메뉴 건너뛰기




Volumn 34, Issue 9, 2000, Pages 1107-1135

Meta-heuristics for the deterministic hybrid flow shop problem

Author keywords

Hybrid Flow Shop; Metaheuristics; Neighbouring systems; Predictive approach; Resource assignment; Scheduling; Stochastic algorithms

Indexed keywords


EID: 0041780055     PISSN: 12696935     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (9)

References (43)
  • 2
    • 0347982777 scopus 로고
    • La méthode du recuit simulé : Optimisation globale dans Rn
    • BONNEMOY C., HAMMA S.B., « La méthode du recuit simulé : optimisation globale dans Rn », RAIRO APII, Vol. 25(5), 1991.
    • (1991) RAIRO APII , vol.25 , Issue.5
    • Bonnemoy, C.1    Hamma, S.B.2
  • 3
    • 0026417688 scopus 로고
    • Branch and bound algorithm for the flowshop with multiple processor
    • BRAH S.A., HUNSUCKER J.L., « Branch and bound algorithm for the flowshop with multiple processor », European Journal of Operational Research, Vol. 51, 1991, pp. 88-99.
    • (1991) European Journal of Operational Research , vol.51 , pp. 88-99
    • Brah, S.A.1    Hunsucker, J.L.2
  • 4
    • 0040998541 scopus 로고
    • Complexity of the flow shop with multiple processors scheduling problem, and some dominance conditions
    • Phua. K.H. et al. (Ed.)
    • BRAH S.A., « Complexity of the flow shop with multiple processors scheduling problem, and some dominance conditions », Phua. K.H. et al. (Ed.), Optimization : Techniques and Applications, Vol. 1, World Scientific, Singapore, 1992, pp. 538-545.
    • (1992) Optimization : Techniques and Applications, Vol. 1, World Scientific, Singapore , vol.1 , pp. 538-545
    • Brah, S.A.1
  • 5
    • 0030194608 scopus 로고    scopus 로고
    • A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
    • BRAH S.A., « A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors », Production Planning and Control, Vol. 7(4), 1996, pp. 362-373.
    • (1996) Production Planning and Control , vol.7 , Issue.4 , pp. 362-373
    • Brah, S.A.1
  • 6
    • 0008264656 scopus 로고    scopus 로고
    • Comparison of scheduling rules in a flow shop with multiple processors : A simulation
    • BRAH S.A., WHEELER G.E., « Comparison of scheduling rules in a flow shop with multiple processors : a simulation », Simulation, Vol. 71(5), 1998, pp. 302-311.
    • (1998) Simulation , vol.71 , Issue.5 , pp. 302-311
    • Brah, S.A.1    Wheeler, G.E.2
  • 7
    • 0033078202 scopus 로고    scopus 로고
    • Heuristics for scheduling in a flow shop with multiple processors
    • BRAH S.A., LOO L.L., « Heuristics for scheduling in a flow shop with multiple processors », European Journal of Operational Research, Vol. 113, 1999, pp. 113-122.
    • (1999) European Journal of Operational Research , vol.113 , pp. 113-122
    • Brah, S.A.1    Loo, L.L.2
  • 8
    • 0029254603 scopus 로고
    • Analysis of classes of heuristics for scheduling two stage flow-shop with parallel machines at one stase
    • CHEN B., « Analysis of classes of heuristics for scheduling two stage flow-shop with parallel machines at one stase », The Journal of the Operational Research Society, Vol. 46(2), 1995, pp. 234-244.
    • (1995) The Journal of the Operational Research Society , vol.46 , Issue.2 , pp. 234-244
    • Chen, B.1
  • 15
    • 0030170411 scopus 로고    scopus 로고
    • Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
    • GUINET A., SOLOMON M.M , « Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time », International Journal of Production Research, Vol. 34(6), 1996, pp 1643-1654.
    • (1996) International Journal of Production Research , vol.34 , Issue.6 , pp. 1643-1654
    • Guinet, A.1    Solomon, M.M.2
  • 16
    • 0023995996 scopus 로고    scopus 로고
