메뉴 건너뛰기




Volumn 9, Issue 1, 2003, Pages 49-64

Model and heuristics for lot streaming of one job in M-1 hybrid flowshops

Author keywords

Heuristics; Hybrid Flowshop; Integer Programming; Lot Streaming

Indexed keywords


EID: 13444289377     PISSN: 10821910     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (19)

References (29)
  • 1
    • 21844508729 scopus 로고
    • Lot streaming in the two-machine flow shop with setup times
    • Baker, K. R., "Lot streaming in the two-machine flow shop with setup times", Annals of Operations Research, 57, 1995, 1-11.
    • (1995) Annals of Operations Research , vol.57 , pp. 1-11
    • Baker, K.R.1
  • 2
    • 84985818856 scopus 로고
    • Solution procedures for the lot-streaming problem
    • Baker, K. R and D. F. Pyke, "Solution procedures for the lot-streaming problem", Decision Sciences, 21, 1990, 475-491.
    • (1990) Decision Sciences , vol.21 , pp. 475-491
    • Baker, K.R.1    Pyke, D.F.2
  • 3
    • 0028698198 scopus 로고
    • Lot streaming in a two-stage flow shop with set-up, processing and removal times separated
    • Cetinkaya, F. C., "Lot streaming in a two-stage flow shop with set-up, processing and removal times separated", Journal of Operational Research Society, 45, 1994, 1445-1455.
    • (1994) Journal of Operational Research Society , vol.45 , pp. 1445-1455
    • Cetinkaya, F.C.1
  • 4
    • 0031076263 scopus 로고    scopus 로고
    • Lot streaming with detached setups in three-machine flow shops
    • Chen, J. and G. Steiner, "Lot streaming with detached setups in three-machine flow shops", European Journal of Operational Research, 96, 1996, 591-611.
    • (1996) European Journal of Operational Research , vol.96 , pp. 591-611
    • Chen, J.1    Steiner, G.2
  • 5
    • 0032262156 scopus 로고    scopus 로고
    • Lot streaming with attached setups in three-machine flow shops
    • Chen, J. and G. Steiner, "Lot streaming with attached setups in three-machine flow shops", IIE Transactions, 30, 1998, 1075-1084.
    • (1998) IIE Transactions , vol.30 , pp. 1075-1084
    • Chen, J.1    Steiner, G.2
  • 9
    • 0032131709 scopus 로고    scopus 로고
    • Structural properties of lot streaming in a flow shop
    • Glass, C. A. and C. N. Potts, "Structural properties of lot streaming in a flow shop", Mathematics of Operations Research, 23, 1998, 624-639.
    • (1998) Mathematics of Operations Research , vol.23 , pp. 624-639
    • Glass, C.A.1    Potts, C.N.2
  • 10
  • 11
    • 0031543097 scopus 로고    scopus 로고
    • Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    • Gupta, J. N. D., A. M. A. Hariri, and C. N. Potts, "Scheduling a two-stage hybrid flow shop with parallel machines at the first stage", Annals of Operations Research, 69, 1997, 171-191.
    • (1997) Annals of Operations Research , vol.69 , pp. 171-191
    • Gupta, J.N.D.1    Hariri, A.M.A.2    Potts, C.N.3
  • 12
    • 84985801774 scopus 로고
    • Repetitive lots flow-time reductions through sequencing and dynamic batch sizing
    • Jacobs, F. R. and D. J. Bragg, "Repetitive lots flow-time reductions through sequencing and dynamic batch sizing", Decision Sciences, 19, 1988, 281-294.
    • (1988) Decision Sciences , vol.19 , pp. 281-294
    • Jacobs, F.R.1    Bragg, D.J.2
  • 14
    • 84871362114 scopus 로고    scopus 로고
    • Single-job lot streaming in m-1 two-stage hybrid flowshops
    • Liu, J., "Single-job lot streaming in m-1 two-stage hybrid flowshops", Revision submitted to IIE Transactions, 2002.
    • (2002) Revision submitted to IIE Transactions
    • Liu, J.1
  • 15
    • 0024925432 scopus 로고
    • Flow shop scheduling with lot streaming
    • Potts, C. N. and K. R. Baker, "Flow shop scheduling with lot streaming", Operations Research Letters, 8, 1989, 297-303.
    • (1989) Operations Research Letters , vol.8 , pp. 297-303
