메뉴 건너뛰기




Volumn 12, Issue 2, 2000, Pages 219-234

Information-based dynamic manufacturing system scheduling

Author keywords

[No Author keywords available]

Indexed keywords

FAILURE (MECHANICAL); FLEXIBLE MANUFACTURING SYSTEMS; GENETIC ALGORITHMS; INFORMATION MANAGEMENT; MACHINERY; OPTIMIZATION;

EID: 0034172309     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1023/a:1008151831821     Document Type: Article
Times cited : (22)

References (16)
  • 1
    • 0043231135 scopus 로고    scopus 로고
    • Genetic Learning Through Simulation: An Investigation in Shop-Floor Scheduling
    • March
    • Aytug, H., Bhattacharyya, S., and Koehler, G. J., "Genetic Learning Through Simulation: An Investigation in Shop-Floor Scheduling," Annals of Operations Research, Vol. 78, pp. 1-29 (March 1998).
    • (1998) Annals of Operations Research , vol.78 , pp. 1-29
    • Aytug, H.1    Bhattacharyya, S.2    Koehler, G.J.3
  • 3
    • 0021496929 scopus 로고
    • Sequencing Rules and Due-Date Assignments in a Job Shop
    • Baker, K. R., "Sequencing Rules and Due-Date Assignments in a Job Shop," Management Science, Vol. 30, No. 9, pp. 1093-1104 (1984).
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 6
    • 0032163501 scopus 로고    scopus 로고
    • Integration of Inductive Learning and Neural Networks for Multiobjective FMS Scheduling
    • September
    • Kim, C. O., Min, H. S., and Yih, Y., "Integration of Inductive Learning and Neural Networks for Multiobjective FMS Scheduling," International Journal of Production Research, Vol. 36, No. 9, pp. 2497-2509 (September 1998).
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2497-2509
    • Kim, C.O.1    Min, H.S.2    Yih, Y.3
  • 7
    • 0031246898 scopus 로고    scopus 로고
    • Using an Unsupervised Neural-Network and Decision Tree as Knowledge Acquisition Tools for FMS Scheduling
    • October
    • Li, D. C., Wu, C. S., and Torng, K. Y., "Using an Unsupervised Neural-Network and Decision Tree as Knowledge Acquisition Tools for FMS Scheduling," International Journal of System Sciences, Vol. 28, No. 10, pp. 977-985 (October 1997).
    • (1997) International Journal of System Sciences , vol.28 , Issue.10 , pp. 977-985
    • Li, D.C.1    Wu, C.S.2    Torng, K.Y.3
  • 8
    • 0000123778 scopus 로고
    • Self-Improving Reactive Agents Based on Reinforcement Learning, Planning and Teaching
    • Lin, L., "Self-Improving Reactive Agents Based on Reinforcement Learning, Planning and Teaching," Machine Learning, Vol. 8, pp. 293-321 (1992).
    • (1992) Machine Learning , vol.8 , pp. 293-321
    • Lin, L.1
  • 9
    • 0027553236 scopus 로고
    • Multiple Job Scheduling with Artificial Neural Networks
    • March
    • Lo, Z.-P. and Bavarian, B., "Multiple Job Scheduling with Artificial Neural Networks," Computers and Electrical Engineering, Vol. 19, No. 2, pp. 87-101 (March 1993).
    • (1993) Computers and Electrical Engineering , vol.19 , Issue.2 , pp. 87-101
    • Lo, Z.-P.1    Bavarian, B.2
  • 10
    • 0027187039 scopus 로고
    • Integration of Simulation Modeling and Inductive Learning in an Adaptive Decision Support System
    • Piramuthu, S., Park, S. C., Raman, N., and Shaw, M. J., "Integration of Simulation Modeling and Inductive Learning in an Adaptive Decision Support System," Decision Support Systems, Vol. 9, pp. 127-142 (1993).
    • (1993) Decision Support Systems , vol.9 , pp. 127-142
    • Piramuthu, S.1    Park, S.C.2    Raman, N.3    Shaw, M.J.4
  • 14
    • 0000936343 scopus 로고
    • Intelligent Scheduling with Machine Learning Capabilities: The Induction of Scheduling Knowledge
    • Shaw, M. J., Raman, N., and Park, S. C., "Intelligent Scheduling with Machine Learning Capabilities: The Induction of Scheduling Knowledge," IIE Transactions, Vol. 24, No. 2, pp. 156-168 (1992).
    • (1992) IIE Transactions , vol.24 , Issue.2 , pp. 156-168
    • Shaw, M.J.1    Raman, N.2    Park, S.C.3
  • 15
    • 0029389690 scopus 로고
    • Genetics-Based Learning of New Heuristics: Rational Scheduling of Experiments and Generalization
    • October
    • Wah, B. W., Leumwananonthachai, A., Chu, L.-C., and Aizawa, A. N., "Genetics-Based Learning of New Heuristics: Rational Scheduling of Experiments and Generalization," IEEE Transactions on Knowledge and Data Engineering, Vol. 7, No. 5, pp. 763-785 (October 1995).
    • (1995) IEEE Transactions on Knowledge and Data Engineering , vol.7 , Issue.5 , pp. 763-785
    • Wah, B.W.1    Leumwananonthachai, A.2    Chu, L.-C.3    Aizawa, A.N.4
  • 16
    • 0032027288 scopus 로고    scopus 로고
    • A Framework for Reinforcement-Based Scheduling in Parallel Processing Systems
    • March
    • Zomaya, A. Y., M. Clements, and S. Olariu., "A Framework for Reinforcement-Based Scheduling in Parallel Processing Systems," IEEE Transactions on Parallel and Distributed Systems, Vol. 9, No. 3, pp. 249-260 (March 1998).
    • (1998) IEEE Transactions on Parallel and Distributed Systems , vol.9 , Issue.3 , pp. 249-260
    • Zomaya, A.Y.1    Clements, M.2    Olariu, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.