메뉴 건너뛰기




Volumn 25, Issue 6, 1998, Pages 1059-1077

Automated schedule generation

Author keywords

Automated schedule generation; Computer integration; Construction; Expert system; Project management; Rule based; Scheduling; Template

Indexed keywords

ARTIFICIAL INTELLIGENCE; EXPERT SYSTEMS; SCHEDULING; STRATEGIC PLANNING;

EID: 0032321425     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/l98-029     Document Type: Article
Times cited : (27)

References (30)
  • 1
    • 0029702479 scopus 로고    scopus 로고
    • Requirements for industry applicability of knowledge-based schedulers
    • Anaheim, Calif., June 17-19. American Society of Civil Engineers
    • Aalami, F., and Fischer, M.A. 1996. Requirements for industry applicability of knowledge-based schedulers. Proceedings of the 3rd Congress on Computing in Civil Engineering, Anaheim, Calif., June 17-19. American Society of Civil Engineers, pp. 774- 780.
    • (1996) Proceedings of the 3rd Congress on Computing in Civil Engineering , pp. 774-780
    • Aalami, F.1    Fischer, M.A.2
  • 3
    • 0029226077 scopus 로고
    • Case-based scheduling using product models
    • Atlanta, Ga., June 5-8, American Society of Civil Engineers
    • Dzeng, R., and Tommelein, I.D. 1995. Case-based scheduling using product models. Proceedings of the 2nd Congress on Computers in Civil Engineering, Atlanta, Ga., June 5-8, American Society of Civil Engineers, Vol. 1, pp. 163-170.
    • (1995) Proceedings of the 2nd Congress on Computers in Civil Engineering , vol.1 , pp. 163-170
    • Dzeng, R.1    Tommelein, I.D.2
  • 7
    • 2342666154 scopus 로고    scopus 로고
    • Project management application and computer assisted construction planning in total project systems
    • Froese, T., Rankin, J., and Yu, K. 1997. Project management application and computer assisted construction planning in total project systems. International Journal of Construction Information Technology, 5(1): 63-87.
    • (1997) International Journal of Construction Information Technology , vol.5 , Issue.1 , pp. 63-87
    • Froese, T.1    Rankin, J.2    Yu, K.3
  • 8
    • 84959948615 scopus 로고
    • Intelligent construction time and cost analysis
    • Gray, C. 1986. Intelligent construction time and cost analysis. Construction Management and Economics, 4(2): 135-150.
    • (1986) Construction Management and Economics , vol.4 , Issue.2 , pp. 135-150
    • Gray, C.1
  • 12
    • 0002068657 scopus 로고
    • Using knowledge of construction and project management for automated schedule updating
    • Levitt, R.E., and Kunz, J.C. 1985. Using knowledge of construction and project management for automated schedule updating. Project Management Journal, 16(5): 57-76.
    • (1985) Project Management Journal , vol.16 , Issue.5 , pp. 57-76
    • Levitt, R.E.1    Kunz, J.C.2
  • 15
    • 0029227866 scopus 로고
    • Proposed computer system for optimising building design
    • Atlanta, Ga., June 5-8, American Society of Civil Engineers
    • Naoum, S., and Fong, D. 1995. Proposed computer system for optimising building design. Proceedings of the 2nd Congress on Computing in Civil Engineering, Atlanta, Ga., June 5-8, American Society of Civil Engineers, Vol. 1. pp. 1561-1568.
    • (1995) Proceedings of the 2nd Congress on Computing in Civil Engineering , vol.1 , pp. 1561-1568
    • Naoum, S.1    Fong, D.2
  • 18
    • 0032147733 scopus 로고    scopus 로고
    • Representing a project's physical view in support of project management functions
    • Russell, A.D., and Chevallier, N. 1998. Representing a project's physical view in support of project management functions. Canadian Journal of Civil Engineering, 25(4): 707-717.
    • (1998) Canadian Journal of Civil Engineering , vol.25 , Issue.4 , pp. 707-717
    • Russell, A.D.1    Chevallier, N.2
  • 20
    • 0026914053 scopus 로고
    • CONSCHED: Expert system for scheduling of modular construction projects
    • Shaked, O., and Warszawski, A. 1992. CONSCHED: expert system for scheduling of modular construction projects. ASCE Journal of Construction Engineering, 118(3): 488-506.
    • (1992) ASCE Journal of Construction Engineering , vol.118 , Issue.3 , pp. 488-506
    • Shaked, O.1    Warszawski, A.2
  • 21
    • 0001582375 scopus 로고
    • Knowledge-based system for construction planning of high-rise buildings
    • Shaked, O., and Warszawski, A. 1995. Knowledge-based system for construction planning of high-rise buildings. ASCE Journal of Construction Engineering, 121(2): 172-182.
    • (1995) ASCE Journal of Construction Engineering , vol.121 , Issue.2 , pp. 172-182
    • Shaked, O.1    Warszawski, A.2
  • 23
    • 2342664120 scopus 로고
    • PREDICTE: An expert system for estimating indicative construction times for multi-storey buildings at concept stages
    • Sydney, Australia, March 14-20
    • Stretton, A., and Stevens, G. 1990. PREDICTE: an expert system for estimating indicative construction times for multi-storey buildings at concept stages. Proceedings of CIB90 Building Economics and Construction Management, Sydney, Australia, March 14-20, Vol. 2, pp. 643-649.
    • (1990) Proceedings of CIB90 Building Economics and Construction Management , vol.2 , pp. 643-649
    • Stretton, A.1    Stevens, G.2
  • 29
    • 0025789234 scopus 로고
    • Integrating the processes of design, scheduling, and cost estimating within an object-oriented environment
    • American Society of Civil Engineers, Cambridge, Mass
    • Yau, N., Garrett, J.H., and Kim, S. 1991. Integrating the processes of design, scheduling, and cost estimating within an object-oriented environment. Proceedings of the Construction Congress '91 on Preparing for Construction in the 21st Century, American Society of Civil Engineers, Cambridge, Mass., pp. 342-347.
    • (1991) Proceedings of the Construction Congress '91 on Preparing for Construction in the 21st Century , pp. 342-347
    • Yau, N.1    Garrett, J.H.2    Kim, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.