메뉴 건너뛰기




Volumn 35, Issue 1, 1997, Pages 201-223

Control policies for multi-product multi-stage manufacturing systems: An experimental approach

Author keywords

[No Author keywords available]

Indexed keywords

INVENTORY CONTROL; SCHEDULING; STATISTICAL METHODS; STRATEGIC PLANNING;

EID: 0030784108     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497196055     Document Type: Article
Times cited : (29)

References (42)
  • 1
    • 0022060308 scopus 로고
    • Production lines with phase-type operation and repair times and finite buffers
    • Altiok, T., 1985a, Production lines with phase-type operation and repair times and finite buffers. International Journal of Production Research, 23, 389-498.
    • (1985) International Journal of Production Research , vol.23 , pp. 389-498
    • Altiok, T.1
  • 2
    • 0024700721 scopus 로고
    • Approximate analysis of production lines with general processing times and with Unite buffers
    • Altiok, T., 1989, Approximate analysis of production lines with general processing times and with Unite buffers, Operations Research, 37, 601-610.
    • (1989) Operations Research , vol.37 , pp. 601-610
    • Altiok, T.1
  • 3
    • 0024627934 scopus 로고
    • (R, r) Production/Inventory Systems
    • Altiok, T., 1989, (R, r) Production/Inventory Systems, Operations Research, 37, 266-276.
    • (1989) Operations Research , vol.37 , pp. 266-276
    • Altiok, T.1
  • 4
    • 0024622483 scopus 로고
    • Bounds for throughput in production/inventory systems in series with deterministic processing times
    • Altiok, T., and Kao, Z., 1989, Bounds for throughput in production/inventory systems in series with deterministic processing times. IIE Transactions, 21, 82-85.
    • (1989) IIE Transactions , vol.21 , pp. 82-85
    • Altiok, T.1    Kao, Z.2
  • 5
    • 0029288837 scopus 로고
    • Analysis of production lines with general service times and finite buffer: A two-node decomposition approach
    • Altiok, T., and Ranjan, R., 1995, Analysis of production lines with general service times and finite buffer: a two-node decomposition approach. IIE Transactions, 27, 190-200.
    • (1995) IIE Transactions , vol.27 , pp. 190-200
    • Altiok, T.1    Ranjan, R.2
  • 6
    • 0020888108 scopus 로고
    • The allocation of interstage buffer capacities in production lines
    • Altiok, T., and Stidham, S. Jr., 1983, The allocation of interstage buffer capacities in production lines. IIE Transactions, 15, 292-299.
    • (1983) IIE Transactions , vol.15 , pp. 292-299
    • Altiok, T.1    Stidham, S.2
  • 7
    • 0000357181 scopus 로고
    • A model for continuous-review pull policies in serial inventory systems
    • Badinelli, R., 1992, A model for continuous-review pull policies in serial inventory systems. Operations Research, 40, 142-156.
    • (1992) Operations Research , vol.40 , pp. 142-156
    • Badinelli, R.1
  • 10
    • 84954971480 scopus 로고
    • Models of automatic transfer lines with inventory banks
    • Buzacott, J. A., and Hanifin, L. E., 1978, Models of automatic transfer lines with inventory banks. AIIE Transactions, 10(2), 197-207.
    • (1978) AIIE Transactions , vol.10 , Issue.2 , pp. 197-207
    • Buzacott, J.A.1    Hanifin, L.E.2
  • 11
    • 85010630654 scopus 로고
    • Stochastic models of manufacturing systems (Prentice Hall)
    • Buzacott, J. A., and Shanthikumar, J. G., 1993, Stochastic models of manufacturing systems (Prentice Hall).
    • (1993)
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 12
    • 0023018680 scopus 로고
    • On modeling flexible manufacturing systems using closed queueing networks
    • Dallery, Y., 1986, On modeling flexible manufacturing systems using closed queueing networks. Large Scale Systems, 11, 109-119.
    • (1986) Large Scale Systems , vol.11 , pp. 109-119
    • Dallery, Y.1
  • 13
    • 0024070564 scopus 로고
    • An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
