메뉴 건너뛰기




Volumn 9, Issue 1, 1998, Pages 74-86

Evaluation of scheduling strategies for a dynamic job shop in a tool-shared, flexible manufacturing environment

Author keywords

Flexible manufacturing systems; Job scheduling rules; Simulation; Tool selection policies; Tool shared production

Indexed keywords

EVALUATION; FLEXIBLE MANUFACTURING SYSTEMS; JOB ANALYSIS; OPTIMIZATION; PRODUCTION CONTROL; TOOLS;

EID: 0031641158     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/095372898234541     Document Type: Review
Times cited : (8)

References (17)
  • 1
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • BAKER, K. R., 1984, Sequencing rules and due-date assignments in a job shop. Management Science, 30, 1093-1104.
    • (1984) Management Science , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 2
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • BAKER, K. R., and SCUDDER, G. D., 1990, Sequencing with earliness and tardiness penalties: a review. Operations Research, 38, 22-36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0043154725 scopus 로고
    • The management of tool flows in highly automated flexible machining installa-tions
    • Edinburgh (Mechanical Engineering Publications Ltd., Suffolk)
    • BELL, R., and DE SOUZA, R. B. R., 1987, The management of tool flows in highly automated flexible machining installa-tions. Proceedings of Second International Conference on Computer-Aided Production Engineering, Edinburgh (Mechanical Engineering Publications Ltd., Suffolk), pp. 233-238.
    • (1987) Proceedings of Second International Conference on Computer-Aided Production Engineering , pp. 233-238
    • Bell, R.1    De Souza, R.B.R.2
  • 5
    • 0022958225 scopus 로고
    • Developing integrated tooling systems: A case study at Garret Turbine Engine Company
    • Boston, MA (Institute of Industrial Engineers, Norcross, GA)
    • CUMINGS, S., 1986, Developing integrated tooling systems: a case study at Garret Turbine Engine Company. Proceedings of the Fall Industrial Engineering Conference, Boston, MA (Institute of Industrial Engineers, Norcross, GA), pp. 21-26.
    • (1986) Proceedings of the Fall Industrial Engineering Conference , pp. 21-26
    • Cumings, S.1
  • 7
    • 0024716540 scopus 로고
    • Real-time tool control and job dispatching in flexible manufacturing systems
    • HAN, M., NA, Y. K., and HOGG, G. L., 1989, Real-time tool control and job dispatching in flexible manufacturing systems. International Journal Production Research, 27, 1257-1267.
    • (1989) International Journal Production Research , vol.27 , pp. 1257-1267
    • Han, M.1    Na, Y.K.2    Hogg, G.L.3
  • 8
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • HAUPT, R., 1989, A survey of priority rule-based scheduling. OR Spektrum, 11, 3-16.
    • (1989) OR Spektrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 11
    • 0018059674 scopus 로고
    • Approximations in finite-capacity multi-server queues with Poisson arrivals
    • NOZAKI, S. A., and ROSS, S. M., 1978, Approximations in finite-capacity multi-server queues with Poisson arrivals. Journal of Applied Probability, 15, 826-834.
    • (1978) Journal of Applied Probability , vol.15 , pp. 826-834
    • Nozaki, S.A.1    Ross, S.M.2
  • 13
    • 0004195446 scopus 로고
    • Halsted Press, New York and Systems Publishing Corporation, West Lafayette, IN
    • PRITSKER, A. A. B., 1986, Introduction to Simulation and SLAM II (Halsted Press, New York and Systems Publishing Corporation, West Lafayette, IN).
    • (1986) Introduction to Simulation and SLAM II
    • Pritsker, A.A.B.1
  • 15
    • 0029777795 scopus 로고    scopus 로고
    • Job shop scheduling: An experimental investigation of the performance of alternative scheduling rules
    • RANDHAWA, S. U., and ZENG, Y., 1996, Job shop scheduling: an experimental investigation of the performance of alternative scheduling rules. Production Planning & Control, 7, 47-56.
    • (1996) Production Planning & Control , vol.7 , pp. 47-56
    • Randhawa, S.U.1    Zeng, Y.2
  • 16
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • RUSSELL, R. S., DAR-EL, E. M., and TAYLOR, III, B. M., 1987, A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research, 25, 1523-1540.
    • (1987) International Journal of Production Research , vol.25 , pp. 1523-1540
    • Russell, R.S.1    Dar-El, E.M.2    Taylor III, B.M.3
  • 17
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • WEIN, L. M., and CHEVALIER, P. B., 1992, A broader view of the job-shop scheduling problem. Management Science, 38, 1018-1033.
    • (1992) Management Science , vol.38 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.