Minimization of the cost of available resources of a project under the constraint of time by an adaptation of the Tabu method;Minimisation du coût de disponibilité des ressources d'un projet sous contrainte de temps par une adaptation de la méthode Tabou

Author keywords

Availability Cost; Project Scheduling; Tabu Search Method

Indexed keywords

COSTS; HEURISTIC METHODS; PROJECT MANAGEMENT; SCHEDULING;

EID: 0036707047     PISSN: 03155986     EISSN: None     Source Type: Journal    
DOI: 10.1080/03155986.2002.11732658     Document Type: Article
Times cited : (4)

References (18)
  • 2
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor, F.F., 1993, Heuristics for Scheduling Projects with Resource Restrictions and Several Resource-Duration Modes, International Journal of Production Research, 31(11): 2547-2558.
    • (1993) International Journal of Production Research , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.F.1
  • 3
    • 0030124780 scopus 로고    scopus 로고
    • A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
    • _ 1996a, A New and Efficient Heuristic for Scheduling Projects with Resource Restrictions and Multiple Execution Modes, European Journal of Operational Research, 90: 349-361.
    • (1996) European Journal of Operational Research , vol.90 , pp. 349-361
  • 4
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • _ 1996b, Resource-Constrained Project Scheduling by Simulated Annealing, International Journal of Production Research, 34(8): 2335-2351.
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2335-2351
  • 5
    • 0001267414 scopus 로고
    • Decision CPM: A method for simultaneous planning, scheduling, and control of projects
    • Crowston, W. et Thompson, G. L., 1967, Decision CPM: a Method For Simultaneous Planning, Scheduling, and Control of Projects, Operations Research, 15: 407-426.
    • (1967) Operations Research , vol.15 , pp. 407-426
    • Crowston, W.1    Thompson, G.L.2
  • 7
    • 0000463458 scopus 로고
    • Minimizing resource availability costs in time-limited project networks
    • Demeulemeester, E., 1995, Minimizing Resource Availability Costs in Time-Limited Project Networks, Management Science, 41(10): 1590-1598.
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1590-1598
    • Demeulemeester, E.1
  • 8
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester E. et Herroelen, W. S., Demeulemeester, 1992, A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem, Management Science, 38(12): 1803-1818.
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.S.2
  • 12
    • 0013124139 scopus 로고
    • Project scheduling for multiple objectives
    • Dean, B.V., ed., North-Holland, Amsterdam: Elsevier Science
    • Lee, S.M. et Olson, D.L., 1985, Project Scheduling for Multiple Objectives. Dean, B.V., ed., Project Management: Methods and Studies. North-Holland, Amsterdam: Elsevier Science, pp. 43-64.
    • (1985) Project Management: Methods and Studies , pp. 43-64
    • Lee, S.M.1    Olson, D.L.2
  • 13
    • 0024749283 scopus 로고
    • Multiple projects-multiple resources constrained scheduling: A multiobjective analysis
    • Mohanty R.P. et Siddiq, M.K., 1989, Multiple Projects-Multiple Resources Constrained Scheduling: A Multiobjective Analysis, Engineering Costs and Production Economics, 18: 83-92.
    • (1989) Engineering Costs and Production Economics , vol.18 , pp. 83-92
    • Mohanty, R.P.1    Siddiq, M.K.2
  • 14
    • 0021161421 scopus 로고
    • Minimizing cost of resource requirements in project networks subject to a fixed completion time
    • Möhring, R.H., 1984, Minimizing Cost of Resource Requirements in Project Networks Subject to a Fixed Completion Time, Operations Research, 32(1): 89-120.
    • (1984) Operations Research , vol.32 , Issue.1 , pp. 89-120
    • Möhring, R.H.1
  • 15
    • 0030830501 scopus 로고    scopus 로고
    • Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs
    • Nudtasomboon, N. et Randhawa, S.U., 1997, Resource-Constrained Project Scheduling with Renewable and Non-Renewable Resources and Time-Resource Tradeoffs, Computers and Industrial Engineering, 22(1):227-242.
    • (1997) Computers and Industrial Engineering , vol.22 , Issue.1 , pp. 227-242
    • Nudtasomboon, N.1    Randhawa, S.U.2
  • 16
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J.H., 1984, A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem, Management Science, 30(7): 854-867.
    • (1984) Management Science , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 18
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource trade-offs: The nonpreemptive case
    • Talbot F.B., 1982, Resource-Constrained Project Scheduling with Time-Resource Trade-offs: The NonPreemptive case, Management Science, 28(10): 1197-1210.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1197-1210
    • Talbot, F.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.