77-87, 1991.
-
(1991)
Probability Eng. Inf. Sci.
, vol.5
, pp. 77-87
-
-
-
15
-
-
0242479214
-
A bidirectional search approach for restoring circuits in communication networks
-
T. Gyires and K. Muthuswamy, "A bidirectional search approach for restoring circuits in communication networks," J. Comp. Inf. Syst., vol. 37, no. 2, pp. 85-95, 1996.
-
(1996)
J. Comp. Inf. Syst.
, vol.37
, Issue.2
, pp. 85-95
-
-
Gyires, T.1
Muthuswamy, K.2
-
16
-
-
0022121187
-
An approximation algorithm for diagnostic test scheduling in multi-computer systems
-
Sep.
-
H. Krawczyk and M. Kubale, "An approximation algorithm for diagnostic test scheduling in multi-computer systems," IEEE Trans. Comput., vol. C-34, no. 9, pp. 869-872, Sep. 1985.
-
(1985)
IEEE Trans. Comput.
, vol.C-34
, Issue.9
, pp. 869-872
-
-
Krawczyk, H.1
Kubale, M.2
-
17
-
-
0032072364
-
Machine scheduling with multiple-job-on-one-processor pattern
-
C. L. Li, X. Cai, and C.-Y. Lee, "Machine scheduling with multiple-job-on-one-processor pattern," HE Trans. Sched. Logist., vol. 30, no. 5, pp. 433-446, 1998.
-
(1998)
HE Trans. Sched. Logist.
, vol.30
, Issue.5
, pp. 433-446
-
-
Li, C.L.1
Cai, X.2
Lee, C.-Y.3
-
18
-
-
0032302782
-
Stochastic scheduling on a repairable machine with Erlang uptime distribution
-
W. Li, W. J. Braun, and Y. Q. Zhao, "Stochastic scheduling on a repairable machine with Erlang uptime distribution," Adv. Appl. Probab., vol. 30, no. 4, pp. 1073-1088, 1998.
-
(1998)
Adv. Appl. Probab.
, vol.30
, Issue.4
, pp. 1073-1088
-
-
Li, W.1
Braun, W.J.2
Zhao, Y.Q.3
-
19
-
-
0032097829
-
Predictable scheduling of a job shop subject to breakdowns
-
Mar.
-
S. V. Mehta and R. M. Uzsoy, "Predictable scheduling of a job shop subject to breakdowns," IEEE Trans. Robot. Autom., vol. 14, no. 3, pp. 365-378, Mar. 1998.
-
(1998)
IEEE Trans. Robot. Autom.
, vol.14
, Issue.3
, pp. 365-378
-
-
Mehta, S.V.1
Uzsoy, R.M.2
-
20
-
-
0001002199
-
Stochastic single machine scheduling with quadratic early-tardy penalties
-
J. Mittenthal and M. Raghavachari, "Stochastic single machine scheduling with quadratic early-tardy penalties," Oper. Res., vol. 41, no. 4, pp. 786-796, 1993.
-
(1993)
Oper. Res.
, vol.41
, Issue.4
, pp. 786-796
-
-
Mittenthal, J.1
Raghavachari, M.2
-
21
-
-
0346438679
-
Optimal broadcasting in faulty trees
-
P. Panaite and A. Pelc, "Optimal broadcasting in faulty trees," J. Parallel Distrib. Comput., vol. 60, no. 5, pp. 566-584, 2000.
-
(2000)
J. Parallel Distrib. Comput.
, vol.60
, Issue.5
, pp. 566-584
-
-
Panaite, P.1
Pelc, A.2
-
22
-
-
0032025299
-
Optimal diagnosis of heterogeneous systems with random faults
-
Mar.
-
A. Pelc, "Optimal diagnosis of heterogeneous systems with random faults," IEEE Trans. Comput., vol. 47, no. 3, pp. 298-304, Mar. 1998.
-
(1998)
IEEE Trans. Comput.
, vol.47
, Issue.3
, pp. 298-304
-
-
Pelc, A.1
-
23
-
-
0002472057
-
A note on stochastic scheduling on a single machine subject to breakdown and repair
-
M. Pinedo and E. Rammouz, "A note on stochastic scheduling on a single machine subject to breakdown and repair," Probability Eng. Inf. Sci., vol. 2, pp. 41-49, 1988.
-
(1988)
Probability Eng. Inf. Sci.
, vol.2
, pp. 41-49
-
-
Pinedo, M.1
Rammouz, E.2
-
24
-
-
0003438602
-
-
Englewood Cliffs, NJ: Prentice-Hall
-
M. Pinedo, Scheduling: Theory, Algorithms, and Systems, 2nd ed. Englewood Cliffs, NJ: Prentice-Hall, 2002.
-
(2002)
Scheduling: Theory, Algorithms, and Systems, 2nd Ed.
-
-
Pinedo, M.1
-
25
-
-
0034341019
-
Scheduling problems with random processing times under expected earliness/tardiness costs
-
X. D. Qi, G. Yin, and J. R. Birge, "Scheduling problems with random processing times under expected earliness/tardiness costs," Stochastic Anal. Appl., vol. 18, no. 3, pp. 453-473, 2000a.
-
(2000)
Stochastic Anal. Appl.
, vol.18
, Issue.3
, pp. 453-473
-
-
Qi, X.D.1
Yin, G.2
Birge, J.R.3
-
26
-
-
0034342858
-
Single machine scheduling with random machine breakdowns and randomly compressible processing times
-
_, "Single machine scheduling with random machine breakdowns and randomly compressible processing times," Stochastic Anal. Appl., vol. 18, no. 4, pp. 635-653, 2000b.
-
(2000)
Stochastic Anal. Appl.
, vol.18
, Issue.4
, pp. 635-653
-
-
-
27
-
-
0037050386
-
Steel-making process scheduling using Lagrangian relaxation
-
L. X. Tang, P. B. Luh, J. Y. Liu, and L. Fang, "Steel-making process scheduling using Lagrangian relaxation," Int. J. Production Res., vol. 40, no. 1, pp. 55-70, 2002.
-
(2002)
Int. J. Production Res.
, vol.40
, Issue.1
, pp. 55-70
-
-
Tang, L.X.1
Luh, P.B.2
Liu, J.Y.3
Fang, L.4
-
29
-
-
0038588557
-
The value of processing flexibility in multipurpose machines
-
G. Vairaktarakis and X. Cai, "The value of processing flexibility in multipurpose machines," IIE Trans. Sched. Logist., vol. 35, no. 8, pp. 763-774, 2003.
-
(2003)
IIE Trans. Sched. Logist.
, vol.35
, Issue.8
, pp. 763-774
-
-
Vairaktarakis, G.1
Cai, X.2
|