-
1
-
-
0028424706
-
Restraint analysis of fixtures that rely on surface contact
-
DeMeter, E.C. (1994) 'Restraint analysis of fixtures that rely on surface contact', J. of Engineering for Industry, Vol. 116, pp. 207-215.
-
(1994)
J. of Engineering for Industry
, vol.116
, pp. 207-215
-
-
DeMeter, E.C.1
-
2
-
-
0028551914
-
Automated verification of clamping stability in computer-aided fixture design
-
Rong, Y., Wu, S.-H. and Chu, T.P. (1994) 'Automated verification of clamping stability in computer-aided fixture design,' Computers in Engineering, No. 1, pp. 421-426.
-
(1994)
Computers in Engineering
, vol.1
, pp. 421-426
-
-
Rong, Y.1
Wu, S.-H.2
Chu, T.P.3
-
3
-
-
0029219696
-
Automated fixture design
-
Willy, A., Sadler, J.P. and Schraft, R.D. (1995) 'Automated fixture design', Int. J. of Advanced Manufacturing Technology, No. 10, pp. 27-35.
-
(1995)
Int. J. of Advanced Manufacturing Technology
, vol.10
, pp. 27-35
-
-
Willy, A.1
Sadler, J.P.2
Schraft, R.D.3
-
4
-
-
0031995184
-
Automated modular fixture planning: Accuracy, clamping, and accessibility analysis
-
Wu, Y., Rong, Y., Ma, W. and LeClair, S.R. (1998) 'Automated modular fixture planning: accuracy, clamping, and accessibility analysis', Robotics and Computer-Integrated Manufacturing, Vol. 14, No. 1, pp. 17-26.
-
(1998)
Robotics and Computer-Integrated Manufacturing
, vol.14
, Issue.1
, pp. 17-26
-
-
Wu, Y.1
Rong, Y.2
Ma, W.3
LeClair, S.R.4
-
5
-
-
0342918690
-
An automated design and assembly of interference-free modular fixture setup
-
Kumar, A.S., Fuh, J.Y.H. and Kow, T.S. (2000) 'An automated design and assembly of interference-free modular fixture setup', Computer-Aided Design, Vol. 32, pp. 583-596.
-
(2000)
Computer-Aided Design
, vol.32
, pp. 583-596
-
-
Kumar, A.S.1
Fuh, J.Y.H.2
Kow, T.S.3
-
6
-
-
0034250307
-
Towards the design and development of a knowledge-based universal modular jigs and fixtures system
-
Kakish, J., Zhang, P.-L. and Zeid, I. (2000) 'Towards the design and development of a knowledge-based universal modular jigs and fixtures system', J. of Intelligent Manufacturing, Vol. 11, pp. 381-401.
-
(2000)
J. of Intelligent Manufacturing
, vol.11
, pp. 381-401
-
-
Kakish, J.1
Zhang, P.-L.2
Zeid, I.3
-
7
-
-
0342273035
-
Characteristics of job shop operations in fixture design
-
Hargrove, S.K. (1994) Characteristics of job shop operations in fixture design, Industrial Engineering.
-
(1994)
Industrial Engineering
-
-
Hargrove, S.K.1
-
8
-
-
26144473136
-
Computer-aided design of workpiece holding fixture including machining accuracy optimization
-
Doctoral dissertation, Toyohashi University of Technology, Japan
-
Huang, Y. (1999) 'Computer-aided Design of Workpiece Holding Fixture Including Machining Accuracy Optimization', Doctoral dissertation, Toyohashi University of Technology, Japan.
-
(1999)
-
-
Huang, Y.1
-
9
-
-
0028542750
-
The min-max load criteria as a measure of machining fixture performance
-
DeMeter, E.C. (1994) 'The Min-max load criteria as a measure of machining fixture performance', Transactions of the ASME, J. of Engineering for Industry, Vol. 116, pp. 500-507.
-
(1994)
Transactions of the ASME, J. of Engineering for Industry
, vol.116
, pp. 500-507
-
-
DeMeter, E.C.1
-
10
-
-
0002099580
-
Prediction of the reaction force system for machining fixtures based on machining process simulation
-
Melkote, S.N., Athavale, S.M., DeVor, R.E., Kapoor, S.G. and Burkey, J.J. (1995) 'Prediction of the reaction force system for machining fixtures based on machining process simulation', Transactions of the NAMRI of SME, Vol. 23, pp. 207-214.
