메뉴 건너뛰기




Volumn 38, Issue 15, 2000, Pages 3451-3470

Bicriteria sequencing for just-in-time mixed-model assembly lines

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; AUTOMOTIVE INDUSTRY; BENCHMARKING; HEURISTIC METHODS; INVENTORY CONTROL; WORK SIMPLIFICATION;

EID: 0034668377     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/002075400422743     Document Type: Article
Times cited : (26)

References (23)
  • 1
    • 0031238178 scopus 로고    scopus 로고
    • A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines
    • Aigbedo, H. and Monden, Y., 1997, A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines. International Journal of Production Research, 35, 2543-2564.
    • (1997) International Journal of Production Research , vol.35 , pp. 2543-2564
    • Aigbedo, H.1    Monden, Y.2
  • 3
    • 0000363908 scopus 로고
    • Sequencing mixed model assembly lines to level parts usage and minimize line length
    • Bard, J., Shtub, A., and Joshi, S.B., 1994, Sequencing mixed model assembly lines to level parts usage and minimize line length. International Journal of Production Research, 32, 2431-2454.
    • (1994) International Journal of Production Research , vol.32 , pp. 2431-2454
    • Bard, J.1    Shtub, A.2    Joshi, S.B.3
  • 4
    • 0026933958 scopus 로고
    • Scheduling algorithms to minimize utility work at a single station on a paced assembly line
    • Bolat, A. and Yano, C.A., 1992a, Scheduling algorithms to minimize utility work at a single station on a paced assembly line. Production Planning and Control, 3, 393-405.
    • (1992) Production Planning and Control , vol.3 , pp. 393-405
    • Bolat, A.1    Yano, C.A.2
  • 5
    • 0026936861 scopus 로고
    • A surrogate objective for utility work in paced assembly lines
    • Bolat, A. and Yano, C.A., 1992b, A surrogate objective for utility work in paced assembly lines. Production Planning and Control, 3, 406-412.
    • (1992) Production Planning and Control , vol.3 , pp. 406-412
    • Bolat, A.1    Yano, C.A.2
  • 7
    • 0003683852 scopus 로고    scopus 로고
    • Data Analysis Products Division, MathSoft Inc., Seattle, Washington, USA
    • MathSoft Inc., 1998, S-plus 4 guide to statistics (Data Analysis Products Division, MathSoft Inc., Seattle, Washington, USA).
    • (1998) S-plus 4 guide to statistics
  • 8
    • 0032143247 scopus 로고    scopus 로고
    • Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis
    • Duplaga, E.A. and Bragg, D.J., 1998, Mixed-model assembly line sequencing heuristics for smoothing component parts usage: a comparative analysis. International Journal of Production Research, 36, 2209-2224.
    • (1998) International Journal of Production Research , vol.36 , pp. 2209-2224
    • Duplaga, E.A.1    Bragg, D.J.2
  • 9
    • 0011766422 scopus 로고
    • Production instruction expert system for bumper coating line
    • Nagoya, Japan (Nagoya: Japan Society of Mechanical Engineers), (in Japanese)
    • Fujii, M. and Oguchi, K., 1993, Production instruction expert system for bumper coating line. Proceedings of the Production Scheduling Symposium '93, Nagoya, Japan (Nagoya: Japan Society of Mechanical Engineers), pp. 65-68 (in Japanese).
    • (1993) Proceedings of the Production Scheduling Symposium '93 , pp. 65-68
    • Fujii, M.1    Oguchi, K.2
  • 10
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in JIT systems: A survey
    • Kubiak, W., 1993, Minimizing variation of production rates in JIT systems: A survey. European Journal of Operations Research, 66, 259-271.
    • (1993) European Journal of Operations Research , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 11
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • Miltenburg, G.J., 1989, Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science, 35, 192-207.
    • (1989) Management Science , vol.35 , pp. 192-207
    • Miltenburg, G.J.1
  • 12
    • 84989692636 scopus 로고
    • Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
    • Miltenburg, G.J. and Goldstein, T., 1991, Developing production schedules which balance part usage and smooth production loads for just-in-time production systems. Naval Research Logistics, 38, 893-910.
    • (1991) Naval Research Logistics , vol.38 , pp. 893-910
    • Miltenburg, G.J.1    Goldstein, T.2
  • 16
    • 0011791030 scopus 로고
    • Development of painted body storage control expert-system
    • Nagoya: Japanese Mechanical Engineers Society (in Japanese)
    • Ochiai, T. and Shishikura, K., 1991, Development of painted body storage control expert-system. Proceedings of the 1991 Robotics Mechatronics Symposium, Vol. A (Nagoya: Japanese Mechanical Engineers Society), pp. 333-336 (in Japanese).
    • (1991) Proceedings of the 1991 Robotics Mechatronics Symposium , vol.A , pp. 333-336
    • Ochiai, T.1    Shishikura, K.2
  • 17
    • 0027083884 scopus 로고
    • Development of expert-system for production sequence control
    • San Francisco: American Society of Mechanical Engineers
    • Ochiai, T. and Kurosu, N., 1992, Development of expert-system for production sequence control. Proceedings of the 1992 Japan USA Symposium on Flexible Automation (San Francisco: American Society of Mechanical Engineers).
    • (1992) Proceedings of the 1992 Japan USA Symposium on Flexible Automation
    • Ochiai, T.1    Kurosu, N.2
  • 18
    • 0018469357 scopus 로고
    • A heuristic algorithm for the assembly tine model-mix sequencing problem to minimize the risk of stopping the conveyor
    • Okamura, K. and Yamashina, H., 1979, A heuristic algorithm for the assembly tine model-mix sequencing problem to minimize the risk of stopping the conveyor. International Journal of Production Research, 17, 233-247.
    • (1979) International Journal of Production Research , vol.17 , pp. 233-247
    • Okamura, K.1    Yamashina, H.2
  • 20
    • 30244535639 scopus 로고
    • Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems
    • Sumichrast, R.T. and Russel, R.S., 1990, Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems. Journal of Operations Management, 9, 371-390.
    • (1990) Journal of Operations Management , vol.9 , pp. 371-390
    • Sumichrast, R.T.1    Russel, R.S.2
  • 21
    • 0026624344 scopus 로고
    • A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
    • Sumichrast, R.T., Russel, R.S. and Taylor, B.W., 1992, A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system. International Journal of Production Research, 30, 199-214.
    • (1992) International Journal of Production Research , vol.30 , pp. 199-214
    • Sumichrast, R.T.1    Russel, R.S.2    Taylor, B.W.3
  • 22
    • 0029276137 scopus 로고
    • Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage
    • Tsai, L.H., 1995, Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage. Management Science, 41, 485-495.
    • (1995) Management Science , vol.41 , pp. 485-495
    • Tsai, L.H.1
  • 23
    • 0000298775 scopus 로고
    • Sequencing to minimize work overload in assembly lines with product options
    • Yano, C.A. and Rachamadugu, R., 1991, Sequencing to minimize work overload in assembly lines with product options. Management Science, 37, 572-586.
    • (1991) Management Science , vol.37 , pp. 572-586
    • Yano, C.A.1    Rachamadugu, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.