메뉴 건너뛰기




Volumn 150, Issue 1, 2005, Pages 77-86

A possibilistic approach to sequencing problems with fuzzy parameters

Author keywords

Fuzzy number; Possibility distribution; Scheduling; Single machine

Indexed keywords

FUZZY NUMBER; FUZZY PARAMETERS; POSSIBILITY DISTRIBUTION; SINGLE MACHINE;

EID: 11144252704     PISSN: 01650114     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.fss.2004.09.007     Document Type: Article
Times cited : (22)

References (17)
  • 3
    • 0035369592 scopus 로고    scopus 로고
    • Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
    • S. Chanas, and A. Kasperski Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates Eng. Appl. Artif. Intell. 14 2001 377 386
    • (2001) Eng. Appl. Artif. Intell. , vol.14 , pp. 377-386
    • Chanas, S.1    Kasperski, A.2
  • 4
    • 1242310012 scopus 로고    scopus 로고
    • Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters
    • S. Chanas, and A. Kasperski Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters Fuzzy Sets and Systems 142 2004 359 371
    • (2004) Fuzzy Sets and Systems , vol.142 , pp. 359-371
    • Chanas, S.1    Kasperski, A.2
  • 5
    • 0000474126 scopus 로고
    • Minimizing total tardiness on one machine is NP-hard
    • J. Du, and J.Y.-T. Leung Minimizing total tardiness on one machine is NP-hard Math. Oper. Res. 15 1990 483 495
    • (1990) Math. Oper. Res. , vol.15 , pp. 483-495
    • Du, J.1    Leung, J.Y.-T.2
  • 7
    • 0020340499 scopus 로고
    • The use of fuzzy numbers in decision analysis
    • North-Holland Publishing Company
    • D. Dubois, H. Prade, The use of fuzzy numbers in decision analysis, Fuzzy Information and Decision Processes, North-Holland Publishing Company, 1982, pp. 309-321.
    • (1982) Fuzzy Information and Decision Processes , pp. 309-321
    • Dubois, D.1    Prade, H.2
  • 9
    • 0028546121 scopus 로고
    • One machine scheduling problem with fuzzy duedates
    • S. Han, H. Ishii, and S. Fujii One machine scheduling problem with fuzzy duedates European J. Oper. Res. 79 1994 1 12
    • (1994) European J. Oper. Res. , vol.79 , pp. 1-12
    • Han, S.1    Ishii, H.2    Fujii, S.3
  • 10
  • 11
    • 0141637075 scopus 로고    scopus 로고
    • Fuzzy due-date scheduling problem with fuzzy processing time
    • T. Itoh, and H. Ishii Fuzzy due-date scheduling problem with fuzzy processing time Internat. Trans. Oper. Res. 6 1999 639 647
    • (1999) Internat. Trans. Oper. Res. , vol.6 , pp. 639-647
    • Itoh, T.1    Ishii, H.2
  • 12
    • 0001253255 scopus 로고
    • Optimal sequencing of a single machine subject to precedence constraints
    • E.L. Lawler Optimal sequencing of a single machine subject to precedence constraints Management Sci. 19 1973 544 546
    • (1973) Management Sci. , vol.19 , pp. 544-546
    • Lawler, E.L.1
  • 14
    • 0000062028 scopus 로고
    • An n job, one machine sequencing algorithm for minimzing the number of late jobs
    • J.M. Moore An n job, one machine sequencing algorithm for minimzing the number of late jobs Management Sci. 15 1968 102 109
    • (1968) Management Sci. , vol.15 , pp. 102-109
    • Moore, J.M.1
  • 15
    • 0141457949 scopus 로고    scopus 로고
    • Single machine scheduling to minimize the number of late jobs under uncertainty
    • S.C. Sung, and M. Vlach Single machine scheduling to minimize the number of late jobs under uncertainty Fuzzy Sets and Systems 139 2003 421 430
    • (2003) Fuzzy Sets and Systems , vol.139 , pp. 421-430
    • Sung, S.C.1    Vlach, M.2
  • 16
    • 0001116547 scopus 로고    scopus 로고
    • Single machine scheduling with fuzzy due dates
    • Prague
    • K. Tanaka, M. Vlach, Single machine scheduling with fuzzy due dates, Proc. Seventh IFSA World Congress, Prague, 1997, pp. 195-199.
    • (1997) Proc. Seventh IFSA World Congress , pp. 195-199
    • Tanaka, K.1    Vlach, M.2
  • 17
    • 0037117664 scopus 로고    scopus 로고
    • The single machine ready time scheduling problem with fuzzy processing times
    • C. Wang, D. Wang, W.H. Ip, and D.W. Yuen The single machine ready time scheduling problem with fuzzy processing times Fuzzy Sets and Systems 127 2002 117 129
    • (2002) Fuzzy Sets and Systems , vol.127 , pp. 117-129
    • Wang, C.1    Wang, D.2    Ip, W.H.3    Yuen, D.W.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.