메뉴 건너뛰기




Volumn 21, Issue 7, 2003, Pages 534-548

Performance measurement in a supply chain

Author keywords

Analytic hierarchy process; Multi attribute decision making; Performance measurement; Supply chain

Indexed keywords

COST EFFECTIVENESS; CUSTOMER SATISFACTION; DECISION MAKING; ELECTRONICS INDUSTRY; PERFORMANCE; PRODUCTION ENGINEERING; RESOURCE ALLOCATION;

EID: 0038046206     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s001700300063     Document Type: Article
Times cited : (410)

References (37)
  • 4
    • 0032652130 scopus 로고    scopus 로고
    • The forces that shape organizational performance measurement systems: An interdisciplinary review
    • D. B. Waggoner, A. D. Neely and M. P. Kennerley, "The forces that shape organizational performance measurement systems: an interdisciplinary review", International Journal of Production Economics, 60, pp. 53-60, 1999.
    • (1999) International Journal of Production Economics , vol.60 , pp. 53-60
    • Waggoner, D.B.1    Neely, A.D.2    Kennerley, M.P.3
  • 6
    • 0001022816 scopus 로고    scopus 로고
    • Measuring the unmeasurable - Measuring and improving performance in the supply chain
    • R. I. Van Hoek, "Measuring the unmeasurable - measuring and improving performance in the supply chain", Supply Chain Management, 3(4), pp. 187-192, 1998.
    • (1998) Supply Chain Management , vol.3 , Issue.4 , pp. 187-192
    • Van Hoek, R.I.1
  • 9
    • 0032136666 scopus 로고    scopus 로고
    • Supply chain design and analysis: Models and methods
    • B. M. Beamon, "Supply chain design and analysis: models and methods", International Journal of Production Economics, 55, pp. 281-294, 1998.
    • (1998) International Journal of Production Economics , vol.55 , pp. 281-294
    • Beamon, B.M.1
  • 14
    • 0347946641 scopus 로고    scopus 로고
    • Theory and methodology: Lead times, order release mechanisms, and customer service
    • E. Yucesan and D. G. Xaxiew, "Theory and methodology: lead times, order release mechanisms, and customer service", European Journal of Operational Research, 120, pp. 118-130, 2000.
    • (2000) European Journal of Operational Research , vol.120 , pp. 118-130
    • Yucesan, E.1    Xaxiew, D.G.2
  • 15
    • 0038078694 scopus 로고    scopus 로고
    • A process quality model for the analysis, improvement and control of supply chain systems
    • B. M. Beamon and T. M. Ware, "A process quality model for the analysis, improvement and control of supply chain systems", Logistics Information Management, 11(2), pp. 105-113, 1998.
    • (1998) Logistics Information Management , vol.11 , Issue.2 , pp. 105-113
    • Beamon, B.M.1    Ware, T.M.2
  • 16
    • 0032613818 scopus 로고    scopus 로고
    • Defining supply chain management: A historical perspective and practical guidelines
    • R. R. Lummus and R. J. Vokurka, "Defining supply chain management: a historical perspective and practical guidelines", Industrial Management and Data Systems, 99(3), pp. 11-17, 1999.
    • (1999) Industrial Management and Data Systems , vol.99 , Issue.3 , pp. 11-17
    • Lummus, R.R.1    Vokurka, R.J.2
  • 17
    • 0002639791 scopus 로고    scopus 로고
    • Supply chain management in theory and practice: A passing fad or a fundamental change?
    • C. Chandra and S. Kumar, "Supply chain management in theory and practice: a passing fad or a fundamental change?", Industrial Management and Data Systems, 100(3), pp. 100-113, 2000.
    • (2000) Industrial Management and Data Systems , vol.100 , Issue.3 , pp. 100-113
    • Chandra, C.1    Kumar, S.2
  • 18
    • 0033283986 scopus 로고    scopus 로고
    • A theoretical framework for analyzing he dimensions of manufacturing flexibility
    • L. L. Koste and M. K. Malhotra, "A theoretical framework for analyzing he dimensions of manufacturing flexibility", Journal of Operations Management, 18, pp. 75-93, 1999.
    • (1999) Journal of Operations Management , vol.18 , pp. 75-93
    • Koste, L.L.1    Malhotra, M.K.2
  • 21
  • 22
    • 0033320202 scopus 로고    scopus 로고
    • The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system
