-
1
-
-
0043253368
-
Formalization and automation of time-space conflict analysis
-
Akinci B., Fischer M., Levitt R., Carlson R. Formalization and automation of time-space conflict analysis. J Comput Civil Engng. 16:(2):2002;124-134.
-
(2002)
J Comput Civil Engng
, vol.16
, Issue.2
, pp. 124-134
-
-
Akinci, B.1
Fischer, M.2
Levitt, R.3
Carlson, R.4
-
3
-
-
0032667279
-
Work plan: Constraint-based database for work package scheduling
-
Choo H.J., Tommelein I.D., Ballard G., Zabelle T.R. Work plan: constraint-based database for work package scheduling. J Construct Engng Manage. 125:(3):1999;151-160.
-
(1999)
J Construct Engng Manage
, vol.125
, Issue.3
, pp. 151-160
-
-
Choo, H.J.1
Tommelein, I.D.2
Ballard, G.3
Zabelle, T.R.4
-
7
-
-
26744463639
-
Guidelines for implementing a constructability program
-
The Construction Industry Institute and The University of Texas at Austin
-
Construction Industry Institute, Guidelines for implementing a constructability program. Publication of 3-2, The Construction Industry Institute and The University of Texas at Austin; 1987.
-
(1987)
Publication of 3-2
-
-
-
8
-
-
84974449619
-
OARPLAN: Generating project plans by reasoning about objects, actions and resources
-
Darwiche A., Levitt R.E., Hayes-Roth B. OARPLAN: generating project plans by reasoning about objects, actions and resources. Artif Intell Engng Des Anal Manuf. 2:(3):1989;169-181.
-
(1989)
Artif Intell Engng Des Anal Manuf
, vol.2
, Issue.3
, pp. 169-181
-
-
Darwiche, A.1
Levitt, R.E.2
Hayes-Roth, B.3
-
9
-
-
0003977174
-
-
Englewood Cliffs, NJ: Prentice Hall
-
Fenves S., Flemming U., Hendrickson C., Maher M.L., Quadrel R., Terk M., Woodbury R. Concurrent computer integrated building design. 1994;Prentice Hall, Englewood Cliffs, NJ.
-
(1994)
Concurrent Computer Integrated Building Design
-
-
Fenves, S.1
Flemming, U.2
Hendrickson, C.3
Maher, M.L.4
Quadrel, R.5
Terk, M.6
Woodbury, R.7
-
11
-
-
0030196033
-
Examples and characteristics of shared project models
-
Fischer M., Froese T. Examples and characteristics of shared project models. J Comput Civil Engng. 10:(3):1996;174-182.
-
(1996)
J Comput Civil Engng
, vol.10
, Issue.3
, pp. 174-182
-
-
Fischer, M.1
Froese, T.2
-
12
-
-
0030190038
-
Models of construction process information
-
Froese T. Models of construction process information. J Comput Civil Engng. 10:(3):1996;183-193.
-
(1996)
J Comput Civil Engng
, vol.10
, Issue.3
, pp. 183-193
-
-
Froese, T.1
-
13
-
-
0028517808
-
MDA planner: Interactive planning tool using product models and construction methods
-
Jägbeck A. MDA planner: interactive planning tool using product models and construction methods. J Comput Civil Engng. 8:(4):1994;537-554.
-
(1994)
J Comput Civil Engng
, vol.8
, Issue.4
, pp. 537-554
-
-
Jägbeck, A.1
-
14
-
-
0000363297
-
Automating communication in civil engineering
-
Luiten G.T., Tolman F.P. Automating communication in civil engineering. J Construct Engng Manage. 123:(2):1997;113-120.
-
(1997)
J Construct Engng Manage
, vol.123
, Issue.2
, pp. 113-120
-
-
Luiten, G.T.1
Tolman, F.P.2
-
15
-
-
0030651628
-
4D analysis of temporary support
-
McKinney K., Fischer M. 4D analysis of temporary support. Proceeding of the Forth Congress in Computing in Civil Engineering, ASCE, Philadelphia, PA. 1997;470-476.
-
(1997)
Proceeding of the Forth Congress in Computing in Civil Engineering, ASCE, Philadelphia, PA
, pp. 470-476
-
-
McKinney, K.1
Fischer, M.2
-
16
-
-
0032165225
-
Generating, evaluating and visualising construction schedules with CAD tools
-
McKinney K., Fischer M. Generating, evaluating and visualising construction schedules with CAD tools. J Autom Construct. 7:(6):1998;443-447.
-
(1998)
J Autom Construct
, vol.7
, Issue.6
, pp. 443-447
-
-
McKinney, K.1
Fischer, M.2
-
18
-
-
0029470095
-
Patterns of construction-space in multistory buildings
-
Riley D.R., Sanvido V.E. Patterns of construction-space in multistory buildings. J Construct Engng Manage. 121:(4):1995;464-473.
-
(1995)
J Construct Engng Manage
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
19
-
-
0002299336
-
Space planning method for multistory building construction
-
Riley D.R., Sanvido V.E. Space planning method for multistory building construction. J Construct Engng Manage. 123:(2):1997;171-180.
-
(1997)
J Construct Engng Manage
, vol.123
, Issue.2
, pp. 171-180
-
-
Riley, D.R.1
Sanvido, V.E.2
-
21
-
-
0032147772
-
Project management information control systems
-
Shahid S., Froese T. Project management information control systems. Can J Civil Engng. 25:(4):1998;735-754.
-
(1998)
Can J Civil Engng
, vol.25
, Issue.4
, pp. 735-754
-
-
Shahid, S.1
Froese, T.2
-
22
-
-
0142009400
-
COSEE: Component state network centric model for verifying temporal and spatial consistence in project schedules
-
Waiheke Island, Auckland, New Zealand; April (in press).
-
Song Y, Chua DKH. COSEE: component state network centric model for verifying temporal and spatial consistence in project schedules. The 20th CIB W78 Conference on Information Technology in Construction, Waiheke Island, Auckland, New Zealand; 23-25 April 2003 (in press).
-
(2003)
The 20th CIB W78 Conference on Information Technology in Construction
, pp. 23-25
-
-
Song, Y.1
Chua, D.K.H.2
-
23
-
-
0030195306
-
Object-oriented model for integrating construction product and process information
-
Stumpf A.L., Ganeshan R., Chin S., Liu L.Y. Object-oriented model for integrating construction product and process information. J Comput Civil Engng. 10:(3):1996;204-212.
-
(1996)
J Comput Civil Engng
, vol.10
, Issue.3
, pp. 204-212
-
-
Stumpf, A.L.1
Ganeshan, R.2
Chin, S.3
Liu, L.Y.4
-
24
-
-
0028401574
-
Modelling work space to schedule repetitive floors in multistory buildings
-
Thabet W.Y., Beliveau Y.J. Modelling work space to schedule repetitive floors in multistory buildings. J Construct Engng Manage. 120:(1):1994;96-116.
-
(1994)
J Construct Engng Manage
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
25
-
-
0028750185
-
HVLS: Horizontal and vertical logic scheduler for multistory projects
-
Thabet W.Y., Beliveau Y.J. HVLS: horizontal and vertical logic scheduler for multistory projects. J Construct Engng Manage. 120:(4):1994;875-892.
-
(1994)
J Construct Engng Manage
, vol.120
, Issue.4
, pp. 875-892
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
|