-
1
-
-
0022060308
-
Production lines with phase-type operation and repair times and finite buffers
-
Altiok, T., 1985a, Production lines with phase-type operation and repair times and finite buffers. International Journal of Production Research, 23, 389-498.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 389-498
-
-
Altiok, T.1
-
2
-
-
0024700721
-
Approximate analysis of production lines with general processing times and with Unite buffers
-
Altiok, T., 1989, Approximate analysis of production lines with general processing times and with Unite buffers, Operations Research, 37, 601-610.
-
(1989)
Operations Research
, vol.37
, pp. 601-610
-
-
Altiok, T.1
-
3
-
-
0024627934
-
(R, r) Production/Inventory Systems
-
Altiok, T., 1989, (R, r) Production/Inventory Systems, Operations Research, 37, 266-276.
-
(1989)
Operations Research
, vol.37
, pp. 266-276
-
-
Altiok, T.1
-
4
-
-
0024622483
-
Bounds for throughput in production/inventory systems in series with deterministic processing times
-
Altiok, T., and Kao, Z., 1989, Bounds for throughput in production/inventory systems in series with deterministic processing times. IIE Transactions, 21, 82-85.
-
(1989)
IIE Transactions
, vol.21
, pp. 82-85
-
-
Altiok, T.1
Kao, Z.2
-
5
-
-
0029288837
-
Analysis of production lines with general service times and finite buffer: A two-node decomposition approach
-
Altiok, T., and Ranjan, R., 1995, Analysis of production lines with general service times and finite buffer: a two-node decomposition approach. IIE Transactions, 27, 190-200.
-
(1995)
IIE Transactions
, vol.27
, pp. 190-200
-
-
Altiok, T.1
Ranjan, R.2
-
6
-
-
0020888108
-
The allocation of interstage buffer capacities in production lines
-
Altiok, T., and Stidham, S. Jr., 1983, The allocation of interstage buffer capacities in production lines. IIE Transactions, 15, 292-299.
-
(1983)
IIE Transactions
, vol.15
, pp. 292-299
-
-
Altiok, T.1
Stidham, S.2
-
7
-
-
0000357181
-
A model for continuous-review pull policies in serial inventory systems
-
Badinelli, R., 1992, A model for continuous-review pull policies in serial inventory systems. Operations Research, 40, 142-156.
-
(1992)
Operations Research
, vol.40
, pp. 142-156
-
-
Badinelli, R.1
-
10
-
-
84954971480
-
Models of automatic transfer lines with inventory banks
-
Buzacott, J. A., and Hanifin, L. E., 1978, Models of automatic transfer lines with inventory banks. AIIE Transactions, 10(2), 197-207.
-
(1978)
AIIE Transactions
, vol.10
, Issue.2
, pp. 197-207
-
-
Buzacott, J.A.1
Hanifin, L.E.2
-
11
-
-
85010630654
-
-
Stochastic models of manufacturing systems (Prentice Hall)
-
Buzacott, J. A., and Shanthikumar, J. G., 1993, Stochastic models of manufacturing systems (Prentice Hall).
-
(1993)
-
-
Buzacott, J.A.1
Shanthikumar, J.G.2
-
12
-
-
0023018680
-
On modeling flexible manufacturing systems using closed queueing networks
-
Dallery, Y., 1986, On modeling flexible manufacturing systems using closed queueing networks. Large Scale Systems, 11, 109-119.
-
(1986)
Large Scale Systems
, vol.11
, pp. 109-119
-
-
Dallery, Y.1
-
13
-
-
0024070564
-
An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers
-
Dallery, Y., David, R., and Xie, X., 1988a, An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20, 280-283.
-
(1988)
IIE Transactions
, vol.20
, pp. 280-283
-
-
Dallery, Y.1
David, R.2
Xie, X.3
-
14
-
-
3342887351
-
Approximate analysis of transfer lines with unreliable machines and nite buffers
-
(in press)
-
Dallery, Y., David, R., and Xie, X., 1988b, Approximate analysis of transfer lines with unreliable machines and nite buffers. IEEE Transactions on Automatic Control (in press).
-
(1988)
IEEE Transactions on Automatic Control
-
-
Dallery, Y.1
David, R.2
Xie, X.3
-
15
-
-
34249834508
-
Manufacturing flow line systems: A review of models and analytical results
-
Dallery, Y., and Gershwin, S., 1992, Manufacturing flow line systems: a review of models and analytical results. Queueing Systems, 12, 3-94.
-
(1992)
Queueing Systems
, vol.12
, pp. 3-94
-
-
Dallery, Y.1
Gershwin, S.2
-
16
-
-
84908803705
-
Pull systems, an analytical approach
-
NCJU, Raleigh, NC
-
Deleersnyder, J., Hodgson, T., and O’Grady, P., 1987, Pull systems, an analytical approach. NCSU-IE Technical Report, No. 87-8, NCJU, Raleigh, NC.
