메뉴 건너뛰기




Volumn 2, Issue 2, 2005, Pages 158-172

Dynamically optimal policies for stochastic scheduling subject to preemptive-repeat machine breakdowns

Author keywords

Discounted reward; Dynamic policy; Gittins index; Machine breakdowns; Min max criterion; Number of tardy jobs; Preemptive repeat; Semi Markov decision process; Stochastic scheduling; Weighted flow time

Indexed keywords

COMPUTATIONAL METHODS; DECISION THEORY; MACHINERY; MAINTENANCE; MARKOV PROCESSES; OPERATIONS RESEARCH; PROCESS CONTROL; RANDOM PROCESSES;

EID: 17644426366     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2005.844119     Document Type: Article
Times cited : (21)

References (30)
  • 1
    • 0024944070 scopus 로고
    • Single machine flowtime scheduling with a single breakdown
    • I. Adiri, J. Bruno, E. Frostig, and A. H. G. Rinnooy Kan, "Single machine flowtime scheduling with a single breakdown," Act. Informatica, vol. 26, no. 7, pp. 679-696, 1989.
    • (1989) Act. Informatica , vol.26 , Issue.7 , pp. 679-696
    • Adiri, I.1    Bruno, J.2    Frostig, E.3    Kan, A.H.G.R.4
  • 2
    • 84989688255 scopus 로고
    • Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
    • I. Adiri, E. Frostig, and A. H. G. Rinnooy Kan, "Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs," Naval Res. Logistics, vol. 38, no 2 pp 261-271, 1991.
    • (1991) Naval Res. Logistics , vol.38 , Issue.2 , pp. 261-271
    • Adiri, I.1    Frostig, E.2    Kan, A.H.G.R.3
  • 3
    • 0025498911 scopus 로고
    • Single-machine scheduling subject to stochastic breakdown
    • J. Birge, J. B. G. Frenk, J. Mittenthal, and A. H. G. Rinnooy Kan, "Single-machine scheduling subject to stochastic breakdown," Naval Res. Logistics, vol. 37, pp. 661-677, 1990.
    • (1990) Naval Res. Logistics , vol.37 , pp. 661-677
    • Birge, J.1    Frenk, J.B.G.2    Mittenthal, J.3    Kan, A.H.G.R.4
  • 4
    • 0031530447 scopus 로고    scopus 로고
    • Complexity of scheduling problems with multi-purpose machines
    • P. Brucker, B. Jurisch, and A. Kramer, "Complexity of scheduling problems with multi-purpose machines," Ann. Oper. Res., vol. 70, no. 6, pp. 57-73, 1997.
    • (1997) Ann. Oper. Res. , vol.70 , Issue.6 , pp. 57-73
    • Brucker, P.1    Jurisch, B.2    Kramer, A.3
  • 5
    • 4444344468 scopus 로고    scopus 로고
    • Deterministic and stochastic scheduling with teamwork tasks
    • X. Cai and X. Zhou, "Deterministic and stochastic scheduling with teamwork tasks," Naval Res. Logistics, vol. 51, no. 6, pp. 818-840, 2004.
    • (2004) Naval Res. Logistics , vol.51 , Issue.6 , pp. 818-840
    • Cai, X.1    Zhou, X.2
  • 6
    • 4444319965 scopus 로고    scopus 로고
    • Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria
    • X. Cai, X. Sun, and X. Zhou, "Stochastic scheduling subject to machine breakdowns: the preemptive-repeat model with discounted reward and other criteria," Naval Res. Logistics, vol. 51, no. 6, pp. 800-817, 2004.
    • (2004) Naval Res. Logistics , vol.51 , Issue.6 , pp. 800-817
    • Cai, X.1    Sun, X.2    Zhou, X.3
  • 7
    • 0032654777 scopus 로고    scopus 로고
    • Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost
    • X. Cai and X. Zhou, "Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost," Oper. Res., vol. 47, pp. 422-437, 1999.
    • (1999) Oper. Res. , vol.47 , pp. 422-437
    • Cai, X.1    Zhou, X.2
  • 8
    • 0034558594 scopus 로고    scopus 로고
    • Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine
    • _, "Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine," Ann. Oper. Res., vol. 98, pp. 313-331, 2000.
