-
2
-
-
0347982777
-
La méthode du recuit simulé : Optimisation globale dans Rn
-
BONNEMOY C., HAMMA S.B., « La méthode du recuit simulé : optimisation globale dans Rn », RAIRO APII, Vol. 25(5), 1991.
-
(1991)
RAIRO APII
, vol.25
, Issue.5
-
-
Bonnemoy, C.1
Hamma, S.B.2
-
3
-
-
0026417688
-
Branch and bound algorithm for the flowshop with multiple processor
-
BRAH S.A., HUNSUCKER J.L., « Branch and bound algorithm for the flowshop with multiple processor », European Journal of Operational Research, Vol. 51, 1991, pp. 88-99.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 88-99
-
-
Brah, S.A.1
Hunsucker, J.L.2
-
4
-
-
0040998541
-
Complexity of the flow shop with multiple processors scheduling problem, and some dominance conditions
-
Phua. K.H. et al. (Ed.)
-
BRAH S.A., « Complexity of the flow shop with multiple processors scheduling problem, and some dominance conditions », Phua. K.H. et al. (Ed.), Optimization : Techniques and Applications, Vol. 1, World Scientific, Singapore, 1992, pp. 538-545.
-
(1992)
Optimization : Techniques and Applications, Vol. 1, World Scientific, Singapore
, vol.1
, pp. 538-545
-
-
Brah, S.A.1
-
5
-
-
0030194608
-
A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
-
BRAH S.A., « A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors », Production Planning and Control, Vol. 7(4), 1996, pp. 362-373.
-
(1996)
Production Planning and Control
, vol.7
, Issue.4
, pp. 362-373
-
-
Brah, S.A.1
-
6
-
-
0008264656
-
Comparison of scheduling rules in a flow shop with multiple processors : A simulation
-
BRAH S.A., WHEELER G.E., « Comparison of scheduling rules in a flow shop with multiple processors : a simulation », Simulation, Vol. 71(5), 1998, pp. 302-311.
-
(1998)
Simulation
, vol.71
, Issue.5
, pp. 302-311
-
-
Brah, S.A.1
Wheeler, G.E.2
-
7
-
-
0033078202
-
Heuristics for scheduling in a flow shop with multiple processors
-
BRAH S.A., LOO L.L., « Heuristics for scheduling in a flow shop with multiple processors », European Journal of Operational Research, Vol. 113, 1999, pp. 113-122.
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 113-122
-
-
Brah, S.A.1
Loo, L.L.2
-
8
-
-
0029254603
-
Analysis of classes of heuristics for scheduling two stage flow-shop with parallel machines at one stase
-
CHEN B., « Analysis of classes of heuristics for scheduling two stage flow-shop with parallel machines at one stase », The Journal of the Operational Research Society, Vol. 46(2), 1995, pp. 234-244.
-
(1995)
The Journal of the Operational Research Society
, vol.46
, Issue.2
, pp. 234-244
-
-
Chen, B.1
-
9
-
-
0011714888
-
The two-stage flow-shop problem with m machines at each stage
-
DEAL D.E., HUNSUCKER J.L., « The two-stage flow-shop problem with m machines at each stage », Journal of Information and Optimization Sciences, Vol. 12, 1991, pp. 407-417.
-
(1991)
Journal of Information and Optimization Sciences
, vol.12
, pp. 407-417
-
-
Deal, D.E.1
Hunsucker, J.L.2
-
10
-
-
0032167341
-
Flowshop scheduling with identical jobs and uniform parallel machines
-
DESSOUKY M.M., DESSOUKY M., VERMA S.K., « Flowshop scheduling with identical jobs and uniform parallel machines », European Journal of Operational Research, Vol. 109, 1998, pp. 620-631.
-
(1998)
European Journal of Operational Research
, vol.109
, pp. 620-631
-
-
Dessouky, M.M.1
Dessouky, M.2
Verma, S.K.3
-
14
-
-
0030149222
-
A computational study of heuristics for two-stage flexible flow-shops
-
GUINET A., SOLOMON M.M., KEDIA P.K., DUSSAUCHOY A., « A computational study of heuristics for two-stage flexible flow-shops », International Journal of Production Research, Vol. 34(5), 1996, pp. 1399-1416.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.5
, pp. 1399-1416
-
-
Guinet, A.1
Solomon, M.M.2
Kedia, P.K.3
Dussauchoy, A.4
-
15
-
-
0030170411
-
Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
-
GUINET A., SOLOMON M.M , « Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time », International Journal of Production Research, Vol. 34(6), 1996, pp 1643-1654.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.6
, pp. 1643-1654
-
-
Guinet, A.1
Solomon, M.M.2
-
16
-
-
0023995996
-
Two stage hybrid flow shop scheduling problem
-
GUPTA J.N.D., « Two stage hybrid flow shop scheduling problem », Journal of Operations Research Society, Vol. 39(4), 1998, pp. 359-364.
