-
1
-
-
0031189107
-
Rescheduling job shops under random disruptions
-
ABUMAIZAR, R. J. and SVETSKA, J. A., 1997, Rescheduling job shops under random disruptions. International Journal of Production Research, 35(7), 2065-2082.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.7
, pp. 2065-2082
-
-
Abumaizar, R.J.1
Svetska, J.A.2
-
2
-
-
0025751859
-
A distributed approach to job scheduling in a flexible manufacturing system
-
AHLUWALIA, R. S. and JI, P., 1990, A distributed approach to job scheduling in a flexible manufacturing system. Computers and Industrial Engineering, 20(1), 95-103.
-
(1990)
Computers and Industrial Engineering
, vol.20
, Issue.1
, pp. 95-103
-
-
Ahluwalia, R.S.1
Ji, P.2
-
3
-
-
0000229534
-
Matchup scheduling with multiple resources, release dates and disruptions
-
BEAN, J. C., BIRGE, J. R., MITTENTHAL, J. and NOON, C. E., 1991, Matchup scheduling with multiple resources, release dates and disruptions. Operations Research, 39(3), 470-481.
-
(1991)
Operations Research
, vol.39
, Issue.3
, pp. 470-481
-
-
Bean, J.C.1
Birge, J.R.2
Mittenthal, J.3
Noon, C.E.4
-
4
-
-
0031248431
-
An approach to developing multi-level fractional factorial designs
-
BINGHAM, T. C., 1997, An approach to developing multi-level fractional factorial designs. Journal of Quality Technology, 29(4), 370-380.
-
(1997)
Journal of Quality Technology
, vol.29
, Issue.4
, pp. 370-380
-
-
Bingham, T.C.1
-
5
-
-
0030688136
-
Function modules demanded for production control in distributed manufacturing systems
-
CHANG, J. W., CHIOU, S. S. and LUH, Y. P., 1997, Function modules demanded for production control in distributed manufacturing systems. International Journal of Advanced Manufacturing Technology, 13(6), 434-442.
-
(1997)
International Journal of Advanced Manufacturing Technology
, vol.13
, Issue.6
, pp. 434-442
-
-
Chang, J.W.1
Chiou, S.S.2
Luh, Y.P.3
-
7
-
-
0000250053
-
Dynamic control of flexible manufacturing systems
-
DOLINSKA, M. and BESANT, C. B., 1995, Dynamic control of flexible manufacturing systems. International Journal of Advanced Manufacturing Technology, 10, 131-138.
-
(1995)
International Journal of Advanced Manufacturing Technology
, vol.10
, pp. 131-138
-
-
Dolinska, M.1
Besant, C.B.2
-
8
-
-
0025555793
-
Reacting to scheduling exceptions in FMS environments
-
DUTTA, A., 1990, Reacting to scheduling exceptions in FMS environments. IIE Transactions, 22(4), 300-314.
-
(1990)
IIE Transactions
, vol.22
, Issue.4
, pp. 300-314
-
-
Dutta, A.1
-
9
-
-
0030676526
-
A rolling horizon job shop rescheduling strategy in the dynamic environment
-
FANG, J. and XI, Y., 1997, A rolling horizon job shop rescheduling strategy in the dynamic environment. International Journal of Advanced Manufacturing Technology, 13(3), 227-232.
-
(1997)
International Journal of Advanced Manufacturing Technology
, vol.13
, Issue.3
, pp. 227-232
-
-
Fang, J.1
Xi, Y.2
-
10
-
-
0031360240
-
Selective rerouting using simulated steady state system data
-
HARMONOSKY, C. M., FARR, R. H. and NI, M. C., 1997, Selective rerouting using simulated steady state system data. Proceedings of the 1997 Winter Simulation Conference, 1293-1298.
