메뉴 건너뛰기




Volumn 41, Issue 16, 2003, Pages 3831-3848

Algorithm for agile assembling-to-order in the automotive industry

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; AUTOMOBILE PLANTS; AUTOMOBILES; AUTOMOTIVE INDUSTRY; SCHEDULING;

EID: 0242364700     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540310001595792     Document Type: Article
Times cited : (28)

References (30)
  • 1
    • 0034211911 scopus 로고    scopus 로고
    • Some structural properties for the just-in-time level schedule problem
    • AIGBEDO, H., 2000, Some structural properties for the just-in-time level schedule problem. Production Planning and Control, 11, 357-362.
    • (2000) Production Planning and Control , vol.11 , pp. 357-362
    • Aigbedo, H.1
  • 2
    • 0242344251 scopus 로고    scopus 로고
    • New American manufacturers: Delivery by the book
    • AUTOMOTIVE NEWS, April, 8N-N
    • AUTOMOTIVE NEWS, 2001, New American manufacturers: delivery by the book. Automotive News, 9 April, 8N-N.
    • (2001) Automotive News , vol.9
  • 3
    • 0034297657 scopus 로고    scopus 로고
    • Multi-agent systems in production planning and control: An application to the scheduling of mixed-model assembly lines
    • CARIDI, M. and SIANESI, A., 2000, Multi-agent systems in production planning and control: an application to the scheduling of mixed-model assembly lines. International Journal of Production Economics, 68, 29-42.
    • (2000) International Journal of Production Economics , vol.68 , pp. 29-42
    • Caridi, M.1    Sianesi, A.2
  • 5
    • 0031366070 scopus 로고    scopus 로고
    • A real-time sequence control system for the level production of the automotive assembly line
    • CHOI, W. and SHIN, H., 1997, A real-time sequence control system for the level production of the automotive assembly line. Computers and Industrial Engineering, 33, 769-772.
    • (1997) Computers and Industrial Engineering , vol.33 , pp. 769-772
    • Choi, W.1    Shin, H.2
  • 8
    • 0032120699 scopus 로고    scopus 로고
    • A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines
    • HYUN, C. J., KIM, Y. and KIM, Y. K., 1998, A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. Computers and Industrial Engineering, 25, 675-690.
    • (1998) Computers and Industrial Engineering , vol.25 , pp. 675-690
    • Hyun, C.J.1    Kim, Y.2    Kim, Y.K.3
  • 9
    • 0000285320 scopus 로고    scopus 로고
    • Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems
    • INMAN, R. R., 1999, Empirical evaluation of exponential and independence assumptions in queueing models of manufacturing systems. Production and Operations Management, 8, 409-432.
    • (1999) Production and Operations Management , vol.8 , pp. 409-432
    • Inman, R.R.1
  • 10
    • 0001602291 scopus 로고
    • Sequencing JIT mixed-model assembly lines
    • INMAN, R. R. and BULFIN, R. L., 1991, Sequencing JIT mixed-model assembly lines. Management Science, 37, 901-904.
    • (1991) Management Science , vol.37 , pp. 901-904
    • Inman, R.R.1    Bulfin, R.L.2
  • 12
    • 0000945761 scopus 로고    scopus 로고
    • A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines
    • KIM, Y. K., KIM J. Y. and KIM, Y., 2000, A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines. Applied Intelligence, 13, 247-258.
    • (2000) Applied Intelligence , vol.13 , pp. 247-258
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 13
    • 0035341955 scopus 로고    scopus 로고
    • Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
    • KORKMAZEL, T. and MERAL, S., 2001, Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems. European Journal of Operational Research, 131, 188-207.
    • (2001) European Journal of Operational Research , vol.131 , pp. 188-207
    • Korkmazel, T.1    Meral, S.2
  • 15
    • 0033881796 scopus 로고    scopus 로고