-
(1998)
Journal of Operations Research Society
, vol.39
, Issue.4
, pp. 359-364
-
-
Gupta, J.N.D.1
-
17
-
-
0026190509
-
Schedules for a two stage hybrid flow shop with parallel machines at the second stage
-
GUPTA J.N.D., TUNC E.A. « Schedules for a two stage hybrid flow shop with parallel machines at the second stage », International Journal of Production Research, Vol. 29(7), 1991, pp. 1489-1502.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1489-1502
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
18
-
-
0001326653
-
Scheduling a two-stage hybrid flowshop with separable set-up and removal times
-
GUPTA J.N.D. TUNC E.A. « Scheduling a two-stage hybrid flowshop with separable set-up and removal times », European Journal of Operational Research, Vol. 77, 1994, pp. 415-428.
-
(1994)
European Journal of Operational Research
, vol.77
, pp. 415-428
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
19
-
-
0003899269
-
Heuristic algorithms for the two stage hybrid flow shop
-
HAOUARI M., M'HALLAH R., « Heuristic algorithms for the two stage hybrid flow shop », Operation Research Letters, Vol. 21(1), 1997, pp. 43-53.
-
(1997)
Operation Research Letters
, vol.21
, Issue.1
, pp. 43-53
-
-
Haouari, M.1
M'Hallah, R.2
-
20
-
-
0346933151
-
Métaheuristiques pour l'optimisation combinatoire et l'affectation sous contraintes
-
to appear
-
HAO J.K., GALINIER P., HABIB M., « Métaheuristiques pour l'optimisation combinatoire et l'affectation sous contraintes », to appear in Revue d'Intelligence Artificielle.
-
Revue d'Intelligence Artificielle
-
-
Hao, J.K.1
Galinier, P.2
Habib, M.3
-
21
-
-
0002505896
-
Performance of priority rules in a due date flow shop
-
HUNSUCKER J.L., SHAH J R., « Performance of priority rules in a due date flow shop », OMEGA. Vol. 20, 1992, pp. 73-89.
-
(1992)
OMEGA
, vol.20
, pp. 73-89
-
-
Hunsucker, J.L.1
Shah, J.R.2
-
22
-
-
0028766172
-
Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
-
HUNSUCKER J.L., SHAH J.R., « Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment », European Journal of Operational Research, Vol. 72, 1994, pp. 102-114.
-
(1994)
European Journal of Operational Research
, vol.72
, pp. 102-114
-
-
Hunsucker, J.L.1
Shah, J.R.2
-
23
-
-
0000177367
-
Application of the branch and bound technique to some flow-shop scheduling problems
-
IGNALL A., SCHRÄGE L. « Application of the branch and bound technique to some flow-shop scheduling problems », Operations Research, Vol. 13(3), 1965, pp. 400-412.
-
(1965)
Operations Research
, vol.13
, Issue.3
, pp. 400-412
-
-
Ignall, A.1
Schräge, L.2
-
24
-
-
0008561859
-
Simulated annealing: Theory and applications
-
Kluwer Academic Publishers
-
VAN LAARHOVEN P.J.M., AARTS A.H.L., « Simulated Annealing: Theory and Applications », Operations Research, Kluwer Academic Publishers, 1987.
-
(1987)
Operations Research
-
-
Van Laarhoven, P.J.M.1
Aarts, A.H.L.2
-
25
-
-
0028529503
-
Minimizing makespan in hybrid flow-shops
-
LEE C.Y., VAIRAKTARAKIS G.L., « Minimizing makespan in hybrid flow-shops », Operations Research Letters, Vol. 16(3), 1994, pp. 149-158.
-
(1994)
Operations Research Letters
, vol.16
, Issue.3
, pp. 149-158
-
-
Lee, C.Y.1
Vairaktarakis, G.L.2
-
26
-
-
0031248652
-
A hybrid two stage flow shop with part family, bath production, major and minor set ups
-
LI S., « A hybrid two stage flow shop with part family, bath production, major and minor set ups », European Journal of Operational Research, Vol. 102, 1997, pp. 142-156.
-
(1997)
European Journal of Operational Research
, vol.102
, pp. 142-156
-
-
Li, S.1
-
27
-
-
5744249209
-
Equation of state calculations by fast computing machines
-
METROPOLIS N., ROSENBLUTH A.W., ROSENBLUTH M.W., TELLER A.H.,TELLER E., « Equation of state calculations by fast computing machines », Journal of Chemical Physics, Vol. 21, 1953, pp. 1087-1091.
-
(1953)
Journal of Chemical Physics
, vol.21
, pp. 1087-1091
-
-
Metropolis, N.1
Rosenbluth, A.W.2
Rosenbluth, M.W.3
Teller, A.H.4
Teller, E.5
-
29
-
-
84985846638
-
A comparison of sequencing rules for two stage hybrid flow shop
-
NARASIMHAN S.L., MANGIAMELI P.M., « A comparison of sequencing rules for two stage hybrid flow shop », Decision Sciences, Vol. 18, 1987, pp. 250-265.