    • (2000) Ann. Oper. Res. , vol.98 , pp. 313-331
  • 9
    • 1642492010 scopus 로고    scopus 로고
    • Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime
    • X. Cai, X. Sun, and X. Zhou, "Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime," Probability Eng. Inf. Sci., vol. 17, no. 4, pp. 467-485, 2003.
    • (2003) Probability Eng. Inf. Sci. , vol.17 , Issue.4 , pp. 467-485
    • Cai, X.1    Sun, X.2    Zhou, X.3
  • 10
    • 84974201117 scopus 로고
    • A note on stochastic scheduling on a single machine subject to breakdown-the preemptive-repeat model
    • E. Frostig, "A note on stochastic scheduling on a single machine subject to breakdown-the preemptive-repeat model," Probability Eng. Inf. Sci., vol. 5, pp. 349-354, 1991.
    • (1991) Probability Eng. Inf. Sci. , vol.5 , pp. 349-354
    • Frostig, E.1
  • 12
    • 0021444223 scopus 로고
    • Scheduling stochastic jobs on a single machine subject to breakdowns
    • K. D. Glazebrook, "Scheduling stochastic jobs on a single machine subject to breakdowns," Naval Res. Logistics Quart., vol. 31, no. 2, pp. 251-264, 1984.
    • (1984) Naval Res. Logistics Quart. , vol.31 , Issue.2 , pp. 251-264
    • Glazebrook, K.D.1
  • 13
    • 0023367406 scopus 로고
    • Evaluating the effects of machine breakdowns in scheduling stochastic problems
    • _, "Evaluating the effects of machine breakdowns in scheduling stochastic problems," Naval Res. Logistics, vol. 34, no. 3, pp. 319-335, 1987.
    • (1987) Naval Res. Logistics , vol.34 , Issue.3 , pp. 319-335
  • 14
    • 0002844482 scopus 로고
    • On nonpreemptive policies for stochastic single-machine scheduling with breakdowns
    • _, "On nonpreemptive policies for stochastic single-machine scheduling with breakdowns," Probability Eng. Inf. Sci., vol. 5, pp. 77-87, 1991.
    • (1991) Probability Eng. Inf. Sci. , vol.5 , pp. 77-87
  • 15
    • 0242479214 scopus 로고    scopus 로고
    • A bidirectional search approach for restoring circuits in communication networks
    • T. Gyires and K. Muthuswamy, "A bidirectional search approach for restoring circuits in communication networks," J. Comp. Inf. Syst., vol. 37, no. 2, pp. 85-95, 1996.
    • (1996) J. Comp. Inf. Syst. , vol.37 , Issue.2 , pp. 85-95
    • Gyires, T.1    Muthuswamy, K.2
  • 16
    • 0022121187 scopus 로고
    • An approximation algorithm for diagnostic test scheduling in multi-computer systems
    • Sep.
    • H. Krawczyk and M. Kubale, "An approximation algorithm for diagnostic test scheduling in multi-computer systems," IEEE Trans. Comput., vol. C-34, no. 9, pp. 869-872, Sep. 1985.
    • (1985) IEEE Trans. Comput. , vol.C-34 , Issue.9 , pp. 869-872
    • Krawczyk, H.1    Kubale, M.2
  • 17
    • 0032072364 scopus 로고    scopus 로고
    • Machine scheduling with multiple-job-on-one-processor pattern
    • C. L. Li, X. Cai, and C.-Y. Lee, "Machine scheduling with multiple-job-on-one-processor pattern," HE Trans. Sched. Logist., vol. 30, no. 5, pp. 433-446, 1998.
    • (1998) HE Trans. Sched. Logist. , vol.30 , Issue.5 , pp. 433-446
    • Li, C.L.1    Cai, X.2    Lee, C.-Y.3
  • 18
    • 0032302782 scopus 로고    scopus 로고
    • Stochastic scheduling on a repairable machine with Erlang uptime distribution
    • W. Li, W. J. Braun, and Y. Q. Zhao, "Stochastic scheduling on a repairable machine with Erlang uptime distribution," Adv. Appl. Probab., vol. 30, no. 4, pp. 1073-1088, 1998.
    • (1998) Adv. Appl. Probab. , vol.30 , Issue.4 , pp. 1073-1088
