메뉴 건너뛰기




Volumn 42, Issue 22, 2004, Pages 4803-4826

Dynamic scheduling of batch servers with compatible product families

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; MACHINING; MANUFACTURE; OPTIMIZATION; PROCESSING; PRODUCT DESIGN;

EID: 9744269103     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540412331270450     Document Type: Article
Times cited : (16)

References (39)
  • 1
    • 0001507294 scopus 로고
    • Batching and scheduling jobs on batch and discrete processors
    • AHMADI, J. H., AHMADI, R. H., DASU, S. and TANG, C. S., 1992, Batching and scheduling jobs on batch and discrete processors. Oper. Res., 39, 750-763.
    • (1992) Oper. Res. , vol.39 , pp. 750-763
    • Ahmadi, J.H.1    Ahmadi, R.H.2    Dasu, S.3    Tang, C.S.4
  • 2
    • 0032202819 scopus 로고    scopus 로고
    • Control of a batch processing machine: A computational approach
    • AVRAMIDIS, A. N., HEALY, K. J. and UZSOY, R., 1998, Control of a batch processing machine: a computational approach. Int. J. Prod. Res., 36, 3167-3181.
    • (1998) Int. J. Prod. Res. , vol.36 , pp. 3167-3181
    • Avramidis, A.N.1    Healy, K.J.2    Uzsoy, R.3
  • 3
    • 0034631287 scopus 로고    scopus 로고
    • Scheduling a batch processing machine with non-identical job sizes
    • AZIZOGLU, M. and WEBSTER, S., 2000, Scheduling a batch processing machine with non-identical job sizes. Int. J. Prod. Res., 38, 2173-2184.
    • (2000) Int. J. Prod. Res. , vol.38 , pp. 2173-2184
    • Azizoglu, M.1    Webster, S.2
  • 4
    • 0033204604 scopus 로고    scopus 로고
    • Order release and product mix coordination in a complex PCB manufacturing line with batch processors
    • BHATNAGAR, R., CHANDRA, P., LOULOU, R. and QIU, J., 1999, Order release and product mix coordination in a complex PCB manufacturing line with batch processors. Int. J. Flex. Manuf. Sys., 11, 327-351.
    • (1999) Int. J. Flex. Manuf. Sys. , vol.11 , pp. 327-351
    • Bhatnagar, R.1    Chandra, P.2    Loulou, R.3    Qiu, J.4
  • 5
    • 0031094753 scopus 로고    scopus 로고
    • Managing batch processors to reduce lead-time in a semi conductor packaging line
    • CHANDRA, P. and GUPTA, S., 1997, Managing batch processors to reduce lead-time in a semi conductor packaging line. Int. J. Prod. Res., 35, 611-633.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 611-633
    • Chandra, P.1    Gupta, S.2
  • 6
    • 0027656856 scopus 로고
    • Minimizing total completion time on batch processing machines
    • CHANDRU, V., LEE, C. Y. and UZSOY, C. Y., 1993a, Minimizing total completion time on batch processing machines. Int. J. Prod. Res., 31, 2097-2121.
    • (1993) Int. J. Prod. Res. , vol.31 , pp. 2097-2121
    • Chandru, V.1    Lee, C.Y.2    Uzsoy, C.Y.3
  • 7
    • 0027560273 scopus 로고
    • Minimizing total completion time on batch processing machines with job families
    • CHANDRU, V., LEE, C. Y. and UZSOY, C. Y., 1993b, Minimizing total completion time on batch processing machines with job families. Oper. Res. Lett., 13, 61-65.
    • (1993) Oper. Res. Lett. , vol.13 , pp. 61-65
    • Chandru, V.1    Lee, C.Y.2    Uzsoy, C.Y.3
  • 10
    • 0001690558 scopus 로고
    • Optimal control of bulk service queues
    • DEB, R. K. and SERFOZO, R. F., 1973, Optimal control of bulk service queues. Adv. App. Prob., 5, 340-361.
    • (1973) Adv. App. Prob. , vol.5 , pp. 340-361
    • Deb, R.K.1    Serfozo, R.F.2
  • 11
    • 0035000239 scopus 로고    scopus 로고
    • The batch loading and scheduling problem
    • DOBSON. G. and NAMBIMADON, R. S., 2001, The batch loading and scheduling problem. Oper. Res., 49, 52-65.
    • (2001) Oper. Res. , vol.49 , pp. 52-65
    • Dobson, G.1    Nambimadon, R.S.2
  • 12
    • 0031514083 scopus 로고    scopus 로고
    • Stochastic scheduling of a batch processing machine with incompatible job families
    • DUENYAS, I. and NEALE, J. J., 1997, Stochastic scheduling of a batch processing machine with incompatible job families. Ann. Oper. Res., 70, 191-220.
    • (1997) Ann. Oper. Res. , vol.70 , pp. 191-220
    • Duenyas, I.1    Neale, J.J.2
  • 13
    • 0036819559 scopus 로고    scopus 로고
    • Work load control in semiconductor industry
    • FOWLER, J. W., HOGG, G. L. and MASON, S. J., 2002, Work load control in semiconductor industry. Prod. Plan. Control, 13, 568-578.
    • (2002) Prod. Plan. Control , vol.13 , pp. 568-578
    • Fowler, J.W.1    Hogg, G.L.2    Mason, S.J.3
  • 14
    • 84952175124 scopus 로고
    • Control of multiproduct bulk service diffusion/oxidation processes