-
(1997)
Proceedings of the 1997 Winter Simulation Conference
, pp. 1293-1298
-
-
Harmonosky, C.M.1
Farr, R.H.2
Ni, M.C.3
-
12
-
-
0030786875
-
Production scheduling/rescheduling in flexible manufacturing
-
JAIN, A. K. and ELMARAGHY, H. A., 1997, Production scheduling/rescheduling in flexible manufacturing. International Journal of Production Research, 35(1), 281-309.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.1
, pp. 281-309
-
-
Jain, A.K.1
Elmaraghy, H.A.2
-
13
-
-
0028594405
-
Simulation-based real-time scheduling in a flexible manufacturing system
-
KIM, M. H. and KIM, Y. D., 1994, Simulation-based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing Systems, 13(2), 85-93.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.2
, pp. 85-93
-
-
Kim, M.H.1
Kim, Y.D.2
-
14
-
-
0020915621
-
An algorithm for the computer control of a flexible manufacturing system
-
KIMEMIA, J. and GERSHWIN, S. B., 1983, An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15(4), 353-362.
-
(1983)
IIE Transactions
, vol.15
, Issue.4
, pp. 353-362
-
-
Kimemia, J.1
Gershwin, S.B.2
-
15
-
-
0035922494
-
Routing-based reactive scheduling policies for machine failures in dynamic job shops
-
KUTANOGLU, E. and SABUNCUOGLU, I., 2001, Routing-based reactive scheduling policies for machine failures in dynamic job shops. International Journal of Production Research, 39(14), 3141-3158.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.14
, pp. 3141-3158
-
-
Kutanoglu, E.1
Sabuncuoglu, I.2
-
16
-
-
0027641665
-
A heuristic rescheduling algorithm for computer-based production scheduling systems
-
LI, R. K., SHYU, Y. T. and ADIGA, S., 1993, A heuristic rescheduling algorithm for computer-based production scheduling systems. International Journal of Production Research, 31(8), 1815-1826.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.8
, pp. 1815-1826
-
-
Li, R.K.1
Shyu, Y.T.2
Adiga, S.3
-
17
-
-
0024914674
-
Hierarchical System for dynamically solving planning and scheduling problem in a flexible manufacturing system
-
LIU, P. S. and Fu, L. C., 1989, Hierarchical System for dynamically solving planning and scheduling problem in a flexible manufacturing system. Proceedings of the 1989 IEEE International Conference on Systems, Man and Cybernetics, 1, pp. 77-82.
-
(1989)
Proceedings of the 1989 IEEE International Conference on Systems, Man and Cybernetics
, vol.1
, pp. 77-82
-
-
Liu, P.S.1
Fu, L.C.2
-
18
-
-
0023978351
-
Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines
-
MAIMON, O. Z. and GERSHWIN, S. B., 1988, Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines. Operations Research, 36(2), 279-292.
-
(1988)
Operations Research
, vol.36
, Issue.2
, pp. 279-292
-
-
Maimon, O.Z.1
Gershwin, S.B.2
-
19
-
-
0027625187
-
Sequencing, dispatching and switching in a dynamic manufacturing environment
-
MATSUURA, H., TSUBONE, H. and KANEZASHI, M., 1993, Sequencing, dispatching and switching in a dynamic manufacturing environment. International Journal of Production Research, 31(7), 1671-1688.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.7
, pp. 1671-1688
-
-
Matsuura, H.1
Tsubone, H.2
Kanezashi, M.3
-
23
-
-
0031198746
-
Adaptive scheduling in dynamic flexible manufacturing systems
-
PARK, S. C., RAMAN, N. and SHAW, M. J., 1997, Adaptive scheduling in dynamic flexible manufacturing systems. IEEE Transactions on Robotics and Automation, 13(4), 486-502.
-
(1997)
IEEE Transactions on Robotics and Automation
, vol.13
, Issue.4
, pp. 486-502
-
-
Park, S.C.1
Raman, N.2
Shaw, M.J.3
-
24
-
-
0032311540
-
Real-time control and scheduling of flexible manufacturing systems: An ordinal optimization based approach
-
PENG, C. and CHEN, F. F., 1998, Real-time control and scheduling of flexible manufacturing systems: an ordinal optimization based approach. International Journal of Advanced Manufacturing Technology, 14(10), 775-786.
-
(1998)
International Journal of Advanced Manufacturing Technology
, vol.14
, Issue.10
, pp. 775-786
-
-
Peng, C.1
Chen, F.F.2
-
25
-
-
0025262878
-
Multi-criteria operational control rules in flexible manufacturing systems (FMSs)
-
RO, I. K. and KIM, J. I., 1990, Multi-criteria operational control rules in flexible manufacturing systems (FMSs). International Journal of Production Research, 28(1), 47-63.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.1
, pp. 47-63
-
-
Ro, I.K.1
Kim, J.I.2
-
26
-
-
0034326104
-
Analysis of reactive scheduling problems in a job shop environment
-
SABUNCUOGLU, I. and BAYIZ, M., 2000, Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research, 126, 567-586.