    • Two stage hybrid flow shop scheduling problem
    • GUPTA J.N.D., « Two stage hybrid flow shop scheduling problem », Journal of Operations Research Society, Vol. 39(4), 1998, pp. 359-364.
    • (1998) Journal of Operations Research Society , vol.39 , Issue.4 , pp. 359-364
    • Gupta, J.N.D.1
  • 17
    • 0026190509 scopus 로고
    • Schedules for a two stage hybrid flow shop with parallel machines at the second stage
    • GUPTA J.N.D., TUNC E.A. « Schedules for a two stage hybrid flow shop with parallel machines at the second stage », International Journal of Production Research, Vol. 29(7), 1991, pp. 1489-1502.
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1489-1502
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 18
    • 0001326653 scopus 로고
    • Scheduling a two-stage hybrid flowshop with separable set-up and removal times
    • GUPTA J.N.D. TUNC E.A. « Scheduling a two-stage hybrid flowshop with separable set-up and removal times », European Journal of Operational Research, Vol. 77, 1994, pp. 415-428.
    • (1994) European Journal of Operational Research , vol.77 , pp. 415-428
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 19
    • 0003899269 scopus 로고    scopus 로고
    • Heuristic algorithms for the two stage hybrid flow shop
    • HAOUARI M., M'HALLAH R., « Heuristic algorithms for the two stage hybrid flow shop », Operation Research Letters, Vol. 21(1), 1997, pp. 43-53.
    • (1997) Operation Research Letters , vol.21 , Issue.1 , pp. 43-53
    • Haouari, M.1    M'Hallah, R.2
  • 20
    • 0346933151 scopus 로고    scopus 로고
    • Métaheuristiques pour l'optimisation combinatoire et l'affectation sous contraintes
    • to appear
    • HAO J.K., GALINIER P., HABIB M., « Métaheuristiques pour l'optimisation combinatoire et l'affectation sous contraintes », to appear in Revue d'Intelligence Artificielle.
    • Revue d'Intelligence Artificielle
    • Hao, J.K.1    Galinier, P.2    Habib, M.3
  • 21
    • 0002505896 scopus 로고
    • Performance of priority rules in a due date flow shop
    • HUNSUCKER J.L., SHAH J R., « Performance of priority rules in a due date flow shop », OMEGA. Vol. 20, 1992, pp. 73-89.
    • (1992) OMEGA , vol.20 , pp. 73-89
    • Hunsucker, J.L.1    Shah, J.R.2
  • 22
    • 0028766172 scopus 로고
    • Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
    • HUNSUCKER J.L., SHAH J.R., « Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment », European Journal of Operational Research, Vol. 72, 1994, pp. 102-114.
    • (1994) European Journal of Operational Research , vol.72 , pp. 102-114
    • Hunsucker, J.L.1    Shah, J.R.2
  • 23
    • 0000177367 scopus 로고
    • Application of the branch and bound technique to some flow-shop scheduling problems
    • IGNALL A., SCHRÄGE L. « Application of the branch and bound technique to some flow-shop scheduling problems », Operations Research, Vol. 13(3), 1965, pp. 400-412.
    • (1965) Operations Research , vol.13 , Issue.3 , pp. 400-412
    • Ignall, A.1    Schräge, L.2
  • 24
    • 0008561859 scopus 로고
    • Simulated annealing: Theory and applications
    • Kluwer Academic Publishers
    • VAN LAARHOVEN P.J.M., AARTS A.H.L., « Simulated Annealing: Theory and Applications », Operations Research, Kluwer Academic Publishers, 1987.
    • (1987) Operations Research
    • Van Laarhoven, P.J.M.1    Aarts, A.H.L.2
  • 25
    • 0028529503 scopus 로고
    • Minimizing makespan in hybrid flow-shops
    • LEE C.Y., VAIRAKTARAKIS G.L., « Minimizing makespan in hybrid flow-shops », Operations Research Letters, Vol. 16(3), 1994, pp. 149-158.
    • (1994) Operations Research Letters , vol.16 , Issue.3 , pp. 149-158
    • Lee, C.Y.1    Vairaktarakis, G.L.2
