-
2
-
-
0000229534
-
Matchup scheduling, with multiple resources, release dates and disruptions
-
May-June
-
J. C. Bean et al., "Matchup scheduling, with multiple resources, release dates and disruptions," Operations Res., vol. 39, no. 3, pp. 470-483, May-June 1991.
-
(1991)
Operations Res.
, vol.39
, Issue.3
, pp. 470-483
-
-
Bean, J.C.1
-
3
-
-
0020013653
-
A state-of-the-art survey of dispatch rules for manufacturing job shop operations
-
J. H. Blackstone, D. T. Phillips, and G. L. Hogg, "A state-of-the-art survey of dispatch rules for manufacturing job shop operations," Int. J. Prod. Res., vol. 20, no. 1, pp. 27-45, 1982.
-
(1982)
Int. J. Prod. Res.
, vol.20
, Issue.1
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
4
-
-
0002233047
-
An analysis of problems and research in DAI
-
A. H. Bond and L. Gasser, Eds. San Matco, CA: Morgan Kaufmann
-
A. H. Bond and L. Gasser, "An analysis of problems and research in DAI," in Readings in Distributed Artificial Intelligence, A. H. Bond and L. Gasser, Eds. San Matco, CA: Morgan Kaufmann, 1988, pp. 3-35.
-
(1988)
Readings in Distributed Artificial Intelligence
, pp. 3-35
-
-
Bond, A.H.1
Gasser, L.2
-
5
-
-
0020504370
-
Negotiation as a metaphor for distributed problem solving
-
R. Davis and R. G. Smith, "Negotiation as a metaphor for distributed problem solving," Artificial Intell., vol. 20, pp. 63-109, 1983.
-
(1983)
Artificial Intell.
, vol.20
, pp. 63-109
-
-
Davis, R.1
Smith, R.G.2
-
6
-
-
38249029818
-
Fault-tolerant hierarchical control of heterogeneous manufacturing system entities
-
N. A. Duffie et al., "Fault-tolerant hierarchical control of heterogeneous manufacturing system entities," J. Manufact. Syst., vol. 7, no. 4, pp. 315-328, 1988.
-
(1988)
J. Manufact. Syst.
, vol.7
, Issue.4
, pp. 315-328
-
-
Duffie, N.A.1
-
7
-
-
0023453236
-
Coherent cooperation among communicating problem solvers
-
Nov.
-
E. H. Durfee, V. R. Lesser, and D. D. Corkill, "Coherent cooperation among communicating problem solvers," IEEE Trans. Comput., vol. C-36, no. 11, pp. 1275-1291, Nov. 1987.
-
(1987)
IEEE Trans. Comput.
, vol.C-36
, Issue.11
, pp. 1275-1291
-
-
Durfee, E.H.1
Lesser, V.R.2
Corkill, D.D.3
-
8
-
-
84982522109
-
ISIS - A knowledge-based system for factory scheduling
-
M. S. Fox and S. F. Smith, "ISIS - A knowledge-based system for factory scheduling," Expert Syst., vol. 1, no. 1, pp. 25-49, 1984.
-
(1984)
Expert Syst.
, vol.1
, Issue.1
, pp. 25-49
-
-
Fox, M.S.1
Smith, S.F.2
-
9
-
-
0004232228
-
-
L. Gasser and M. N. Huhns, Eds., San Mateo, CA: Morgan Kaufmann
-
L. Gasser and M. N. Huhns, Eds., Distributed Artificial Intelligence, vol. 2. San Mateo, CA: Morgan Kaufmann, 1989.
-
(1989)
Distributed Artificial Intelligence
, vol.2
-
-
-
10
-
-
0002514818
-
A proposed hierarchical control model for automated manufacturing systems
-
A. C. Jones and C. R. McClean, "A proposed hierarchical control model for automated manufacturing systems," J. Manufact. Syst., vol. 5, no. 1, pp. 15-25, 1986.