-
(1995)
Transactions of the NAMRI of SME
, vol.23
, pp. 207-214
-
-
Melkote, S.N.1
Athavale, S.M.2
DeVor, R.E.3
Kapoor, S.G.4
Burkey, J.J.5
-
11
-
-
0029423215
-
Computer fixture analysis using finite element analysis and mathematical optimization modelling
-
Trappey, A.J.C., Su, C. and Hou, J. (1995) 'Computer fixture analysis using finite element analysis and mathematical optimization modelling', ASME, Manufacturing Science and Engineering, Vol. MED-2-1/MH-3-1, pp. 777-787.
-
(1995)
ASME, Manufacturing Science and Engineering
, vol.MED21-MH31
, pp. 777-787
-
-
Trappey, A.J.C.1
Su, C.2
Hou, J.3
-
12
-
-
0030101031
-
Development of automatic fixturing design system
-
Ikezoe, K., Aoyama, T. and Watanabe, K. (1996) 'Development of automatic fixturing design system', Transactions of the Japan Society of Mechanical Engineering, Vol. C62(595), pp. 1231-1238.
-
(1996)
Transactions of the Japan Society of Mechanical Engineering
, vol.C62
, Issue.595
, pp. 1231-1238
-
-
Ikezoe, K.1
Aoyama, T.2
Watanabe, K.3
-
13
-
-
0030164996
-
Optimization of fixturing condition by means of the genetic algorithm
-
Ishikawa, E. and Aoyama, T. (1996) 'Optimization of fixturing condition by means of the genetic algorithm', Transactions of the Japan Society of Mechanical Engineering, Vol. C62(598), pp. 2409-2416.
-
(1996)
Transactions of the Japan Society of Mechanical Engineering
, vol.C62
, Issue.598
, pp. 2409-2416
-
-
Ishikawa, E.1
Aoyama, T.2
-
14
-
-
0036487050
-
Interative fixture layout and clamping force optimization using the genetic algorithm
-
Kulankara, K., Satyanarayana, S. and Melkote, S.N. 2002 'Interative fixture layout and clamping force optimization using the genetic algorithm', Transactions of the ASME, J. of Manufacturing Science and Engineering, Vol. 124, No. 1, pp. 119-125.
-
(2002)
Transactions of the ASME, J. of Manufacturing Science and Engineering
, vol.124
, Issue.1
, pp. 119-125
-
-
Kulankara, K.1
Satyanarayana, S.2
Melkote, S.N.3
-
15
-
-
0035207319
-
Computer-aided fixture design - A review and future trends
-
Cecil, J. (2001) 'Computer-aided fixture design - a review and future trends', Int. J. of Advanced Manufacturing Technology, Vol. 18, No. 11, pp. 790-793.
-
(2001)
Int. J. of Advanced Manufacturing Technology
, vol.18
, Issue.11
, pp. 790-793
-
-
Cecil, J.1
-
16
-
-
0035922487
-
Graph-based set-up planning and tolerance decomposition for computer-aided fixture design
-
Zhang, Y., Hu, W., Rong, Y. and Yen, D.W. (2001) 'Graph-based set-up planning and tolerance decomposition for computer-aided fixture design', Int. J. of Production Res., Vol. 39. No. 14, pp. 3109-3126.
-
(2001)
Int. J. of Production Res.
, vol.39
, Issue.14
, pp. 3109-3126
-
-
Zhang, Y.1
Hu, W.2
Rong, Y.3
Yen, D.W.4
-
17
-
-
0030648022
-
The use of machining feature in set-up planning and fixture design to interface CAD to CAPP
-
Öztürk, F. (1997) 'The use of machining feature in set-up planning and fixture design to interface CAD to CAPP', Int. J. of Vehicle Design, Vol. 18, No. 5, pp. 558-573.
-
(1997)
Int. J. of Vehicle Design
, vol.18
, Issue.5
, pp. 558-573
-
-
Öztürk, F.1
-
18
-
-
0030708465
-
An integrated setup planning and fixture design system for prismatic parts
-
Lin, L., Zhang, Y.F. and Nee, A.Y.C. (1997) 'An integrated setup planning and fixture design system for prismatic parts', Int. J. of Computer Applications in Technology, Vol. 10, No. 3/4, pp. 198-212.