-
(2000)
European Journal of Operational Research
, vol.126
, pp. 567-586
-
-
Sabuncuoglu, I.1
Bayiz, M.2
-
27
-
-
0028707551
-
Hierarchical and dynamic production control in flexible manufacturing systems
-
TAWEGOUM, R., CASTELAIN, E. and GENTINA, J. C., 1994, Hierarchical and dynamic production control in flexible manufacturing systems. Robotics and Computer-Integrated Manufacturing, 11(4), 327-334.
-
(1994)
Robotics and Computer-integrated Manufacturing
, vol.11
, Issue.4
, pp. 327-334
-
-
Tawegoum, R.1
Castelain, E.2
Gentina, J.C.3
-
28
-
-
0031118685
-
Evaluation of alternate routing policies in scheduling a job-shop type FMS
-
TUNALI, S., 1997, Evaluation of alternate routing policies in scheduling a job-shop type FMS. Computers and Industrial Engineering, 32(2), 234-250.
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.2
, pp. 234-250
-
-
Tunali, S.1
-
29
-
-
0027202974
-
Intelligent disruption recovery for decentralized manufacturing systems
-
TSUKADA, T. K. and SHIN, K. G., 1993, Intelligent disruption recovery for decentralized manufacturing systems. Proceedings of the 1993 IEEE International Conference on Robotics and Automation, 1, pp. 852-857.
-
(1993)
Proceedings of the 1993 IEEE International Conference on Robotics and Automation
, vol.1
, pp. 852-857
-
-
Tsukada, T.K.1
Shin, K.G.2
-
30
-
-
0030125709
-
PRIAM: Polite rescheduler for intelligent automated manufacturing
-
TSUKADA, T. K. and SHIN, K. G., 1996, PRIAM: polite rescheduler for intelligent automated manufacturing. IEEE Transactions on Robotics and Automation, 12(2), 235-245.
-
(1996)
IEEE Transactions on Robotics and Automation
, vol.12
, Issue.2
, pp. 235-245
-
-
Tsukada, T.K.1
Shin, K.G.2
-
31
-
-
0029272659
-
Decision learning about production control as machines break down in a flexible manufacturing system
-
WANG, K. S., HSIA, H. W. and ZHUANG, Z. D., 1995, Decision learning about production control as machines break down in a flexible manufacturing system. The International Journal of Flexible Manufacturing Systems, 7, 73-92.
-
(1995)
The International Journal of Flexible Manufacturing Systems
, vol.7
, pp. 73-92
-
-
Wang, K.S.1
Hsia, H.W.2
Zhuang, Z.D.3
-
32
-
-
0022097890
-
Scheduling/rescheduling in the manufacturing operating system environment
-
YAMAMOTO, M. and NOF, S. Y., 1985, Scheduling/rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23(4), 705-722.
-
(1985)
International Journal of Production Research
, vol.23
, Issue.4
, pp. 705-722
-
-
Yamamoto, M.1
Nof, S.Y.2
-
33
-
-
0031079410
-
Robust deterministic scheduling in stochastic environments
-
YELLIG, E. J. and MACKULAK, G. T., 1997, Robust deterministic scheduling in stochastic environments. Computer Integrated Manufacturing System Research, 35(2), 369-379.
-
(1997)
Computer Integrated Manufacturing System Research
, vol.35
, Issue.2
, pp. 369-379
-
-
Yellig, E.J.1
Mackulak, G.T.2
-
34
-
-
0026835693
-
An algorithm for dynamic routing in FMS under unpredicted failure
-
YOUNIS, M. A. and MAHMOUD, M. S., 1992, An algorithm for dynamic routing in FMS under unpredicted failure. Applied Mathematical Modeling, 16, 141-147.
-
(1992)
Applied Mathematical Modeling
, vol.16
, pp. 141-147
-
-
Younis, M.A.1
Mahmoud, M.S.2
|