-
(1987)
Decision Sciences
, vol.18
, pp. 250-265
-
-
Narasimhan, S.L.1
Mangiameli, P.M.2
-
30
-
-
84889181353
-
An exact method for solving the multi-processor flowshop
-
NERON E., CARLIER J., « An exact Method for Solving The Multi-Processor Flowshop », International Conference on Industrial Engineering and Production Management, Proc. 1, Lyon (France), 1997, pp. 593-600.
-
(1997)
International Conference on Industrial Engineering and Production Management, Proc. 1, Lyon (France)
, vol.1
, pp. 593-600
-
-
Neron, E.1
Carlier, J.2
-
31
-
-
0032050653
-
The flow shop with parallel machines : A Tabu search approach
-
NOWICKI E., SMUTNICKI C., « The flow shop with parallel machines : a Tabu search approach », European Journal of Operational Research, Vol. 106, 1998, pp. 226-253.
-
(1998)
European Journal of Operational Research
, vol.106
, pp. 226-253
-
-
Nowicki, E.1
Smutnicki, C.2
-
32
-
-
0032098627
-
Branch and bound crossed with GA to solve hybrid flow shops
-
PORTMANN M.C., VIGNIER A., DARDILHAC D., DEZALAY D., « Branch and bound crossed with GA to solve hybrid flow shops », European Journal of Operational Research, Vol. 107, 1998, pp. 389-400.
-
(1998)
European Journal of Operational Research
, vol.107
, pp. 389-400
-
-
Portmann, M.C.1
Vignier, A.2
Dardilhac, D.3
Dezalay, D.4
-
34
-
-
0026868840
-
Scheduling in n-job, m-stage flow-shop with parallel processors to minimize makespan
-
RAJENDRAN C., CHAUDHURI D., « Scheduling in n-job, m-stage flow-shop with parallel processors to minimize makespan », International Journal of Production Research, Vol. 27, 1992, pp. 137-143.
-
(1992)
International Journal of Production Research
, vol.27
, pp. 137-143
-
-
Rajendran, C.1
Chaudhuri, D.2
-
35
-
-
0026819776
-
A multi-stage parallel-processors flowshop problem with minimum flowtime
-
RAJENDRAN C., CHAUDHURI D., « A multi-stage parallel-processors flowshop problem with minimum flowtime », European Journal of Operational Research, Vol. 57, 1992, pp. 111-122.
-
(1992)
European Journal of Operational Research
, vol.57
, pp. 111-122
-
-
Rajendran, C.1
Chaudhuri, D.2
-
36
-
-
0032169302
-
A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan
-
RIANE F., « A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan », European Journal of Operational Research, Vol. 109, 1998, pp. 321-329.
-
(1998)
European Journal of Operational Research
, vol.109
, pp. 321-329
-
-
Riane, F.1
-
39
-
-
0029636121
-
Global lower bound for flow shops with multiple processors
-
SANTOS D.L., HUNSUCKER J.L., DEAL D.E., « Global lower bound for flow shops with multiple processors », European Journal of Operational Research, Vol. 80, 1995, pp. 112-120.
-
(1995)
European Journal of Operational Research
, vol.80
, pp. 112-120
-
-
Santos, D.L.1
Hunsucker, J.L.2
Deal, D.E.3
-
40
-
-
0024769054
-
Scheduling algorithms for flexible flowshops: Worst and average case performance
-
SRISKANDARAJAH C., SETHI S.P., « Scheduling algorithms for flexible flowshops: Worst and average case performance », European Journal of Operational Research, Vol. 43, 1989, pp. 143-160.
-
(1989)
European Journal of Operational Research
, vol.43
, pp. 143-160
-
-
Sriskandarajah, C.1
Sethi, S.P.2
-
41
-
-
0027814376
-
Scheduling in a cellular manufacturing system - A simulated annealing approach
-
SRIDHAR J., RAJENDRAN C., « Scheduling in a cellular manufacturing system - a simulated annealing approach», International Journal of Production Research, Vol. 31, 1993, pp. 2927-2945.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2927-2945
-
-
Sridhar, J.1
Rajendran, C.2
-
43
-
-
0033284730
-
Les problèmes d'ordonnancement de type flow-shop hybride : État de l'art
-
VIGNIER A., BILLAUT J.C., PROUST C., « Les problèmes d'ordonnancement de type flow-shop hybride : état de l'art », RAIRO, vol.33(2), 1999, pp. 117-183.
-
(1999)
RAIRO
, vol.33
, Issue.2
, pp. 117-183
-
-
Vignier, A.1
Billaut, J.C.2
Proust, C.3
|