메뉴 건너뛰기




Volumn 51, Issue 6, 2004, Pages 800-817

Stochastic scheduling subject to machine breakdowns: The preemptive-repeat model with discounted reward and other criteria

Author keywords

Delayed delivery; Discounted reward; Machine breakdowns; Preemptive repeat; Stochastic scheduling; Weighted number of tardy jobs; Weighted squared flowtime

Indexed keywords

FAILURE (MECHANICAL); JOB ANALYSIS; MACHINE COMPONENTS; NUMERICAL ANALYSIS; PROBLEM SOLVING; RANDOM PROCESSES; SCHEDULING;

EID: 4444319965     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/nav.20024     Document Type: Article
Times cited : (19)

References (19)
  • 1
    • 0024944070 scopus 로고
    • Single machine flowtime scheduling with a single breakdown
    • I. Adiri, J. Bruno, E. Frostig, and A.H.G. Rinnooy Kan, Single machine flowtime scheduling with a single breakdown, Acta Inform 26 (1989), 679-696.
    • (1989) Acta Inform , vol.26 , pp. 679-696
    • Adiri, I.1    Bruno, J.2    Frostig, E.3    Rinnooy Kan, A.H.G.4
  • 2
    • 84989688255 scopus 로고
    • Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
    • I. Adiri, E. Frostig, and A.H.G. Rinnooy Kan, Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs, Naval Res Logist 38 (1991), 261-271.
    • (1991) Naval Res Logist , vol.38 , pp. 261-271
    • Adiri, I.1    Frostig, E.2    Rinnooy Kan, A.H.G.3
  • 3
    • 0342492897 scopus 로고
    • Single machine scheduling problem with quadratic functions of completion times - A modified approach
    • P.C. Bagga and K.R. Kalra, Single machine scheduling problem with quadratic functions of completion times - a modified approach, J Inform Optim Sci 2 (1981), 103-108.
    • (1981) J Inform Optim Sci , vol.2 , pp. 103-108
    • Bagga, P.C.1    Kalra, K.R.2
  • 5
    • 0032654777 scopus 로고    scopus 로고
    • Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost
    • X. Cai and X. Zhou, Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost, Oper Res 47 (1999), 422-437.
    • (1999) Oper Res , vol.47 , pp. 422-437
    • Cai, X.1    Zhou, X.2
  • 6
    • 0034558594 scopus 로고    scopus 로고
    • Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine
    • X. Cai and X. Zhou, Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine, Ann Oper Res 98 (2000), 313-331.
    • (2000) Ann Oper Res , vol.98 , pp. 313-331
    • Cai, X.1    Zhou, X.2
  • 7
    • 1642492010 scopus 로고    scopus 로고
    • Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime
    • X. Cai, X. Sun, and X. Zhou, Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flowtime, Probab Engrg Inf Sci, 17 (2003), 467-485.
    • (2003) Probab Engrg Inf Sci , vol.17 , pp. 467-485
    • Cai, X.1    Sun, X.2    Zhou, X.3
  • 9
    • 84974201117 scopus 로고
    • A note on stochastic scheduling on a single machine subject to breakdown - The preemptive-repeat model
    • E. Frostig, A note on stochastic scheduling on a single machine subject to breakdown - the preemptive-repeat model, Probab Engrg Inform Sci 5 (1991), 349-354.
    • (1991) Probab Engrg Inform Sci , vol.5 , pp. 349-354
    • Frostig, E.1
  • 10
    • 0001002199 scopus 로고
    • Stochastic single machine scheduling with quadratic early-tardy penalties
    • J. Mittenthal and M. Raghavachari, Stochastic single machine scheduling with quadratic early-tardy penalties, Oper Res 41 (1993), 786-796.
    • (1993) Oper Res , vol.41 , pp. 786-796
    • Mittenthal, J.1    Raghavachari, M.2
  • 12
    • 0002472057 scopus 로고
    • A note on stochastic scheduling on a single machine subject to breakdown and repair
    • M. Pinedo and E. Rammouz, A note on stochastic scheduling on a single machine subject to breakdown and repair, Probab Engrg Inform Sci 2 (1988), 41-49.
    • (1988) Probab Engrg Inform Sci , vol.2 , pp. 41-49
    • Pinedo, M.1    Rammouz, E.2
  • 14
    • 0034342858 scopus 로고    scopus 로고
    • Single machine scheduling with random machine breakdowns and randomly compressible processing times
    • X.D. Qi, G. Yin, and J.R. Birge, Single machine scheduling with random machine breakdowns and randomly compressible processing times, Stochastic Anal Appl 18 (2000), 635-653.
    • (2000) Stochastic Anal Appl , vol.18 , pp. 635-653
    • Qi, X.D.1    Yin, G.2    Birge, J.R.3
  • 15
    • 0001491109 scopus 로고
    • Scheduling independent tasks on parallel processors
    • M.H. Rothkopf, Scheduling independent tasks on parallel processors, Management Sci 12 (1966), 437-447.
    • (1966) Management Sci , vol.12 , pp. 437-447
    • Rothkopf, M.H.1
  • 16
    • 0005372684 scopus 로고
    • Scheduling with random service times
    • M.H. Rothkopf, Scheduling with random service times, Management Sci 12 (1966), 707-713.
    • (1966) Management Sci , vol.12 , pp. 707-713
    • Rothkopf, M.H.1
  • 17
    • 0039162712 scopus 로고
    • There are no undiscovered priority index sequencing rules for minimizing total delay costs
    • M.H. Rothkopf and S.A. Smith, There are no undiscovered priority index sequencing rules for minimizing total delay costs, Oper Res 32 (1984), 451-456.
    • (1984) Oper Res , vol.32 , pp. 451-456
    • Rothkopf, M.H.1    Smith, S.A.2
  • 18
    • 0017921371 scopus 로고
    • The single-machine problem with quadratic penalty function of completion times: A branch-and-bound solution
    • W. Townsend, The single-machine problem with quadratic penalty function of completion times: A branch-and-bound solution, Management Sci 24 (1978), 530-534.
    • (1978) Management Sci , vol.24 , pp. 530-534
    • Townsend, W.1
  • 19
    • 0031214284 scopus 로고    scopus 로고
    • General stochastic single-machine scheduling with regular cost functions
    • X. Zhou and X. Cai, General stochastic single-machine scheduling with regular cost functions, Math Comput Modelling 26 (1997), 95-108.
    • (1997) Math Comput Modelling , vol.26 , pp. 95-108
    • Zhou, X.1    Cai, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.