메뉴 건너뛰기




Volumn 11, Issue 4, 2000, Pages 357-362

Some structural properties for the just-in-time level schedule problem

Author keywords

Assembly systems; Just in time; Level schedule; Mixed models; Sequencing

Indexed keywords

ASSEMBLY; INVENTORY CONTROL; MANUFACTURE; SCHEDULING; THEOREM PROVING;

EID: 0034211911     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/095372800232081     Document Type: Article
Times cited : (13)

References (9)
  • 1
    • 0030284772 scopus 로고    scopus 로고
    • A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
    • Aigbedo, H., and Monden, Y., 1996, A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines. International Journal of Production Research, 34, 3107-3124.
    • (1996) International Journal of Production Research , vol.34 , pp. 3107-3124
    • Aigbedo, H.1    Monden, Y.2
  • 2
    • 0026933958 scopus 로고
    • Scheduling algorithms to minimize utility work at a single station on a paced assembly line
    • Bolat, A., and Yano, C., 1992a, Scheduling algorithms to minimize utility work at a single station on a paced assembly line. Production Planning & Control, 3, 393-405.
    • (1992) Production Planning & Control , vol.3 , pp. 393-405
    • Bolat, A.1    Yano, C.2
  • 3
    • 0026936861 scopus 로고
    • A surrogate objective for utility work in paced assembly lines
    • Bolat, A., and Yano, C., 1992b, A surrogate objective for utility work in paced assembly lines. Production Planning & Control, 3, 406-412.
    • (1992) Production Planning & Control , vol.3 , pp. 406-412
    • Bolat, A.1    Yano, C.2
  • 4
    • 0024010206 scopus 로고
    • One-processor scheduling with symmetric early and tardiness penalties
    • Garey, M., Tarjan, R., and Wilfong, G., 1988, One-processor scheduling with symmetric early and tardiness penalties. Mathematics of Operations Research, 15, 330-348.
    • (1988) Mathematics of Operations Research , vol.15 , pp. 330-348
    • Garey, M.1    Tarjan, R.2    Wilfong, G.3
  • 5
    • 0001602291 scopus 로고
    • Sequencing JIT mixed-model assembly lines
    • Inman, R., and Bulfin, R., 1991, Sequencing JIT mixed-model assembly lines. Management Science, 37, 901-904.
    • (1991) Management Science , vol.37 , pp. 901-904
    • Inman, R.1    Bulfin, R.2
  • 6
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in JIT systems: A survey
    • Kubiak, W., 1993, Minimizing variation of production rates in JIT systems: a survey. European Journal of Operational Research, 66, 259-271.
    • (1993) European Journal of Operational Research , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 7
  • 8
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • Miltenburg, J., 1989, Level schedules for mixed-model assembly lines in Just-In-Time production systems. Management Sciences, 35, 192-207.
    • (1989) Management Sciences , vol.35 , pp. 192-207
    • Miltenburg, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.