-
(1997)
Int. J. of Computer Applications in Technology
, vol.10
, Issue.3-4
, pp. 198-212
-
-
Lin, L.1
Zhang, Y.F.2
Nee, A.Y.C.3
-
19
-
-
0031994379
-
Automated modular fixture planning: Geometric analysis
-
Wu, Y., Rong, Y., Ma, W. and LeClair, S.R. 'Automated modular fixture planning: geometric analysis', Robotics and Computer-Integrated Manufacturing, Vol. 14, No. 1, pp. 1-15.
-
Robotics and Computer-Integrated Manufacturing
, vol.14
, Issue.1
, pp. 1-15
-
-
Wu, Y.1
Rong, Y.2
Ma, W.3
LeClair, S.R.4
-
20
-
-
0032685952
-
Geometric reasoning for re-allocation of supporting and clamping positions in the automated fixture design system
-
Roy, U. and Liao, J. (1999) 'Geometric reasoning for re-allocation of supporting and clamping positions in the automated fixture design system', IIE Transactions, Vol. 31, No. 4, pp. 313-322.
-
(1999)
IIE Transactions
, vol.31
, Issue.4
, pp. 313-322
-
-
Roy, U.1
Liao, J.2
-
21
-
-
0032661613
-
Development of automated fixture planning systems
-
Ma, W., Li, J. and Rong, Y. (1999) 'Development of automated fixture planning systems, Int. J. of Advanced Manufacturing Technology, Vol. 15, pp. 171-181.
-
(1999)
Int. J. of Advanced Manufacturing Technology
, vol.15
, pp. 171-181
-
-
Ma, W.1
Li, J.2
Rong, Y.3
-
22
-
-
0035213792
-
A clamping design approach for automated fixture design
-
Cecil, J. (2001) 'A clamping design approach for automated fixture design, Int. J. of Advanced Manufacturing Technology, Vol. 18, No. 11, pp. 784-789.
-
(2001)
Int. J. of Advanced Manufacturing Technology
, vol.18
, Issue.11
, pp. 784-789
-
-
Cecil, J.1
-
23
-
-
0032658533
-
Fixturing surface accessibility analysis for automated fixture design
-
Li, J., Ma, W. and Rong, Y. (1999) 'Fixturing surface accessibility analysis for automated fixture design', Int. J. of Production Research, Vol. 37, No. 13, pp. 2997-3016.
-
(1999)
Int. J. of Production Research
, vol.37
, Issue.13
, pp. 2997-3016
-
-
Li, J.1
Ma, W.2
Rong, Y.3
-
24
-
-
0036487119
-
Fixturing analysis for stability consideration in an automated fixture design system
-
Roy, U. and Liao, J. (2002) 'Fixturing analysis for stability consideration in an automated fixture design system', Transactions of the ASME, J. of Manufacturing Science and Engineering, Vol. 124, No. 1, pp. 98-104.
-
(2002)
Transactions of the ASME, J. of Manufacturing Science and Engineering
, vol.124
, Issue.1
, pp. 98-104
-
-
Roy, U.1
Liao, J.2
-
25
-
-
0032188214
-
Feature-based fixturing analysis for machining parts represented with multiple sets of features
-
Tseng, Y.-J. (1998) 'Feature-based fixturing analysis for machining parts represented with multiple sets of features', Int. J. of Production Research, Vol. 36, No. 10, pp. 2743-2770.
-
(1998)
Int. J. of Production Research
, vol.36
, Issue.10
, pp. 2743-2770
-
-
Tseng, Y.-J.1
-
26
-
-
0036603620
-
Fixturing features selection in feature-based systems
-
Subrahmanyam, S.R. (2002) 'Fixturing features selection in feature-based systems', Computers in Industry, Vol. 48, pp. 99-108.
-
(2002)
Computers in Industry
, vol.48
, pp. 99-108
-
-
Subrahmanyam, S.R.1
-
27
-
-
0030688829
-
Automated planning and design of fixture for complex parts
-
Chou, Y.-C. 'Automated planning and design of fixture for complex parts', Int. J. of Computer Applications in Technology, Vol. 10, No. 3/4, pp. 183-197.
