-
2
-
-
0032216021
-
Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
-
Ierapetritou, M. G.; Floudas, C. A. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Ind. Eng. Chem. Res. 1998, 37, 4341-4359.
-
(1998)
Ind. Eng. Chem. Res.
, vol.37
, pp. 4341-4359
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
3
-
-
0032216021
-
Effective continuous-time formulation for short-term scheduling. 2. Multipurpose batch processes
-
Ierapetritou, M. G.; Floudas, C, A. Effective continuous-time formulation for short-term scheduling. 2. Multipurpose batch processes. Ind. Eng. Chem. Res. 1998, 37, 4360-4374.
-
(1998)
Ind. Eng. Chem. Res.
, vol.37
, pp. 4360-4374
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
4
-
-
0032129291
-
Structured approach to storage allocation for improved process controllability
-
Kelly, J. D.; Forbes, J. Structured approach to storage allocation for improved process controllability. AIChE J. 1998, 44, 1832-1840.
-
(1998)
AIChE J.
, vol.44
, pp. 1832-1840
-
-
Kelly, J.D.1
Forbes, J.2
-
5
-
-
0027545176
-
A general algorithm for scheduling batch operations
-
Kondili, E.; Pantelides, C. C.; Sargent, R. W. H. A general algorithm for scheduling batch operations. Comput. Chem. Eng. 1993, 17, 211-227.
-
(1993)
Comput. Chem. Eng.
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
6
-
-
0030151372
-
Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management
-
Lee, H.; Pinto, J. M.; Grossmann, I. E.; Park, S. Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management. Ind. Eng. Chem. Res. 1996, 35, 1630-1641.
-
(1996)
Ind. Eng. Chem. Res.
, vol.35
, pp. 1630-1641
-
-
Lee, H.1
Pinto, J.M.2
Grossmann, I.E.3
Park, S.4
-
8
-
-
0028500039
-
Optimal cyclic scheduling of multistage continuous multiproduct plants
-
Pinto, J. M.; Grossmann, I. E. Optimal cyclic scheduling of multistage continuous multiproduct plants. Comput. Chem. Eng. 1994, 18, 797-816.
-
(1994)
Comput. Chem. Eng.
, vol.18
, pp. 797-816
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
9
-
-
0032386621
-
Assignment and sequencing models for the scheduling of chemical processes
-
Pinto, J. M.; Grossmann, I. E. Assignment and sequencing models for the scheduling of chemical processes. Ann. Oper. Res. 1998, 81, 433-466.
-
(1998)
Ann. Oper. Res.
, vol.81
, pp. 433-466
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
10
-
-
0034287620
-
Planning and scheduling models for refinery operations
-
Pinto, J. M.; Joly, M.; Moro, L. F. L. Planning and scheduling models for refinery operations. Comput. Chem. Eng. 2000, 24, 2259-2276.
-
(2000)
Comput. Chem. Eng.
, vol.24
, pp. 2259-2276
-
-
Pinto, J.M.1
Joly, M.2
Moro, L.F.L.3
-
11
-
-
0000589412
-
Fuzzy linear frractional goal programming applied to refinery operations planning
-
Ravi, V.; Reddy, P. J. Fuzzy linear frractional goal programming applied to refinery operations planning. Fuzzy Sets Syst. 1998, 96, 173-182.
-
(1998)
Fuzzy Sets Syst.
, vol.96
, pp. 173-182
-
-
Ravi, V.1
Reddy, P.J.2
-
13
-
-
0026108226
-
MINLP model for cyclic multiproduct scheduling on continuous parallel lines
-
Sahinidis, N. V.; Grossmann, I. E. MINLP model for cyclic multiproduct scheduling on continuous parallel lines. Comput. Chem. Eng. 1991, 15, 85-1036.
-
(1991)
Comput. Chem. Eng.
, vol.15
, pp. 85-1036
-
-
Sahinidis, N.V.1
Grossmann, I.E.2
-
14
-
-
0029701808
-
Mathematical programming techinques for crude oil scheduling
-
Shah, N. Mathematical programming techinques for crude oil scheduling. Comput. Chem. Eng. 1996, 20, S1227-S1232.
-
(1996)
Comput. Chem. Eng.
, vol.20
-
-
Shah, N.1
|