    • Li, W.1    Braun, W.J.2    Zhao, Y.Q.3
  • 19
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • Mar.
    • S. V. Mehta and R. M. Uzsoy, "Predictable scheduling of a job shop subject to breakdowns," IEEE Trans. Robot. Autom., vol. 14, no. 3, pp. 365-378, Mar. 1998.
    • (1998) IEEE Trans. Robot. Autom. , vol.14 , Issue.3 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.M.2
  • 20
    • 0001002199 scopus 로고
    • Stochastic single machine scheduling with quadratic early-tardy penalties
    • J. Mittenthal and M. Raghavachari, "Stochastic single machine scheduling with quadratic early-tardy penalties," Oper. Res., vol. 41, no. 4, pp. 786-796, 1993.
    • (1993) Oper. Res. , vol.41 , Issue.4 , pp. 786-796
    • Mittenthal, J.1    Raghavachari, M.2
  • 21
    • 0346438679 scopus 로고    scopus 로고
    • Optimal broadcasting in faulty trees
    • P. Panaite and A. Pelc, "Optimal broadcasting in faulty trees," J. Parallel Distrib. Comput., vol. 60, no. 5, pp. 566-584, 2000.
    • (2000) J. Parallel Distrib. Comput. , vol.60 , Issue.5 , pp. 566-584
    • Panaite, P.1    Pelc, A.2
  • 22
    • 0032025299 scopus 로고    scopus 로고
    • Optimal diagnosis of heterogeneous systems with random faults
    • Mar.
    • A. Pelc, "Optimal diagnosis of heterogeneous systems with random faults," IEEE Trans. Comput., vol. 47, no. 3, pp. 298-304, Mar. 1998.
    • (1998) IEEE Trans. Comput. , vol.47 , Issue.3 , pp. 298-304
    • Pelc, A.1
  • 23
    • 0002472057 scopus 로고
    • A note on stochastic scheduling on a single machine subject to breakdown and repair
    • M. Pinedo and E. Rammouz, "A note on stochastic scheduling on a single machine subject to breakdown and repair," Probability Eng. Inf. Sci., vol. 2, pp. 41-49, 1988.
    • (1988) Probability Eng. Inf. Sci. , vol.2 , pp. 41-49
    • Pinedo, M.1    Rammouz, E.2
  • 25
    • 0034341019 scopus 로고    scopus 로고
    • Scheduling problems with random processing times under expected earliness/tardiness costs
    • X. D. Qi, G. Yin, and J. R. Birge, "Scheduling problems with random processing times under expected earliness/tardiness costs," Stochastic Anal. Appl., vol. 18, no. 3, pp. 453-473, 2000a.
    • (2000) Stochastic Anal. Appl. , vol.18 , Issue.3 , pp. 453-473
    • Qi, X.D.1    Yin, G.2    Birge, J.R.3
  • 26
    • 0034342858 scopus 로고    scopus 로고
    • Single machine scheduling with random machine breakdowns and randomly compressible processing times
    • _, "Single machine scheduling with random machine breakdowns and randomly compressible processing times," Stochastic Anal. Appl., vol. 18, no. 4, pp. 635-653, 2000b.
    • (2000) Stochastic Anal. Appl. , vol.18 , Issue.4 , pp. 635-653
  • 27
    • 0037050386 scopus 로고    scopus 로고
    • Steel-making process scheduling using Lagrangian relaxation
    • L. X. Tang, P. B. Luh, J. Y. Liu, and L. Fang, "Steel-making process scheduling using Lagrangian relaxation," Int. J. Production Res., vol. 40, no. 1, pp. 55-70, 2002.
    • (2002) Int. J. Production Res. , vol.40 , Issue.1 , pp. 55-70
    • Tang, L.X.1    Luh, P.B.2    Liu, J.Y.3    Fang, L.4
  • 29
    • 0038588557 scopus 로고    scopus 로고
    • The value of processing flexibility in multipurpose machines
    • G. Vairaktarakis and X. Cai, "The value of processing flexibility in multipurpose machines," IIE Trans. Sched. Logist., vol. 35, no. 8, pp. 763-774, 2003.
    • (2003) IIE Trans. Sched. Logist. , vol.35 , Issue.8 , pp. 763-774
    • Vairaktarakis, G.1    Cai, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.