  • 26
    • 0031248652 scopus 로고    scopus 로고
    • A hybrid two stage flow shop with part family, bath production, major and minor set ups
    • LI S., « A hybrid two stage flow shop with part family, bath production, major and minor set ups », European Journal of Operational Research, Vol. 102, 1997, pp. 142-156.
    • (1997) European Journal of Operational Research , vol.102 , pp. 142-156
    • Li, S.1
  • 29
    • 84985846638 scopus 로고
    • A comparison of sequencing rules for two stage hybrid flow shop
    • NARASIMHAN S.L., MANGIAMELI P.M., « A comparison of sequencing rules for two stage hybrid flow shop », Decision Sciences, Vol. 18, 1987, pp. 250-265.
    • (1987) Decision Sciences , vol.18 , pp. 250-265
    • Narasimhan, S.L.1    Mangiameli, P.M.2
  • 31
    • 0032050653 scopus 로고    scopus 로고
    • The flow shop with parallel machines : A Tabu search approach
    • NOWICKI E., SMUTNICKI C., « The flow shop with parallel machines : a Tabu search approach », European Journal of Operational Research, Vol. 106, 1998, pp. 226-253.
    • (1998) European Journal of Operational Research , vol.106 , pp. 226-253
    • Nowicki, E.1    Smutnicki, C.2
  • 34
    • 0026868840 scopus 로고
    • Scheduling in n-job, m-stage flow-shop with parallel processors to minimize makespan
    • RAJENDRAN C., CHAUDHURI D., « Scheduling in n-job, m-stage flow-shop with parallel processors to minimize makespan », International Journal of Production Research, Vol. 27, 1992, pp. 137-143.
    • (1992) International Journal of Production Research , vol.27 , pp. 137-143
    • Rajendran, C.1    Chaudhuri, D.2
  • 35
    • 0026819776 scopus 로고
    • A multi-stage parallel-processors flowshop problem with minimum flowtime
    • RAJENDRAN C., CHAUDHURI D., « A multi-stage parallel-processors flowshop problem with minimum flowtime », European Journal of Operational Research, Vol. 57, 1992, pp. 111-122.
    • (1992) European Journal of Operational Research , vol.57 , pp. 111-122
    • Rajendran, C.1    Chaudhuri, D.2
  • 36
    • 0032169302 scopus 로고    scopus 로고
    • A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan
    • RIANE F., « A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan », European Journal of Operational Research, Vol. 109, 1998, pp. 321-329.
    • (1998) European Journal of Operational Research , vol.109 , pp. 321-329
    • Riane, F.1
  • 40
    • 0024769054 scopus 로고
    • Scheduling algorithms for flexible flowshops: Worst and average case performance
    • SRISKANDARAJAH C., SETHI S.P., « Scheduling algorithms for flexible flowshops: Worst and average case performance », European Journal of Operational Research, Vol. 43, 1989, pp. 143-160.
    • (1989) European Journal of Operational Research , vol.43 , pp. 143-160
    • Sriskandarajah, C.1    Sethi, S.P.2
  • 41
    • 0027814376 scopus 로고
    • Scheduling in a cellular manufacturing system - A simulated annealing approach
    • SRIDHAR J., RAJENDRAN C., « Scheduling in a cellular manufacturing system - a simulated annealing approach», International Journal of Production Research, Vol. 31, 1993, pp. 2927-2945.
    • (1993) International Journal of Production Research , vol.31 , pp. 2927-2945
    • Sridhar, J.1    Rajendran, C.2
  • 43
    • 0033284730 scopus 로고    scopus 로고
    • Les problèmes d'ordonnancement de type flow-shop hybride : État de l'art
    • VIGNIER A., BILLAUT J.C., PROUST C., « Les problèmes d'ordonnancement de type flow-shop hybride : état de l'art », RAIRO, vol.33(2), 1999, pp. 117-183.
    • (1999) RAIRO , vol.33 , Issue.2 , pp. 117-183
    • Vignier, A.1    Billaut, J.C.2    Proust, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.