-
Int. J. of Computer Applications in Technology
, vol.10
, Issue.3-4
, pp. 183-197
-
-
Chou, Y.-C.1
-
28
-
-
0030693556
-
Automated generation of dedicated fixture design
-
Wu, Y., Rong, Y. and Chu, T.C. (1997) 'Automated generation of dedicated fixture design', Int. J. of Computer Applications in Technology, Vol. 10, No. 3/4, pp. 213-235.
-
(1997)
Int. J. of Computer Applications in Technology
, vol.10
, Issue.3-4
, pp. 213-235
-
-
Wu, Y.1
Rong, Y.2
Chu, T.C.3
-
29
-
-
0033293923
-
Development of automated dedicated fixture configuration design systems with predefined fixture component types: Basic design
-
An, Z., Huang, S., Rong, Y. and Jayaram, S. (1999) 'Development of automated dedicated fixture configuration design systems with predefined fixture component types: basic design', Int. J. of Flexible Automation and Integrated Manufacturing, Vol. 7, No. 3/4, pp. 321-341.
-
(1999)
Int. J. of Flexible Automation and Integrated Manufacturing
, vol.7
, Issue.3-4
, pp. 321-341
-
-
An, Z.1
Huang, S.2
Rong, Y.3
Jayaram, S.4
-
30
-
-
0035840761
-
Flexible fixture design and automation: Review, issues and future directions
-
Bi, Z.M. and Zhang, W.J. (2001) 'Flexible fixture design and automation: review, issues and future directions', Int. J. of Production Research, Vol. 39, No. 13, pp. 2867-2894.
-
(2001)
Int. J. of Production Research
, vol.39
, Issue.13
, pp. 2867-2894
-
-
Bi, Z.M.1
Zhang, W.J.2
-
31
-
-
0031685933
-
FIX-DES: A computer-aided modular fixture configuration design system
-
Ma, W., Lei, Z. and Rong, Y. (1998) 'FIX-DES: a computer-aided modular fixture configuration design system', Int. J. of Advanced Manufacturing Technology, Vol. 14, pp. 21-32.
-
(1998)
Int. J. of Advanced Manufacturing Technology
, vol.14
, pp. 21-32
-
-
Ma, W.1
Lei, Z.2
Rong, Y.3
-
32
-
-
0031139805
-
Automated generation of fixture configuration design
-
Rong, Y. and Bai, Y. (1997) 'Automated generation of fixture configuration design', Transactions of the ASME, J. of Manufacturing Science and Engineering, Vol. 119, No. 2, pp. 208-219.
-
(1997)
Transactions of the ASME, J. of Manufacturing Science and Engineering
, vol.119
, Issue.2
, pp. 208-219
-
-
Rong, Y.1
Bai, Y.2
-
33
-
-
0009351530
-
Modular fixture element modelling and assembly relationship analysis for automated fixture configuration design
-
Bai, Y. and Rong, Y. (1998) 'Modular fixture element modelling and assembly relationship analysis for automated fixture configuration design', Engineering Design and Automation, Vol. 4, No. 2, pp. 147-162.
-
(1998)
Engineering Design and Automation
, vol.4
, Issue.2
, pp. 147-162
-
-
Bai, Y.1
Rong, Y.2
-
34
-
-
0030711474
-
A methodology for applying V-blocks and clamps to non-prismatic workpart fixtures
-
Hou, J.L. and Trappey, A.J.C. (1997) 'A methodology for applying V-blocks and clamps to non-prismatic workpart fixtures', Int. J. of Computer Applications in Technology, Vol. 10, No. 3/4, pp. 152-169.
-
(1997)
Int. J. of Computer Applications in Technology
, vol.10
, Issue.3-4
, pp. 152-169
-
-
Hou, J.L.1
Trappey, A.J.C.2
-
35
-
-
0035841886
-
Computer-aided fixture design system for comprehensive modular fixtures
-
Hou, J.-L. and Trappey, A.J.C. (2001) 'Computer-aided fixture design system for comprehensive modular fixtures', Int. J. of Production Research, Vol. 39, No. 16, pp. 3703-3725.
-
(2001)
Int. J. of Production Research
, vol.39
, Issue.16
, pp. 3703-3725
-
-
Hou, J.-L.1
Trappey, A.J.C.2
-
36
-
-
0032688236
-
Conceptual design of fixtures using genetic algorithms
-
Kumar, A.S., Subramaniam, V. and Seow, K.C. (1999) 'Conceptual design of fixtures using genetic algorithms', Int. J. of Advanced Manufacturing Technology, Vol. 15, No. 2, pp. 79-84.