-
(1987)
NCSU-IE Technical Report
, pp. 87-88
-
-
Deleersnyder, J.1
Hodgson, T.2
O’grady, P.3
-
17
-
-
0000099070
-
A unified modelling of kanban systems using petri nets
-
Di Mascolo, M., Frein, Y., Dallery, Y., and David, R., 1991, A unified modelling of kanban systems using petri nets. International Journal of Flexible Manufacturing Systems, 3, 275-307.
-
(1991)
International Journal of Flexible Manufacturing Systems
, vol.3
, pp. 275-307
-
-
Di Mascolo, M.1
Frein, Y.2
Dallery, Y.3
David, R.4
-
18
-
-
0004609640
-
-
(Saint Martin d’Heres, France: Laboratoire d’Automatique de Grenoble)
-
Di Mascolo, M., Frein, Y., Baynat, B., and Dallery, Y., 1992, Queueing network modeling and analysis of generalized kanban systems. (Saint Martin d’Heres, France: Laboratoire d’Automatique de Grenoble).
-
(1992)
Queueing Network Modeling and Analysis of Generalized Kanban Systems
-
-
Di Mascolo, M.1
Frein, Y.2
Baynat, B.3
Dallery, Y.4
-
19
-
-
0019058488
-
A one-product production/inventory problem under continuous review policy
-
Gavish, B., and Graves, S. C., 1980, A one-product production/inventory problem under continuous review policy. Operations Research, 28, 1228-1236.
-
(1980)
Operations Research
, vol.28
, pp. 1228-1236
-
-
Gavish, B.1
Graves, S.C.2
-
20
-
-
0019704140
-
Production/inventory systems with a stochastic production rate under a continuous review policy
-
Gavish, B., and Graves, S. C., 1981, Production/inventory systems with a stochastic production rate under a continuous review policy. Computers and Operations Research, 8, 169-183.
-
(1981)
Computers and Operations Research
, vol.8
, pp. 169-183
-
-
Gavish, B.1
Graves, S.C.2
-
21
-
-
0019544056
-
Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers
-
Gershwin, S. B., and Berman, O., 1981, Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers. IIE Transactions, 13, 2-11.
-
(1981)
IIE Transactions
, vol.13
, pp. 2-11
-
-
Gershwin, S.B.1
Berman, O.2
-
22
-
-
0020721475
-
Modelling and analysis of two- and three-stage transfer lines with unreliable machines and finite buffers
-
Gershwin, S. B., and Shick, I. C., 1983, Modelling and analysis of two- and three-stage transfer lines with unreliable machines and finite buffers. Operations Research, 31, 350-380.
-
(1983)
Operations Research
, vol.31
, pp. 350-380
-
-
Gershwin, S.B.1
Shick, I.C.2
-
23
-
-
0004683740
-
-
PhD dissertation, Department of Aeronautics and Astronautics, MIT, Cambridge, MA
-
Hildebrandt, R. R., 1980, Scheduling flexible machining systems when machines are prone to failures. PhD dissertation, Department of Aeronautics and Astronautics, MIT, Cambridge, MA.
-
(1980)
Scheduling Flexible Machining Systems When Machines are Prone to Failures.
-
-
Hildebrandt, R.R.1
-
24
-
-
0023416254
-
An approximate model of multi-stage automatic transfer lines with possible scrapping of workpieces
-
Jafari, M., and Shanthikumar, J. G., 1987a, An approximate model of multi-stage automatic transfer lines with possible scrapping of workpieces. IIE Transactions, 19, 252-265.
-
(1987)
IIE Transactions
, vol.19
, pp. 252-265
-
-
Jafari, M.1
Shanthikumar, J.G.2
-
25
-
-
0023532718
-
Exact and approximate solutions to two-stage transfer lines with general uptime and downtime distributions
-
Jafari, M., and Shanthikumar, J. G., 1987b, Exact and approximate solutions to two-stage transfer lines with general uptime and downtime distributions. IIE Transactions, 19, 412-420.
-
(1987)
IIE Transactions
, vol.19
, pp. 412-420
-
-
Jafari, M.1
Shanthikumar, J.G.2
-
26
-
-
85010517938
-
Graduate School of Management
-
University of Rochester, Rochester, NY
-
Karmarkar, U., and Kekre, S., 1987, Batching policy in kanban systems. Graduate School of Management, University of Rochester, Rochester, NY.
-
(1987)
Batching Policy in Kanban Systems.
-
-
Karmarkar, U.1
Kekre, S.2
-
27
-
-
0022062163
-
Just-in time manufacturing systems: A periodic pull system
-
Kim, T. M., 1985, Just-in time manufacturing systems: a periodic pull system. International Journal of Production Research, 23, 553-562.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 553-562
-
-
Kim, T.M.1
-
28
-
-
84952179325
-
Design and analysis of pull systems, a method of multistage production control
-
Kimura, O., and Terada, H., 1981, Design and analysis of pull systems, a method of multistage production control. International Journal of Production Research, 19, 241-253.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 241-253
-
-
Kimura, O.1
Terada, H.2
-
29
-
-
0025564738
-
Analysis of a kanban discipline for cell coordination in production lines I
-
Mitra, D., and Mitrani, I., 1990, Analysis of a kanban discipline for cell coordination in production lines I. Management Science, 36, 1548-1566.
