메뉴 건너뛰기




Volumn 34, Issue 11-12, 2003, Pages 671-681

Application of component state model for identifying constructability conflicts in a merged construction schedule

Author keywords

Activity criteria; Conflict identification; Constructability analysis; Process model; Product model; Schedule

Indexed keywords

COMPUTER SIMULATION; CONSTRUCTION INDUSTRY; PLASTER; SCHEDULING;

EID: 0141961732     PISSN: 09659978     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0965-9978(03)00105-4     Document Type: Conference Paper
Times cited : (11)

References (28)
  • 1
    • 0043253368 scopus 로고    scopus 로고
    • Formalization and automation of time-space conflict analysis
    • Akinci B., Fischer M., Levitt R., Carlson R. Formalization and automation of time-space conflict analysis. J Comput Civil Engng. 16:(2):2002;124-134.
    • (2002) J Comput Civil Engng , vol.16 , Issue.2 , pp. 124-134
    • Akinci, B.1    Fischer, M.2    Levitt, R.3    Carlson, R.4
  • 7
    • 26744463639 scopus 로고
    • Guidelines for implementing a constructability program
    • The Construction Industry Institute and The University of Texas at Austin
    • Construction Industry Institute, Guidelines for implementing a constructability program. Publication of 3-2, The Construction Industry Institute and The University of Texas at Austin; 1987.
    • (1987) Publication of 3-2
  • 8
    • 84974449619 scopus 로고
    • OARPLAN: Generating project plans by reasoning about objects, actions and resources
    • Darwiche A., Levitt R.E., Hayes-Roth B. OARPLAN: generating project plans by reasoning about objects, actions and resources. Artif Intell Engng Des Anal Manuf. 2:(3):1989;169-181.
    • (1989) Artif Intell Engng Des Anal Manuf , vol.2 , Issue.3 , pp. 169-181
    • Darwiche, A.1    Levitt, R.E.2    Hayes-Roth, B.3
  • 11
    • 0030196033 scopus 로고    scopus 로고
    • Examples and characteristics of shared project models
    • Fischer M., Froese T. Examples and characteristics of shared project models. J Comput Civil Engng. 10:(3):1996;174-182.
    • (1996) J Comput Civil Engng , vol.10 , Issue.3 , pp. 174-182
    • Fischer, M.1    Froese, T.2
  • 12
    • 0030190038 scopus 로고    scopus 로고
    • Models of construction process information
    • Froese T. Models of construction process information. J Comput Civil Engng. 10:(3):1996;183-193.
    • (1996) J Comput Civil Engng , vol.10 , Issue.3 , pp. 183-193
    • Froese, T.1
  • 13
    • 0028517808 scopus 로고
    • MDA planner: Interactive planning tool using product models and construction methods
    • Jägbeck A. MDA planner: interactive planning tool using product models and construction methods. J Comput Civil Engng. 8:(4):1994;537-554.
    • (1994) J Comput Civil Engng , vol.8 , Issue.4 , pp. 537-554
    • Jägbeck, A.1
  • 14
    • 0000363297 scopus 로고    scopus 로고
    • Automating communication in civil engineering
    • Luiten G.T., Tolman F.P. Automating communication in civil engineering. J Construct Engng Manage. 123:(2):1997;113-120.
    • (1997) J Construct Engng Manage , vol.123 , Issue.2 , pp. 113-120
    • Luiten, G.T.1    Tolman, F.P.2
  • 16
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualising construction schedules with CAD tools
    • McKinney K., Fischer M. Generating, evaluating and visualising construction schedules with CAD tools. J Autom Construct. 7:(6):1998;443-447.
    • (1998) J Autom Construct , vol.7 , Issue.6 , pp. 443-447
    • McKinney, K.1    Fischer, M.2
  • 18
    • 0029470095 scopus 로고
    • Patterns of construction-space in multistory buildings
    • Riley D.R., Sanvido V.E. Patterns of construction-space in multistory buildings. J Construct Engng Manage. 121:(4):1995;464-473.
    • (1995) J Construct Engng Manage , vol.121 , Issue.4 , pp. 464-473
    • Riley, D.R.1    Sanvido, V.E.2
  • 19
    • 0002299336 scopus 로고    scopus 로고
    • Space planning method for multistory building construction
    • Riley D.R., Sanvido V.E. Space planning method for multistory building construction. J Construct Engng Manage. 123:(2):1997;171-180.
    • (1997) J Construct Engng Manage , vol.123 , Issue.2 , pp. 171-180
    • Riley, D.R.1    Sanvido, V.E.2
  • 21
    • 0032147772 scopus 로고    scopus 로고
    • Project management information control systems
    • Shahid S., Froese T. Project management information control systems. Can J Civil Engng. 25:(4):1998;735-754.
    • (1998) Can J Civil Engng , vol.25 , Issue.4 , pp. 735-754
    • Shahid, S.1    Froese, T.2
  • 22
    • 0142009400 scopus 로고    scopus 로고
    • COSEE: Component state network centric model for verifying temporal and spatial consistence in project schedules
    • Waiheke Island, Auckland, New Zealand; April (in press).
    • Song Y, Chua DKH. COSEE: component state network centric model for verifying temporal and spatial consistence in project schedules. The 20th CIB W78 Conference on Information Technology in Construction, Waiheke Island, Auckland, New Zealand; 23-25 April 2003 (in press).
    • (2003) The 20th CIB W78 Conference on Information Technology in Construction , pp. 23-25
    • Song, Y.1    Chua, D.K.H.2
  • 23
    • 0030195306 scopus 로고    scopus 로고
    • Object-oriented model for integrating construction product and process information
    • Stumpf A.L., Ganeshan R., Chin S., Liu L.Y. Object-oriented model for integrating construction product and process information. J Comput Civil Engng. 10:(3):1996;204-212.
    • (1996) J Comput Civil Engng , vol.10 , Issue.3 , pp. 204-212
    • Stumpf, A.L.1    Ganeshan, R.2    Chin, S.3    Liu, L.Y.4
  • 24
    • 0028401574 scopus 로고
    • Modelling work space to schedule repetitive floors in multistory buildings
    • Thabet W.Y., Beliveau Y.J. Modelling work space to schedule repetitive floors in multistory buildings. J Construct Engng Manage. 120:(1):1994;96-116.
    • (1994) J Construct Engng Manage , vol.120 , Issue.1 , pp. 96-116
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 25
    • 0028750185 scopus 로고
    • HVLS: Horizontal and vertical logic scheduler for multistory projects
    • Thabet W.Y., Beliveau Y.J. HVLS: horizontal and vertical logic scheduler for multistory projects. J Construct Engng Manage. 120:(4):1994;875-892.
    • (1994) J Construct Engng Manage , vol.120 , Issue.4 , pp. 875-892
    • Thabet, W.Y.1    Beliveau, Y.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.