Volumn 35, Issue 10, 2003, Pages 973-985

Optimization-Based manufacturing scheduling with multiple resources, setup requirements, and transfer lots

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; DYNAMIC PROGRAMMING; INDUSTRIAL ENGINEERING; INVENTORY CONTROL; MATHEMATICAL MODELS; OPTIMIZATION; PRODUCT DEVELOPMENT; RESOURCE ALLOCATION; SCHEDULING;

EID: 0041417617     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170309342349     Document Type: Article
Times cited : (18)

References (20)
  • 1
    • 0001343733 scopus 로고    scopus 로고
    • A branch and bound method for the general-shop problem with sequence dependent setup-times
    • Brucker, P., and Thiele, O., 1996. A branch and bound method for the general-shop problem with sequence dependent setup-times. OR-Spectrum, 18 (3):145–161.
    • (1996) OR-Spectrum , vol.18 , Issue.3 , pp. 145-161
    • Brucker, P.1    Thiele, O.2
  • 3
    • 0028413489 scopus 로고
    • Scheduling products with bills of materials using an improved Lagrangian relaxation technique
    • Czerwinski, C., and Luh, P. B., 1994. Scheduling products with bills of materials using an improved Lagrangian relaxation technique. IEEE Transactions on Robotics and Automation, 10 (2):99–111.
    • (1994) IEEE Transactions on Robotics and Automation , vol.10 , Issue.2 , pp. 99-111
    • Czerwinski, C.1    Luh, P.B.2
  • 4
    • 0024701172 scopus 로고
    • Simultaneous resources scheduling to minimize weighted flow times
    • Dobson, G., and Karmarkar, U. S., 1989. Simultaneous resources scheduling to minimize weighted flow times. Operations Research, 37 (4):592–600.
    • (1989) Operations Research , vol.37 , Issue.4 , pp. 592-600
    • Dobson, G.1    Karmarkar, U.S.2
  • 6
    • 0030212185 scopus 로고    scopus 로고
    • Scheduling research in multiple resource constrained job shops: A review and critique
    • Gargeya, V. B., and Deane, R. H., 1996. Scheduling research in multiple resource constrained job shops:a review and critique. International Journal of Production Research, 34 (8):2077–2097.
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2077-2097
    • Gargeya, V.B.1    Deane, R.H.2
  • 7
    • 0032256280 scopus 로고    scopus 로고
    • Efficient Lagrangian relaxation algorithms for real-life-size job-shop scheduling problems
    • Kaskavelis, C. A., and Caramanis, M. C., 1998. Efficient Lagrangian relaxation algorithms for real-life-size job-shop scheduling problems. IIE Transactions, 30 (11):1085–1097.
    • (1998) IIE Transactions , vol.30 , Issue.11 , pp. 1085-1097
    • Kaskavelis, C.A.1    Caramanis, M.C.2
  • 8
    • 0028462998 scopus 로고
    • Impact of sequence-dependent setup time on job shop scheduling performance
    • Kim, S. C., and Bobrowski, P. M., 1994. Impact of sequence-dependent setup time on job shop scheduling performance. International Journal of Production Research, 32 (7):1503–1520.
    • (1994) International Journal of Production Research , vol.32 , Issue.7 , pp. 1503-1520
    • Kim, S.C.1    Bobrowski, P.M.2
  • 9
    • 0030270860 scopus 로고    scopus 로고
    • Sequencing with setup time and order tardiness trade-offs
    • Liao, C., and Chuang, C., 1996. Sequencing with setup time and order tardiness trade-offs. Naval Research Logistics, 43 (7):971–984.
    • (1996) Naval Research Logistics , vol.43 , Issue.7 , pp. 971-984
    • Liao, C.1    Chuang, C.2
  • 10
    • 0029706757 scopus 로고    scopus 로고
    • Proceedings of the 1996 IEEE International Conference on Robotics and Automation, Piscataway, NJ: IEEE
    • Liu, G., and Luh, P. B., Scheduling job shops with transfer lots. Proceedings of the 1996 IEEE International Conference on Robotics and Automation. pp. 2523–2528. Piscataway, NJ:IEEE.
    • Scheduling job shops with transfer lots , pp. 2523-2528
    • Liu, G.1    Luh, P.B.2
  • 11
    • 0033102403 scopus 로고    scopus 로고
    • Scheduling of design projects with uncertain number of iterations
    • Luh, P. B., Liu, F., and Moser, B., 1999. Scheduling of design projects with uncertain number of iterations. European Journal of Operational Research, 113:575–592.
    • (1999) European Journal of Operational Research , vol.113 , pp. 575-592
    • Luh, P.B.1    Liu, F.2    Moser, B.3
  • 13
    • 0028452709 scopus 로고
    • Rolling horizon algorithm for a single-machine dynamic scheduling problem with sequence-dependent setup times
    • Ovacik, I. M., and Uzsoy, R., 1994. Rolling horizon algorithm for a single-machine dynamic scheduling problem with sequence-dependent setup times. International Journal of Production Research, 32 (6):1243–1263.
    • (1994) International Journal of Production Research , vol.32 , Issue.6 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 15
    • 0027664037 scopus 로고
    • Production scheduling in a flexible manufacturing system with setups
    • Soumen, G., and Cheryl, G., 1993. Production scheduling in a flexible manufacturing system with setups. IIE Transactions, 25 (5):21–35.
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 21-35
    • Soumen, G.1    Cheryl, G.2
  • 16
    • 0002352858 scopus 로고
    • An investigation of labor assignment rules in a dual-constrained job shop
    • Treleven, M. D., and Elvers, D. A., 1985. An investigation of labor assignment rules in a dual-constrained job shop. Journal of Operations Management, 6:51–68.
    • (1985) Journal of Operations Management , vol.6 , pp. 51-68
    • Treleven, M.D.1    Elvers, D.A.2
  • 17
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • Trietsch, D., and Baker, K. R., 1993. Basic techniques for lot streaming. Operations Research, 41 (6):1065–1076.
    • (1993) Operations Research , vol.41 , Issue.6 , pp. 1065-1076
    • Trietsch, D.1    Baker, K.R.2
  • 18
    • 0026896286 scopus 로고
    • Two- and three-machine flow shop scheduling problems with equal sized transfer batches
    • Vickson, R. G., and Alfredsson, B. E., 1992. Two- and three-machine flow shop scheduling problems with equal sized transfer batches. International Journal of Production Research, 30 (7):1551–1574.
    • (1992) International Journal of Production Research , vol.30 , Issue.7 , pp. 1551-1574
    • Vickson, R.G.1    Alfredsson, B.E.2
  • 19
    • 0030735290 scopus 로고    scopus 로고
    • A heuristic to minimize the total weighted tardiness with sequence-dependent setups
    • Young, H. L., Bhaskaran, K., and Pinedo, M., 1997. A heuristic to minimize the total weighted tardiness with sequence-dependent setups. IIE Transactions, 29 (1):45–52.
    • (1997) IIE Transactions , vol.29 , Issue.1 , pp. 45-52
    • Young, H.L.1    Bhaskaran, K.2    Pinedo, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.