On the sure criticality of tasks in activity networks with imprecise durations
-
Chanas S., Dubois D., Zielinski P. On the sure criticality of tasks in activity networks with imprecise durations. IEEE Trans. Systems Man Cybernet. 32:2002;393-407.
-
(2002)
IEEE Trans. Systems Man Cybernet.
, vol.32
, pp. 393-407
-
-
Chanas, S.1
Dubois, D.2
Zielinski, P.3
-
3
-
-
0035369592
-
Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
-
Chanas S., Kasperski A. Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates. Eng. Appl. Artif. Intell. 14:2001;377-386.
-
(2001)
Eng. Appl. Artif. Intell.
, vol.14
, pp. 377-386
-
-
Chanas, S.1
Kasperski, A.2
-
4
-
-
0035885517
-
Critical path analysis in the network with fuzzy activity times
-
Chanas S., Zielinski P. Critical path analysis in the network with fuzzy activity times. Fuzzy Sets and Systems. 122:2001;195-204.
-
(2001)
Fuzzy Sets and Systems
, vol.122
, pp. 195-204
-
-
Chanas, S.1
Zielinski, P.2
-
5
-
-
0029355717
-
Fuzzy constraints in job-shop scheduling
-
Dubois D., Fargier H., Prade H. Fuzzy constraints in job-shop scheduling. Intell. Manuf. 6:1995;215-234.
-
(1995)
Intell. Manuf.
, vol.6
, pp. 215-234
-
-
Dubois, D.1
Fargier, H.2
Prade, H.3
-
7
-
-
0031268178
-
Job-shop scheduling with imprecise durations: A fuzzy approach
-
Fortemps P. Job-shop scheduling with imprecise durations. a fuzzy approach IEEE Trans. Fuzzy Systems. 5(4):1997;557-569.
-
(1997)
IEEE Trans. Fuzzy Systems
, vol.5
, Issue.4
, pp. 557-569
-
-
Fortemps, P.1
-
8
-
-
0028546121
-
One machine scheduling problem with fuzzy duedates
-
Han S., Ishii H., Fujii S. One machine scheduling problem with fuzzy duedates. European J. Oper. Res. 79:1994;1-12.
-
(1994)
European J. Oper. Res.
, vol.79
, pp. 1-12
-
-
Han, S.1
Ishii, H.2
Fujii, S.3
-
9
-
-
0030286425
-
Fuzzy priority heuristics for project scheduling
-
Hapke M., Slowinski R. Fuzzy priority heuristics for project scheduling. Fuzzy Sets and Systems. 83:1996;291-299.
-
(1996)
Fuzzy Sets and Systems
, vol.83
, pp. 291-299
-
-
Hapke, M.1
Slowinski, R.2
-
11
-
-
0029638856
-
Single machine scheduling problem with fuzzy precedence relation
-
Ishii H., Tada M. Single machine scheduling problem with fuzzy precedence relation. European J. Oper. Res. 87:1995;284-288.
-
(1995)
European J. Oper. Res.
, vol.87
, pp. 284-288
-
-
Ishii, H.1
Tada, M.2
-
13
-
-
0033102247
-
Optimal fuzzy counterparts of scheduling rules
-
Özelkan E.C., Duckstein L. Optimal fuzzy counterparts of scheduling rules. European J. Oper. Res. 113:1999;593-609.
-
(1999)
European J. Oper. Res.
, vol.113
, pp. 593-609
-
-
Özelkan, E.C.1
Duckstein, L.2
-
16
-
-
49349133217
-
Fuzzy sets as a basis for theory of possibility
-
Zadeh L.A. Fuzzy sets as a basis for theory of possibility. Fuzzy Sets and Systems. 1:1978;3-29.
-
(1978)
Fuzzy Sets and Systems
, vol.1
, pp. 3-29
-
-
Zadeh, L.A.1
|