-
(1990)
Management Science
, vol.36
, pp. 1548-1566
-
-
Mitra, D.1
Mitrani, I.2
-
30
-
-
0026223819
-
Analysis of a kanban discipline for cell coordination on production lines II: Stochastic demands
-
Mitra, D., and Mitrani, I., 1991, Analysis of a kanban discipline for cell coordination on production lines II: stochastic demands. Operations Research, 39, 807-823.
-
(1991)
Operations Research
, vol.39
, pp. 807-823
-
-
Mitra, D.1
Mitrani, I.2
-
32
-
-
3342955019
-
Approximate analysis of multi-class tandem queueing networks with coxian parameters and finite buffers
-
October, Edinburgh
-
Onvural, R. O., and Perros, H. G., 1990, Approximate analysis of multi-class tandem queueing networks with coxian parameters and finite buffers. Proceedings of Performance 90, October, Edinburgh.
-
(1990)
Proceedings of Performance 90
-
-
Onvural, R.O.1
Perros, H.G.2
-
33
-
-
3343001438
-
-
Department of Decision Sciences, The Wharton School, University of Pennsylvania, Philadelphia, PA
-
Pyke, D. F., and Cohen, M. A., 1987, Modeling integrated production-distribution systems I: analytical models. Department of Decision Sciences, The Wharton School, University of Pennsylvania, Philadelphia, PA.
-
(1987)
Modeling Integrated Production-Distribution Systems I: Analytical Models.
-
-
Pyke, D.F.1
Cohen, M.A.2
-
34
-
-
0020826278
-
An algorithmic solution of two-stage transfer lines with possible scrapping of units
-
Shanthikumar, J. G., and Tien, C. C., 1983, An algorithmic solution of two-stage transfer lines with possible scrapping of units. Management Science, 29, 1069-1086.
-
(1983)
Management Science
, vol.29
, pp. 1069-1086
-
-
Shanthikumar, J.G.1
Tien, C.C.2
-
35
-
-
0027592812
-
Two-stage, multi-product production/inventory systems
-
Shiue, G. A., and Altiok, T., 1993, Two-stage, multi-product production/inventory systems. Performance Evaluation, 17, 225-232.
-
(1993)
Performance Evaluation
, vol.17
, pp. 225-232
-
-
Shiue, G.A.1
Altiok, T.2
-
36
-
-
3342929007
-
-
AT&T Engineering Research Center, Princeton, NJ
-
So, K. C., and Pinault, S. C., 1987, Allocating buffer storages in a pull system. AT&T Engineering Research Center, Princeton, NJ.
-
(1987)
Allocating Buffer Storages in a Pull System.
-
-
So, K.C.1
Pinault, S.C.2
-
37
-
-
0025430443
-
CONWIP: A pull alternative to kanban
-
Spearman, M. L., Woodruff, D. L., and Hopp, W. J., 1990, CONWIP: a pull alternative to kanban. International Journal of Production Research, 28, 879-894.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
38
-
-
3342913329
-
-
University of Illinois, Department of Industrial Engineering and Management Science, Technical Report
-
Spearman, m. L., and Zazanis, M. A., 1988, Push and pull production systems: issues and comparisons, University of Illinois, Department of Industrial Engineering and Management Science, Technical Report, pp. 88-94.
-
(1988)
Push and Pull Production Systems: Issues and Comparisons
, pp. 88-94
-
-
Spearman, M.L.1
Zazanis, M.A.2
-
39
-
-
0018986640
-
Analysis of production ordering quantities and inventory variations in a multi-stage production ordering system
-
Tabe, t., Muramatsu, R., and Tanaka, Y., 1980, Analysis of production ordering quantities and inventory variations in a multi-stage production ordering system. International Journal of Production Research, 18, 245-257.
-
(1980)
International Journal of Production Research
, vol.18
, pp. 245-257
-
-
Tabe, T.1
Muramatsu, R.2
Tanaka, Y.3
-
40
-
-
0027696153
-
Structural properties and a heuristic for kanban-controlled serial lines
-
Tayur, S. R., 1993, Structural properties and a heuristic for kanban-controlled serial lines. Management Science, 39(11).
-
(1993)
Management Science
, vol.39
, Issue.11
-
-
Tayur, S.R.1
-
41
-
-
0004598497
-
-
Working paper, Sophia u niversity, Tokyo, Japan
-
Yamashita, H., Nagasaka, H., Nakagawa, H., and Suzuki, S., 1988, Modeling and analysis of production line operated according to demand. Working paper, Sophia u niversity, Tokyo, Japan.
-
(1988)
Modeling and Analysis of Production Line Operated according to Demand.
-
-
Yamashita, H.1
Nagasaka, H.2
Nakagawa, H.3
Suzuki, S.4
-
42
-
-
0023208935
-
Modeling a class of flexible manufacturing systems with reversible routing
-
Yao, D. D., and Buzacott, J. A., Modeling a class of flexible manufacturing systems with reversible routing. Operations Research, 35, 82-93.
-
Operations Research
, vol.35
, pp. 82-93
-
-
Yao, D.D.1
Buzacott, J.A.2
|