-
1
-
-
0024944070
-
Single machine flowtime scheduling with a single breakdown
-
I. Adiri, J. Bruno, E. Frostig, and A.H.G. Rinnooy Kan, Single machine flowtime scheduling with a single breakdown, Acta Inform 26 (1989), 679-696.
-
(1989)
Acta Inform
, vol.26
, pp. 679-696
-
-
Adiri, I.1
Bruno, J.2
Frostig, E.3
Rinnooy Kan, A.H.G.4
-
2
-
-
84989688255
-
Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
-
I. Adiri, E. Frostig, and A.H.G. Rinnooy Kan, Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs, Naval Res Logist 38 (1991), 261-271.
-
(1991)
Naval Res Logist
, vol.38
, pp. 261-271
-
-
Adiri, I.1
Frostig, E.2
Rinnooy Kan, A.H.G.3
-
3
-
-
0342492897
-
Single machine scheduling problem with quadratic functions of completion times - A modified approach
-
P.C. Bagga and K.R. Kalra, Single machine scheduling problem with quadratic functions of completion times - a modified approach, J Inform Optim Sci 2 (1981), 103-108.
-
(1981)
J Inform Optim Sci
, vol.2
, pp. 103-108
-
-
Bagga, P.C.1
Kalra, K.R.2
-
4
-
-
0025498911
-
Single-machine scheduling subject to stochastic breakdown
-
J. Birge, J.B.G. Frenk, J. Mittenthal, and A.H.G. Rinnooy Kan, Single-machine scheduling subject to stochastic breakdown, Naval Res Logist 37 (1990), 661-677.
-
(1990)
Naval Res Logist
, vol.37
, pp. 661-677
-
-
Birge, J.1
Frenk, J.B.G.2
Mittenthal, J.3
Rinnooy Kan, A.H.G.4
-
5
-
-
0032654777
-
Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost
-
X. Cai and X. Zhou, Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost, Oper Res 47 (1999), 422-437.
-
(1999)
Oper Res
, vol.47
, pp. 422-437
-
-
Cai, X.1
Zhou, X.2
-
6
-
-
0034558594
-
Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine
-
X. Cai and X. Zhou, Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine, Ann Oper Res 98 (2000), 313-331.
-
(2000)
Ann Oper Res
, vol.98
, pp. 313-331
-
-
Cai, X.1
Zhou, X.2
-
7
-
-
1642492010
-
Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime
-
X. Cai, X. Sun, and X. Zhou, Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime, Probab Engrg Inf Sci, 17 (2003), 467-485.
-
(2003)
Probab Engrg Inf Sci
, vol.17
, pp. 467-485
-
-
Cai, X.1
Sun, X.2
Zhou, X.3
-
9
-
-
84974201117
-
A note on stochastic scheduling on a single machine subject to breakdown - The preemptive-repeat model
-
E. Frostig, A note on stochastic scheduling on a single machine subject to breakdown - the preemptive-repeat model, Probab Engrg Inform Sci 5 (1991), 349-354.
-
(1991)
Probab Engrg Inform Sci
, vol.5
, pp. 349-354
-
-
Frostig, E.1
-
10
-
-
0001002199
-
Stochastic single machine scheduling with quadratic early-tardy penalties
-
J. Mittenthal and M. Raghavachari, Stochastic single machine scheduling with quadratic early-tardy penalties, Oper Res 41 (1993), 786-796.
-
(1993)
Oper Res
, vol.41
, pp. 786-796
-
-
Mittenthal, J.1
Raghavachari, M.2
-
12
-
-
0002472057
-
A note on stochastic scheduling on a single machine subject to breakdown and repair
-
M. Pinedo and E. Rammouz, A note on stochastic scheduling on a single machine subject to breakdown and repair, Probab Engrg Inform Sci 2 (1988), 41-49.
-
(1988)
Probab Engrg Inform Sci
, vol.2
, pp. 41-49
-
-
Pinedo, M.1
Rammouz, E.2
-
13
-
-
0003438602
-
-
Prentice Hall, Englewood Cliffs, NJ
-
M. Pinedo, Scheduling: Theory, algorithms, and systems, 2nd edition, Prentice Hall, Englewood Cliffs, NJ, 2002.
-
(2002)
Scheduling: Theory, Algorithms, and Systems, 2nd Edition
-
-
Pinedo, M.1
-
14
-
-
0034342858
-
Single machine scheduling with random machine breakdowns and randomly compressible processing times
-
X.D. Qi, G. Yin, and J.R. Birge, Single machine scheduling with random machine breakdowns and randomly compressible processing times, Stochastic Anal Appl 18 (2000), 635-653.
-
(2000)
Stochastic Anal Appl
, vol.18
, pp. 635-653
-
-
Qi, X.D.1
Yin, G.2
Birge, J.R.3
-
15
-
-
0001491109
-
Scheduling independent tasks on parallel processors
-
M.H. Rothkopf, Scheduling independent tasks on parallel processors, Management Sci 12 (1966), 437-447.
-
(1966)
Management Sci
, vol.12
, pp. 437-447
-
-
Rothkopf, M.H.1
-
16
-
-
0005372684
-
Scheduling with random service times
-
M.H. Rothkopf, Scheduling with random service times, Management Sci 12 (1966), 707-713.
-
(1966)
Management Sci
, vol.12
, pp. 707-713
-
-
Rothkopf, M.H.1
-
17
-
-
0039162712
-
There are no undiscovered priority index sequencing rules for minimizing total delay costs
-
M.H. Rothkopf and S.A. Smith, There are no undiscovered priority index sequencing rules for minimizing total delay costs, Oper Res 32 (1984), 451-456.
-
(1984)
Oper Res
, vol.32
, pp. 451-456
-
-
Rothkopf, M.H.1
Smith, S.A.2
-
18
-
-
0017921371
-
The single-machine problem with quadratic penalty function of completion times: A branch-and-bound solution
-
W. Townsend, The single-machine problem with quadratic penalty function of completion times: A branch-and-bound solution, Management Sci 24 (1978), 530-534.
-
(1978)
Management Sci
, vol.24
, pp. 530-534
-
-
Townsend, W.1
-
19
-
-
0031214284
-
General stochastic single-machine scheduling with regular cost functions
-
X. Zhou and X. Cai, General stochastic single-machine scheduling with regular cost functions, Math Comput Modelling 26 (1997), 95-108.
-
(1997)
Math Comput Modelling
, vol.26
, pp. 95-108
-
-
Zhou, X.1
Cai, X.2
|