    • Potts, C.N.1    Baker, K.R.2
  • 16
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • Potts, C. N. and L. N. Van Wassenhove, "Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity", Journal of Operational Research Society, 43, 1992, 395-406.
    • (1992) Journal of Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Wassenhove, L.N.V.2
  • 17
    • 0026819776 scopus 로고
    • A multi-stage parallel-processor flowshop problem with minimum flowtime
    • Rajendran, C. and D. Chaudhuri, "A multi-stage parallel-processor flowshop problem with minimum flowtime", European Journal Operation Research, 57, 1992, 111-122.
    • (1992) European Journal Operation Research , vol.57 , pp. 111-122
    • Rajendran, C.1    Chaudhuri, D.2
  • 18
    • 0000659781 scopus 로고
    • A system for managing job shop production
    • Reiter, S., "A system for managing job shop production", Journal of Business, 34, 1966, 371-393.
    • (1966) Journal of Business , vol.34 , pp. 371-393
    • Reiter, S.1
  • 22
    • 0033363409 scopus 로고    scopus 로고
    • Lot streaming and scheduling multiple products in two-machine no-wait flowshops
    • Sriskandarajah, C. and E. Wagneur, "Lot streaming and scheduling multiple products in two-machine no-wait flowshops", IIE Transactions, 31, 1999, 695- 707.
    • (1999) IIE Transactions , vol.31
    • Sriskandarajah, C.1    Wagneur, E.2
  • 23
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • Trietsch, D. and K. R. Baker, "Basic techniques for lot streaming", Operations Research, 41, 1993, 1065-76.
    • (1993) Operations Research , vol.41 , pp. 1065-1076
    • Trietsch, D.1    Baker, K.R.2
  • 24
    • 0022028816 scopus 로고
    • Scheduling production activities in multi-stage batch manufacturing systems
    • Truscott, W. G., "Scheduling production activities in multi-stage batch manufacturing systems", International Journal of Production Research, 23, 1985, 315-328.
    • (1985) International Journal of Production Research , vol.23 , pp. 315-328
    • Truscott, W.G.1
  • 25
    • 0030291549 scopus 로고    scopus 로고
    • The impact of lot sizing and sequencing in manufacturing performance in a two-stage hybrid flow shop
    • Tsubone, H., H. Ohba, and T. Uetake, "The impact of lot sizing and sequencing in manufacturing performance in a two-stage hybrid flow shop", International Journal of Production Research, 34, 1996, 3037-3053.
    • (1996) International Journal of Production Research , vol.34 , pp. 3037-3053
    • Tsubone, H.1    Ohba, H.2    Uetake, T.3
  • 26
    • 0029378595 scopus 로고
    • Optimal lot streaming for multiple products in a two-machine flow shop
    • Vickson, R., "Optimal lot streaming for multiple products in a two-machine flow shop", European Journal of Operational Research, 85, 1995, 556-575.
    • (1995) European Journal of Operational Research , vol.85 , pp. 556-575
    • Vickson, R.1
  • 27
    • 0026896286 scopus 로고
    • Two and three machines flow shop scheduling problems with equal sized transfer batches
    • Vickson, R. and B. Alfredsson, "Two and three machines flow shop scheduling problems with equal sized transfer batches", International Journal of Production Research, 30, 1992, 1551-1574.
    • (1992) International Journal of Production Research , vol.30 , pp. 1551-1574
    • Vickson, R.1    Alfredsson, B.2
  • 29
    • 84871368150 scopus 로고    scopus 로고
    • PhD Thesis, Department of Industrial Engineering and Engineering Management, The Hong Kong University of Science and Technology
    • Zhang, W., "Lot streaming in two-stage hybrid flowshop", PhD Thesis, Department of Industrial Engineering and Engineering Management, The Hong Kong University of Science and Technology, 1999.
    • (1999) Lot streaming in two-stage hybrid flowshop
    • Zhang, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.