    • F. Mahmoodi, C. T.Mosier and J. R. Morgan, "The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system", International Journal of Flexible Manufacturing Systems, 11, pp. 271-289, 1999.
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , pp. 271-289
    • Mahmoodi, F.1    Mosier, C.T.2    Morgan, J.R.3
  • 23
    • 0021898921 scopus 로고
    • Effectiveness of alternate operations in a flexible manufacturing system
    • W. E. Wilhelm and H. M. Shin, "Effectiveness of alternate operations in a flexible manufacturing system", International Journal of Production Research, 23(1), pp. 65-79, 1985.
    • (1985) International Journal of Production Research , vol.23 , Issue.1 , pp. 65-79
    • Wilhelm, W.E.1    Shin, H.M.2
  • 25
    • 0030216417 scopus 로고    scopus 로고
    • Formation and dynamic routeing of part families among flexible manufacturing cells
    • H. J. Wen, C. H. Smith and E. D. Minr, "Formation and dynamic routeing of part families among flexible manufacturing cells", International Journal of Production Research, 24(8), pp. 2229-2245, 1996.
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2229-2245
    • Wen, H.J.1    Smith, C.H.2    Minr, E.D.3
  • 26
    • 0034174178 scopus 로고    scopus 로고
    • Supply management orientation and supplier/buyer performance
    • H. Shin, D. A. Collier and D. D. Wilson, "Supply management orientation and supplier/buyer performance", Journal of Operations Management, 18, pp. 317-333, 2000.
    • (2000) Journal of Operations Management , vol.18 , pp. 317-333
    • Shin, H.1    Collier, D.A.2    Wilson, D.D.3
  • 29
    • 0030391457 scopus 로고    scopus 로고
    • The effectiveness of an analytic hierarchy process in group decision making: A case study
    • S. E. Rebstock and R. Kaula, "The effectiveness of an analytic hierarchy process in group decision making: a case study", International Journal of Computer Applications in Technology, 9(2/3), pp. 95-105, 1996.
    • (1996) International Journal of Computer Applications in Technology , vol.9 , Issue.2-3 , pp. 95-105
    • Rebstock, S.E.1    Kaula, R.2
  • 30
    • 0030212155 scopus 로고    scopus 로고
    • Benchmarking logistics performance with an application of the analytic hierarchy process
    • August
    • J. Korpela and M. Tuominen, "Benchmarking logistics performance with an application of the analytic hierarchy process", IEEE Transactions on Engineering Management, 42(3), pp. 323-333, August 1996.
    • (1996) IEEE Transactions on Engineering Management , vol.42 , Issue.3 , pp. 323-333
    • Korpela, J.1    Tuominen, M.2
  • 32
    • 0000544458 scopus 로고
    • Axiomatic foundation of the analytic hierarchy process
    • T. L. Saaty, "Axiomatic foundation of the analytic hierarchy process", Management Science, 32, pp. 841-855, 1996.
    • (1986) Management Science , vol.32 , pp. 841-855
    • Saaty, T.L.1
  • 33
    • 0025700933 scopus 로고
    • How to make a decision: The analytic hierarchy process
    • T. L. Saaty, "How to make a decision: the analytic hierarchy process", European Journal of Operational Research, 48(1), pp. 9-26, 1990.
    • (1990) European Journal of Operational Research , vol.48 , Issue.1 , pp. 9-26
    • Saaty, T.L.1
  • 34
    • 44949288762 scopus 로고
    • An overview of the analytic hierarchy process and its applications
    • L. Vargas, "An overview of the analytic hierarchy process and its applications", European Journal of Operational Research, 48, pp. 2-8, 1990.
    • (1990) European Journal of Operational Research , vol.48 , pp. 2-8
    • Vargas, L.1
  • 36
    • 0038519921 scopus 로고    scopus 로고
    • Expert Choice Inc., Pittsburgh, Pennsylvania, USA
    • Expert Choice, Expert Choice Inc., Pittsburgh, Pennsylvania, USA, 1999.
    • (1999) Expert Choice
  • 37
    • 0038519908 scopus 로고    scopus 로고
    • The perception gap among buyer and suppliers in the semiconductor industry
    • B. Kim, K. Rank and T. Kim, "The perception gap among buyer and suppliers in the semiconductor industry", International Journal of Supply Chain Management, 4(5), pp. 231-241, 1999.
    • (1999) International Journal of Supply Chain Management , vol.4 , Issue.5 , pp. 231-241
    • Kim, B.1    Rank, K.2    Kim, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.