    • Algorithms for mixed-model sequencing with due date restrictions
    • LOVGREN, R. H. and RACER, M. J., 2000, Algorithms for mixed-model sequencing with due date restrictions. European Journal of Operational Research, 120, 408-422.
    • (2000) European Journal of Operational Research , vol.120 , pp. 408-422
    • Lovgren, R.H.1    Racer, M.J.2
  • 16
    • 0001169951 scopus 로고    scopus 로고
    • A simulated anealing approach to mixed-model sequencing with multiple objectives on a just-in-time line
    • McMULLEN, P. R. and FRAZIER, G., 2000, A simulated anealing approach to mixed-model sequencing with multiple objectives on a just-in-time line. IIE Transactions, 32, 679-686.
    • (2000) IIE Transactions , vol.32 , pp. 679-686
    • McMullen, P.R.1    Frazier, G.2
  • 18
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • MILTENBURG, J., 1989, Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science, 35, 192-207.
    • (1989) Management Science , vol.35 , pp. 192-207
    • Miltenburg, J.1
  • 20
    • 0003449926 scopus 로고
    • Norcross: Institute of Industrial Engineers
    • MONDEN, Y., 1983, Toyota Production System (Norcross: Institute of Industrial Engineers).
    • (1983) Toyota Production System
    • Monden, Y.1
  • 22
    • 0242312729 scopus 로고    scopus 로고
    • Build-to-order drives BMW's future growth
    • December
    • OUDE-WEERNINK, W., 2002, Build-to-order drives BMW's future growth. Automotive News Europe, 2 December.
    • (2002) Automotive News Europe , vol.2
    • Oude-Weernink, W.1
  • 24
    • 0040045195 scopus 로고
    • In-line sequencing: How it's done at Wixom
    • November
    • SAWYER, C. A., 1994, In-line sequencing: how it's done at Wixom. Automotive Industries, November, 41.
    • (1994) Automotive Industries , pp. 41
    • Sawyer, C.A.1
  • 25
    • 0030818944 scopus 로고    scopus 로고
    • Algorithms for sequencing mixed models on an assembly line in a JIT production system
    • XIAOBO, Z. and OHNO, K., 1997, Algorithms for sequencing mixed models on an assembly line in a JIT production system. Computers and Industrial Engineering, 32, 47-56.
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 47-56
    • Xiaobo, Z.1    Ohno, K.2
  • 26
    • 0032688594 scopus 로고    scopus 로고
    • A note on Toyota's goal of sequencing mixed models on an assembly line
    • XIAOBO, Z., ZHOU, Z. and ASRES, A., 1999, A note on Toyota's goal of sequencing mixed models on an assembly line. Computers and Industrial Engineering, 36, 57-65.
    • (1999) Computers and Industrial Engineering , vol.36 , pp. 57-65
    • Xiaobo, Z.1    Zhou, Z.2    Asres, A.3
  • 28
    • 0034135513 scopus 로고    scopus 로고
    • Mixed-model assembly line scheduling using the Lagrangian relaxation technique
    • ZHANG, Y. H., LUH, P. B., YONEDA, K., KANO, T. and KYOYA, Y., 2000, Mixed-model assembly line scheduling using the Lagrangian relaxation technique. IIE Transactions, 32, 125-134.
    • (2000) IIE Transactions , vol.32 , pp. 125-134
    • Zhang, Y.H.1    Luh, P.B.2    Yoneda, K.3    Kano, T.4    Kyoya, Y.5
  • 29
    • 0033728251 scopus 로고    scopus 로고
    • Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
    • ZHAO, X. B. and OHNO, K., 2000, Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages. European Journal of Operational Research, 124, 560-570.
    • (2000) European Journal of Operational Research , vol.124 , pp. 560-570
    • Zhao, X.B.1    Ohno, K.2
  • 30
    • 0242281041 scopus 로고    scopus 로고
    • A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
    • ZHU, J. and DING, F. Y., 2000, A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines. European Journal of Operational Research, 127, 203-216.
    • (2000) European Journal of Operational Research , vol.127 , pp. 203-216
    • Zhu, J.1    Ding, F.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.