-
(1999)
Int. J. of Advanced Manufacturing Technology
, vol.15
, Issue.2
, pp. 79-84
-
-
Kumar, A.S.1
Subramaniam, V.2
Seow, K.C.3
-
37
-
-
0033886930
-
Conceptual design of fixtures using machine learning techniques
-
Kumar, A.S., Subramaniam, V. and Teck, T.B. (2000) 'Conceptual design of fixtures using machine learning techniques', Int. J. of Advanced Manufacturing Technology, Vol. 16, pp. 176-181.
-
(2000)
Int. J. of Advanced Manufacturing Technology
, vol.16
, pp. 176-181
-
-
Kumar, A.S.1
Subramaniam, V.2
Teck, T.B.3
-
38
-
-
0033727493
-
An integrated approach to collision-free computer-aided modular fixture design
-
Kow, T.S., Kumar, A.S. and Fuh, J.Y.H. (2000) 'An integrated approach to collision-free computer-aided modular fixture design', Int. J. of Advanced Manufacturing Technology, Vol. 16, pp. 233-242.
-
(2000)
Int. J. of Advanced Manufacturing Technology
, vol.16
, pp. 233-242
-
-
Kow, T.S.1
Kumar, A.S.2
Fuh, J.Y.H.3
-
39
-
-
0030702282
-
Fixture design synthesis for a flexible manufacturing system
-
Roy, U., Liao, J., Sun, P.-L. and Fields, M.C. (1997) 'Fixture design synthesis for a flexible manufacturing system', Integrated Computer-Aided Engineering, Vol. 4, No. 2, pp. 101-113.
-
(1997)
Integrated Computer-Aided Engineering
, vol.4
, Issue.2
, pp. 101-113
-
-
Roy, U.1
Liao, J.2
Sun, P.-L.3
Fields, M.C.4
-
40
-
-
0032293127
-
Automated design of 3-D fixtures and assembly pallets
-
Brost, R.C. and Peters, R.R. (1998) 'Automated design of 3-D fixtures and assembly pallets', The Int. J. of Robotics Research, Vol. 17, No. 12, pp. 1243-1281.
-
(1998)
The Int. J. of Robotics Research
, vol.17
, Issue.12
, pp. 1243-1281
-
-
Brost, R.C.1
Peters, R.R.2
-
42
-
-
0035889176
-
Locating error analysis and tolerance assignment for computer-aided fixture design
-
Rong, Y., Hu, W., Kang, Y., Zhang, Y. and Yen, D.W. (2001) 'Locating error analysis and tolerance assignment for computer-aided fixture design', Int. J. of Production Res., Vol. 39, No. 15, pp. 3529-3545.
-
(2001)
Int. J. of Production Res.
, vol.39
, Issue.15
, pp. 3529-3545
-
-
Rong, Y.1
Hu, W.2
Kang, Y.3
Zhang, Y.4
Yen, D.W.5
-
43
-
-
0033701057
-
A fast interference checking algorithm for automated fixture design verification
-
Hu, W. and Rong, Y. (2000) 'A fast interference checking algorithm for automated fixture design verification', Int. J. of Advanced Manufacturing Technology, Vol. 16. No. 8, pp. 571-581.
-
(2000)
Int. J. of Advanced Manufacturing Technology
, vol.16
, Issue.8
, pp. 571-581
-
-
Hu, W.1
Rong, Y.2
-
44
-
-
0033906035
-
Machining fixture layout optimization using the genetic algorithm
-
Krishnakumar, K. and Melkote, S.N. (2000) 'Machining fixture layout optimization using the genetic algorithm', Int. J. of Machine Tools and Manufacture, Vol. 40, pp. 579-598.
-
(2000)
Int. J. of Machine Tools and Manufacture
, vol.40
, pp. 579-598
-
-
Krishnakumar, K.1
Melkote, S.N.2
-
45
-
-
0036027430
-
An investigation of the effectiveness of fixture layout optimization methods
-
Vallapuzha, S., De Meter, E.C., Choudhuri, S. and Khetan, R.P. (200) 'An investigation of the effectiveness of fixture layout optimization methods', Int. J. of Machine Tools and Manufacture, Vol. 42, pp. 251-263.