    • Dallery, Y., David, R., and Xie, X., 1988a, An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20, 280-283.
    • (1988) IIE Transactions , vol.20 , pp. 280-283
    • Dallery, Y.1    David, R.2    Xie, X.3
  • 14
    • 3342887351 scopus 로고
    • Approximate analysis of transfer lines with unreliable machines and nite buffers
    • (in press)
    • Dallery, Y., David, R., and Xie, X., 1988b, Approximate analysis of transfer lines with unreliable machines and nite buffers. IEEE Transactions on Automatic Control (in press).
    • (1988) IEEE Transactions on Automatic Control
    • Dallery, Y.1    David, R.2    Xie, X.3
  • 15
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery, Y., and Gershwin, S., 1992, Manufacturing flow line systems: a review of models and analytical results. Queueing Systems, 12, 3-94.
    • (1992) Queueing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.2
  • 19
    • 0019058488 scopus 로고
    • A one-product production/inventory problem under continuous review policy
    • Gavish, B., and Graves, S. C., 1980, A one-product production/inventory problem under continuous review policy. Operations Research, 28, 1228-1236.
    • (1980) Operations Research , vol.28 , pp. 1228-1236
    • Gavish, B.1    Graves, S.C.2
  • 20
    • 0019704140 scopus 로고
    • Production/inventory systems with a stochastic production rate under a continuous review policy
    • Gavish, B., and Graves, S. C., 1981, Production/inventory systems with a stochastic production rate under a continuous review policy. Computers and Operations Research, 8, 169-183.
    • (1981) Computers and Operations Research , vol.8 , pp. 169-183
    • Gavish, B.1    Graves, S.C.2
  • 21
    • 0019544056 scopus 로고
    • Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers
    • Gershwin, S. B., and Berman, O., 1981, Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers. IIE Transactions, 13, 2-11.
    • (1981) IIE Transactions , vol.13 , pp. 2-11
    • Gershwin, S.B.1    Berman, O.2
  • 22
    • 0020721475 scopus 로고
    • Modelling and analysis of two- and three-stage transfer lines with unreliable machines and finite buffers
    • Gershwin, S. B., and Shick, I. C., 1983, Modelling and analysis of two- and three-stage transfer lines with unreliable machines and finite buffers. Operations Research, 31, 350-380.
    • (1983) Operations Research , vol.31 , pp. 350-380
    • Gershwin, S.B.1    Shick, I.C.2
  • 24
    • 0023416254 scopus 로고
    • An approximate model of multi-stage automatic transfer lines with possible scrapping of workpieces
    • Jafari, M., and Shanthikumar, J. G., 1987a, An approximate model of multi-stage automatic transfer lines with possible scrapping of workpieces. IIE Transactions, 19, 252-265.
    • (1987) IIE Transactions , vol.19 , pp. 252-265
    • Jafari, M.1    Shanthikumar, J.G.2
  • 25
    • 0023532718 scopus 로고
    • Exact and approximate solutions to two-stage transfer lines with general uptime and downtime distributions
    • Jafari, M., and Shanthikumar, J. G., 1987b, Exact and approximate solutions to two-stage transfer lines with general uptime and downtime distributions. IIE Transactions, 19, 412-420.
    • (1987) IIE Transactions , vol.19 , pp. 412-420
    • Jafari, M.1    Shanthikumar, J.G.2
  • 26
    • 85010517938 scopus 로고
    • Graduate School of Management
    • University of Rochester, Rochester, NY
    • Karmarkar, U., and Kekre, S., 1987, Batching policy in kanban systems. Graduate School of Management, University of Rochester, Rochester, NY.
    • (1987) Batching Policy in Kanban Systems.
    • Karmarkar, U.1    Kekre, S.2
  • 27
    • 0022062163 scopus 로고
    • Just-in time manufacturing systems: A periodic pull system
    • Kim, T. M., 1985, Just-in time manufacturing systems: a periodic pull system. International Journal of Production Research, 23, 553-562.
    • (1985) International Journal of Production Research , vol.23 , pp. 553-562
    • Kim, T.M.1
  • 28
    • 84952179325 scopus 로고