-
(1986)
J. Manufact. Syst.
, vol.5
, Issue.1
, pp. 15-25
-
-
Jones, A.C.1
McClean, C.R.2
-
11
-
-
0027695244
-
Integrating general purpose planners and specialized reasoners: Case study of a hybrid planning architecture
-
Nov.
-
S. Kambhampati et al., "Integrating general purpose planners and specialized reasoners: Case study of a hybrid planning architecture," IEEE Trans. Syst., Man, Cybern., vol. 23, no. 6, pp. 1503-1518, Nov. 1993.
-
(1993)
IEEE Trans. Syst., Man, Cybern.
, vol.23
, Issue.6
, pp. 1503-1518
-
-
Kambhampati, S.1
-
13
-
-
33747600465
-
Effects of heuristics in distributed constraint satisfaction problems
-
Y. Nishibe et al., "Effects of heuristics in distributed constraint satisfaction problems," in Proc. 11th Int. Workshop DAI, 1992, pp. 285-302.
-
(1992)
Proc. 11th Int. Workshop DAI
, pp. 285-302
-
-
Nishibe, Y.1
-
14
-
-
0003387679
-
Viewing scheduling as an opportunistic problem-solving process
-
P. S. Ow and S. F. Smith, "Viewing scheduling as an opportunistic problem-solving process," Ann. Operation Res., vol. 12, pp. 85-108, 1988.
-
(1988)
Ann. Operation Res.
, vol.12
, pp. 85-108
-
-
Ow, P.S.1
Smith, S.F.2
-
16
-
-
0042550014
-
Unsupervised surrogate agents and search bias change in flexible distributed scheduling
-
S. Sen and E. H. Durfee, "Unsupervised surrogate agents and search bias change in flexible distributed scheduling," in Proc. 1st Int. Conf. Multi-Agent Systems, 1995, pp. 336-342.
-
(1995)
Proc. 1st Int. Conf. Multi-Agent Systems
, pp. 336-342
-
-
Sen, S.1
Durfee, E.H.2
-
17
-
-
0002753338
-
OPIS: A methodology and architecture for reactive scheduling
-
M. Zweben and M. S. Fox, Eds. San Mateo, CA: Morgan Kaufmann
-
S. Smith, "OPIS: A methodology and architecture for reactive scheduling,"' in Intelligent Scheduling, M. Zweben and M. S. Fox, Eds. San Mateo, CA: Morgan Kaufmann, 1994, pp. 29-66.
-
(1994)
Intelligent Scheduling
, pp. 29-66
-
-
Smith, S.1
-
18
-
-
0025531941
-
An investigation into distributed constraint-directed factory scheduling
-
K. Sycara et al., "An investigation into distributed constraint-directed factory scheduling," in Proc. IEEE AI Applications, 1990, pp. 94-100.
-
(1990)
Proc. IEEE AI Applications
, pp. 94-100
-
-
Sycara, K.1
-
19
-
-
0028553825
-
Polite rescheduling: Responding to schedule disruptions in a distributed manufacturing system
-
T. K. Tsukada and K. G. Shin, "Polite rescheduling: Responding to schedule disruptions in a distributed manufacturing system," in Proc. 1994 IEEE Int. Conf. Robotics and Automation, 1994, pp. 1986-1991.
-
(1994)
Proc. 1994 IEEE Int. Conf. Robotics and Automation
, pp. 1986-1991
-
-
Tsukada, T.K.1
Shin, K.G.2
-
21
-
-
0002292918
-
Scheduling and rescheduling with iterative repair
-
M. Zweben and M. S. Fox, Eds. San Mateo, CA: Morgan Kaufmann
-
M. Zweben et al., "Scheduling and rescheduling with iterative repair," in Intelligent Scheduling, M. Zweben and M. S. Fox, Eds. San Mateo, CA: Morgan Kaufmann, 1994, pp. 241-255.
-
(1994)
Intelligent Scheduling
, pp. 241-255
-
-
Zweben, M.1
|