-
2
-
-
0010912036
-
A Scheduling Problem Op- timisation Solved with Constraint Logic Programming
-
Baptiste, P., Legeard, B., Manier, M.A., Varnier, C.: A Scheduling Problem Op- timisation Solved with Constraint Logic Programming. Proc. of the PACT Conf. (1994) 47-66
-
(1994)
Proc. Of the PACT Conf
, pp. 47-66
-
-
Baptiste, P.1
Legeard, B.2
Manier, M.A.3
Varnier, C.4
-
4
-
-
78651288064
-
A Constraint Satisfaction Approach to Makespan Scheduling
-
Cheng, C.C., Smith, S.F.: A Constraint Satisfaction Approach to Makespan Scheduling. Proc. of the AIPS Conf. (1996) 45-52
-
(1996)
Proc. Of the AIPS Conf
, pp. 45-52
-
-
Cheng, C.C.1
Smith, S.F.2
-
5
-
-
0002883087
-
The Constraint Logic Programming Language CHIP
-
Dincbas, M., Van Hentenryck, P., Simonis, H., Aggoun, A., Graf, T., Berthier, F.: The Constraint Logic Programming Language CHIP. Proc. of the FGCS Conf. (1988) 693-702
-
(1988)
Proc. Of the FGCS Conf
, pp. 693-702
-
-
Dincbas, M.1
Van Hentenryck, P.2
Simonis, H.3
Aggoun, A.4
Graf, T.5
Berthier, F.6
-
6
-
-
84957392620
-
-
CPLEX. Using the CPLEX Callable Library. CPLEX Optimization, Inc
-
CPLEX. Using the CPLEX Callable Library. CPLEX Optimization, Inc. (1997)
-
(1997)
-
-
-
7
-
-
0025260319
-
Solving Large Combinatorial Prob- lems in Logic Programming
-
Dincbas, M., Simonis, H., Van Hentenryck, P.: Solving Large Combinatorial Prob- lems in Logic Programming. Journal of Logic programming 8 (1995) 75-93
-
(1995)
Journal of Logic Programming
, vol.8
, pp. 75-93
-
-
Dincbas, M.1
Simonis, H.2
Van Hentenryck, P.3
-
8
-
-
0000087196
-
Constraint Logic Program- ming and Integer programming Approaches and their Collaboration in Solving an Assignment Scheduling Problem
-
Darby-Dowman, K., Little, J., Mitra, G., Zaffalon, M.: Constraint Logic Program- ming and Integer programming Approaches and their Collaboration in Solving an Assignment Scheduling Problem. Constraints 1(3) (1997) 245-264
-
(1997)
Constraints
, vol.1
, Issue.3
, pp. 245-264
-
-
Darby-Dowman, K.1
Little, J.2
Mitra, G.3
Zaffalon, M.4
-
9
-
-
84957392622
-
-
ECLiPSe User Manual Version 3.7.1. IC-PARC, Imperial College, London
-
ECLiPSe User Manual Version 3.7.1. IC-PARC, Imperial College, London (1998)
-
(1998)
-
-
-
10
-
-
0028766191
-
Study of a NP-Hard Cyclic Scheduling Problem: The Recurrent Job- Shop
-
Hanen C.: Study of a NP-Hard Cyclic Scheduling Problem: The Recurrent Job- Shop. European Journal of Operations Research 72 (1994) 82-101
-
(1994)
European Journal of Operations Research
, vol.72
, pp. 82-101
-
-
Hanen, C.1
-
12
-
-
84957392624
-
Towards a Closer Integration of Finite Domain Propagation and Simplex-Based Algorithms
-
Florida
-
Hajian, M., Sakkout, H. El, Wallace, M., Richards, E.: Towards a Closer Integration of Finite Domain Propagation and Simplex-Based Algorithms. Proc. of the AI Maths Conf. Florida (1995) www.icparc.ic.ac.uk/papers.html
-
(1995)
Proc. Of the AI Maths Conf
-
-
Hajian, M.1
Sakkout, H.E.2
Wallace, M.3
Richards, E.4
-
14
-
-
0027663342
-
Minimizing the Fleet Size with Dependent Time- Window and Single-Track Constraints
-
Lei, L., Armstrong, R., Gu, S.: Minimizing the Fleet Size with Dependent Time- Window and Single-Track Constraints. Operations Res. Letters 14 (1993) 91-98
-
(1993)
Operations Res. Letters
, vol.14
, pp. 91-98
-
-
Lei, L.1
Armstrong, R.2
Gu, S.3
-
15
-
-
0000402860
-
The Minimum Common-Cycle Algorithm for Cycle Scheduling of Two Material Handling Hoists with Time Window Constraints
-
Lei, L., Wang, T.J.: The Minimum Common-Cycle Algorithm for Cycle Scheduling of Two Material Handling Hoists with Time Window Constraints. Management Science 37(12) (1991) 1629-1639
-
(1991)
Management Science
, vol.37
, Issue.12
, pp. 1629-1639
-
-
Lei, L.1
Wang, T.J.2
-
16
-
-
0028396353
-
Determining Optimal Cyclic Hoist Schedules in a Single Hoist Electroplating Line
-
Lei, L., Wang, T.J.: Determining Optimal Cyclic Hoist Schedules in a Single Hoist Electroplating Line. IEE Transactions 26(2) (1994) 25-33
-
(1994)
IEE Transactions
, vol.26
, Issue.2
, pp. 25-33
-
-
Lei, L.1
Wang, T.J.2
-
18
-
-
0016962332
-
Mathematical Programming Solution of a Hoist Scheduling Problem
-
Phillips, L.W., Unger, P.S.: Mathematical Programming Solution of a Hoist Scheduling Problem. AIIE Transactions 8(2) (1976) 219-255
-
(1976)
AIIE Transactions
, vol.8
, Issue.2
, pp. 219-255
-
-
Phillips, L.W.1
Unger, P.S.2
-
20
-
-
0030232050
-
The Progressive Party Problem: Integer Linear Programming and Constraint Programming Com- pared
-
Smith, B.M., Brailsford, S.C., Hubbard, P.M., Williams, H.P.: The Progressive Party Problem: Integer Linear Programming and Constraint Programming Com- pared. Constraints 1(2) (1996) 119-138
-
(1996)
Constraints
, vol.1
, Issue.2
, pp. 119-138
-
-
Smith, B.M.1
Brailsford, S.C.2
Hubbard, P.M.3
Williams, H.P.4
-
21
-
-
84957392627
-
ECLiPSe Approach to Solver Integration and Cooperation
-
Monterey
-
Schimpf J.: ECLiPSe Approach to Solver Integration and Cooperation. Proc. of the INFORMS CSTS Conf. Monterey (1998)
-
(1998)
Proc. Of the INFORMS CSTS Conf
-
-
Schimpf, J.1
-
22
-
-
0024029390
-
Hoist Scheduling for a PBC Electroplating Facility
-
Sharpio, G.W., Nuttle, H.: Hoist Scheduling for a PBC Electroplating Facility. IIE Transactions 20(2) (1988) 157-167
-
(1988)
IIE Transactions
, vol.20
, Issue.2
, pp. 157-167
-
-
Sharpio, G.W.1
Nuttle, H.2
-
23
-
-
84957392628
-
-
Dash Associates. XPRESS-MP Reference Manual. Dash Associates UK
-
Dash Associates. XPRESS-MP Reference Manual. Dash Associates UK (1993)
-
(1993)
-
-
|