    • Design and analysis of pull systems, a method of multistage production control
    • Kimura, O., and Terada, H., 1981, Design and analysis of pull systems, a method of multistage production control. International Journal of Production Research, 19, 241-253.
    • (1981) International Journal of Production Research , vol.19 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 29
    • 0025564738 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines I
    • Mitra, D., and Mitrani, I., 1990, Analysis of a kanban discipline for cell coordination in production lines I. Management Science, 36, 1548-1566.
    • (1990) Management Science , vol.36 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 30
    • 0026223819 scopus 로고
    • Analysis of a kanban discipline for cell coordination on production lines II: Stochastic demands
    • Mitra, D., and Mitrani, I., 1991, Analysis of a kanban discipline for cell coordination on production lines II: stochastic demands. Operations Research, 39, 807-823.
    • (1991) Operations Research , vol.39 , pp. 807-823
    • Mitra, D.1    Mitrani, I.2
  • 32
    • 3342955019 scopus 로고
    • Approximate analysis of multi-class tandem queueing networks with coxian parameters and finite buffers
    • October, Edinburgh
    • Onvural, R. O., and Perros, H. G., 1990, Approximate analysis of multi-class tandem queueing networks with coxian parameters and finite buffers. Proceedings of Performance 90, October, Edinburgh.
    • (1990) Proceedings of Performance 90
    • Onvural, R.O.1    Perros, H.G.2
  • 34
    • 0020826278 scopus 로고
    • An algorithmic solution of two-stage transfer lines with possible scrapping of units
    • Shanthikumar, J. G., and Tien, C. C., 1983, An algorithmic solution of two-stage transfer lines with possible scrapping of units. Management Science, 29, 1069-1086.
    • (1983) Management Science , vol.29 , pp. 1069-1086
    • Shanthikumar, J.G.1    Tien, C.C.2
  • 35
    • 0027592812 scopus 로고
    • Two-stage, multi-product production/inventory systems
    • Shiue, G. A., and Altiok, T., 1993, Two-stage, multi-product production/inventory systems. Performance Evaluation, 17, 225-232.
    • (1993) Performance Evaluation , vol.17 , pp. 225-232
    • Shiue, G.A.1    Altiok, T.2
  • 38
    • 3342913329 scopus 로고
    • University of Illinois, Department of Industrial Engineering and Management Science, Technical Report
    • Spearman, m. L., and Zazanis, M. A., 1988, Push and pull production systems: issues and comparisons, University of Illinois, Department of Industrial Engineering and Management Science, Technical Report, pp. 88-94.
    • (1988) Push and Pull Production Systems: Issues and Comparisons , pp. 88-94
    • Spearman, M.L.1    Zazanis, M.A.2
  • 39
    • 0018986640 scopus 로고
    • Analysis of production ordering quantities and inventory variations in a multi-stage production ordering system
    • Tabe, t., Muramatsu, R., and Tanaka, Y., 1980, Analysis of production ordering quantities and inventory variations in a multi-stage production ordering system. International Journal of Production Research, 18, 245-257.
    • (1980) International Journal of Production Research , vol.18 , pp. 245-257
    • Tabe, T.1    Muramatsu, R.2    Tanaka, Y.3
  • 40
    • 0027696153 scopus 로고
    • Structural properties and a heuristic for kanban-controlled serial lines
    • Tayur, S. R., 1993, Structural properties and a heuristic for kanban-controlled serial lines. Management Science, 39(11).
    • (1993) Management Science , vol.39 , Issue.11
    • Tayur, S.R.1
  • 42
    • 0023208935 scopus 로고    scopus 로고
    • Modeling a class of flexible manufacturing systems with reversible routing
    • Yao, D. D., and Buzacott, J. A., Modeling a class of flexible manufacturing systems with reversible routing. Operations Research, 35, 82-93.
    • Operations Research , vol.35 , pp. 82-93
    • Yao, D.D.1    Buzacott, J.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.