-
(2002)
Int. J. of Machine Tools and Manufacture
, vol.42
, pp. 251-263
-
-
Vallapuzha, S.1
De Meter, E.C.2
Choudhuri, S.3
Khetan, R.P.4
-
46
-
-
0036027402
-
An investigation into the use of spatial coordinates for the genetic algorithm based solution of the fixture layout optimization problem
-
Vallapuzha, S., De Meter, E.C., Choudhuri, S. and Khetan, R.P. (2002) 'An investigation into the use of spatial coordinates for the genetic algorithm based solution of the fixture layout optimization problem', Int. J. of Machine Tools and Manufacture, Vol. 42, pp. 265-275.
-
(2002)
Int. J. of Machine Tools and Manufacture
, vol.42
, pp. 265-275
-
-
Vallapuzha, S.1
De Meter, E.C.2
Choudhuri, S.3
Khetan, R.P.4
-
47
-
-
0011740028
-
Optimal fixture design for drilling through deformable plate orkpieces - Part I: Model formulation
-
Wardak, K.R., Tasch, U. and Charalambides, P.G. (2001) 'Optimal fixture design for drilling through deformable plate orkpieces - Part I: model formulation', J. of Manufacturing Systems, Vol. 20, No. 1, pp. 23-32.
-
(2001)
J. of Manufacturing Systems
, vol.20
, Issue.1
, pp. 23-32
-
-
Wardak, K.R.1
Tasch, U.2
Charalambides, P.G.3
-
48
-
-
0011740028
-
Optimal fixture design for drilling through deformable plate orkpieces - Part I: Results
-
Wardak, K.R., Tasch, U. and Charalambides, P.G. (2001) 'Optimal fixture design for drilling through deformable plate orkpieces - Part I: results', J. of Manufacturing Systems, Vol. 20, No 1, pp. 33-43.
-
(2001)
J. of Manufacturing Systems
, vol.20
, Issue.1
, pp. 33-43
-
-
Wardak, K.R.1
Tasch, U.2
Charalambides, P.G.3
-
49
-
-
0030413150
-
An index system for modular fixture design: Applied to case-based reasoning
-
Sun, S.H. and Chen, J.L. (1996) 'An index system for modular fixture design: applied to case-based reasoning', Int. J. of Production Res., Vol. 34, No. 12, pp. 3487-3497.
-
(1996)
Int. J. of Production Res.
, vol.34
, Issue.12
, pp. 3487-3497
-
-
Sun, S.H.1
Chen, J.L.2
-
50
-
-
0032093412
-
Application of a blackboard framework to a cooperative fixture design system
-
Roy, U. and Liao, J. (1990) 'Application of a blackboard framework to a cooperative fixture design system', Computers in Industry, Vol. 37, pp. 67-81.
-
(1990)
Computers in Industry
, vol.37
, pp. 67-81
-
-
Roy, U.1
Liao, J.2
-
51
-
-
0035272814
-
A multi-agent approach to fixture design
-
Subramaniam, V., Kumar, A.S. and Seow, K.C. (2001) 'A multi-agent approach to fixture design', J. of Intelligent Manufacturing, Vol. 12, No. 1, pp. 31-42.
-
(2001)
J. of Intelligent Manufacturing
, vol.12
, Issue.1
, pp. 31-42
-
-
Subramaniam, V.1
Kumar, A.S.2
Seow, K.C.3
-
52
-
-
0030682880
-
A force-controlled clamping element for intelligent fixturing
-
Mannan, M.A. and Sollie, J.P. (1997) 'A force-controlled clamping element for intelligent fixturing', Annals of the CIRP, Vol. 46, No. 1, pp. 265-268.
-
(1997)
Annals of the CIRP
, vol.46
, Issue.1
, pp. 265-268
-
-
Mannan, M.A.1
Sollie, J.P.2
-
54
-
-
0346464612
-
Finite element method based on optimization of fixture constraint layout due to moving cutting heat in dry finishing machining
-
November
-
Huang, Y. and Hoshi, T. (1998) 'Finite element method based on optimization of fixture constraint layout due to moving cutting heat in dry finishing machining', Proceedings of the International Symposium on Manufacturing Strategy, pp. 130-135, November
-
(1998)
Proceedings of the International Symposium on Manufacturing Strategy
, pp. 130-135
-
-
Huang, Y.1
Hoshi, T.2
|