    • FOWLER, J. W., HOGG, G. L. and PHILLIPS, D. T., 1992, Control of multiproduct bulk service diffusion/oxidation processes. IIE Trans., 24, 84-96.
    • (1992) IIE Trans. , vol.24 , pp. 84-96
    • Fowler, J.W.1    Hogg, G.L.2    Phillips, D.T.3
  • 15
    • 0034135518 scopus 로고    scopus 로고
    • Control of multiproduct bulk service diffusion/oxidation processes. Part 2: Multiple servers
    • FOWLER, J. W., HOGG, G. L. and PHILLIPS, D. T., 2000, Control of multiproduct bulk service diffusion/oxidation processes. Part 2: Multiple servers. IIE Trans., 32, 167-176.
    • (2000) IIE Trans. , vol.32 , pp. 167-176
    • Fowler, J.W.1    Hogg, G.L.2    Phillips, D.T.3
  • 17
    • 0023964289 scopus 로고
    • Closed loop job release control for VLSI circuit manufacturing
    • GLASSEY, C. R. and RESENDE, M. G. C., 1988, Closed loop job release control for VLSI circuit manufacturing. IEEE Trans. Semicond. Manuf., 1, 36-46.
    • (1988) IEEE Trans. Semicond. Manuf. , vol.1 , pp. 36-46
    • Glassey, C.R.1    Resende, M.G.C.2
  • 18
    • 0026153052 scopus 로고
    • Dynamic batching heuristic for simultaneous processing
    • GLASSEY, C. R. and WENG, W. W., 1991, Dynamic batching heuristic for simultaneous processing. IEEE Trans. Semicond. Manuf., 4, 77-82.
    • (1991) IEEE Trans. Semicond. Manuf. , vol.4 , pp. 77-82
    • Glassey, C.R.1    Weng, W.W.2
  • 19
    • 0026944363 scopus 로고
    • Control of batch processing systems in semiconductor wafer fabrication facilities
    • GURNANI, H., ANUPINDI, R. and AKELLA, R., 1992, Control of batch processing systems in semiconductor wafer fabrication facilities. IEEE Trans. Semicond. Manuf., 5, 319-328.
    • (1992) IEEE Trans. Semicond. Manuf. , vol.5 , pp. 319-328
    • Gurnani, H.1    Anupindi, R.2    Akella, R.3
  • 22
    • 38149058172 scopus 로고
    • Efficient scheduling algorithms for a single batch processing machine
    • IKURA, Y. and GIMPLE, M., 1986, Efficient scheduling algorithms for a single batch processing machine. Oper. Res. Lett., 5, 61-65.
    • (1986) Oper. Res. Lett. , vol.5 , pp. 61-65
    • Ikura, Y.1    Gimple, M.2
  • 24
    • 0026898494 scopus 로고
    • Efficient algorithms for scheduling semiconductor burn-in operations
    • LEE, C. Y., UZSOY, R. and MARTIN-VEGA, L. A., 1992, Efficient algorithms for scheduling semiconductor burn-in operations. Oper. Res., 40, 764-775.
    • (1992) Oper. Res. , vol.40 , pp. 764-775
    • Lee, C.Y.1    Uzsoy, R.2    Martin-Vega, L.A.3
  • 25
    • 0000688623 scopus 로고
    • A general class of bulk queues with Poisson input
    • NEUTS, M. F., 1967, A general class of bulk queues with Poisson input. Ann. Math. Stat., 38, 759-770.
    • (1967) Ann. Math. Stat. , vol.38 , pp. 759-770
    • Neuts, M.F.1
  • 26
    • 9744260678 scopus 로고    scopus 로고
    • Capacity management of heat treatment process in a manufacturing environment
    • W. G. Sullivan, M. Ahmad, D. Fichtner, W. Sauer, G. Weigert and T. Zerna (eds) (Oldenbourg, Munich)
    • ODUOZA, C. F., 2002, Capacity management of heat treatment process in a manufacturing environment. In W. G. Sullivan, M. Ahmad, D. Fichtner, W. Sauer, G. Weigert and T. Zerna (eds), Proceedings of the 12th International Conference on Flexible Automation & Intelligent Manufacturing (Oldenbourg, Munich), pp. 878-888.
    • (2002) Proceedings of the 12th International Conference on Flexible Automation & Intelligent Manufacturing , pp. 878-888
    • Oduoza, C.F.1
  • 27
    • 0033895628 scopus 로고    scopus 로고
    • Scheduling with batching: A review
    • POTTS, C. N. and KOVALYOV, M. Y., 2000, Scheduling with batching: a review. Eur. J. Oper. Res., 120, 228-249.
    • (2000) Eur. J. Oper. Res. , vol.120 , pp. 228-249
    • Potts, C.N.1    Kovalyov, M.Y.2
  • 28
    • 0029341463 scopus 로고
    • The use of upstream and downstream information in scheduling semiconductor batch operations
    • ROBINSON, J. K., FOWLER, J. W. and BARD, J. F., 1995, The use of upstream and downstream information in scheduling semiconductor batch operations. Int. J. Prod. Res., 33, 1849-1869.
    • (1995) Int. J. Prod. Res. , vol.33 , pp. 1849-1869
    • Robinson, J.K.1    Fowler, J.W.2    Bard, J.F.3
  • 30
    • 0029387205 scopus 로고
    • Scheduling batch processing machines with incompatible job families
    • UZSOY, R., 1995, Scheduling batch processing machines with incompatible job families. Int. J. Prod. Res., 33, 2685-2708.
    • (1995) Int. J. Prod. Res. , vol.33 , pp. 2685-2708
    • Uzsoy, R.1
  • 31
    • 0028461472 scopus 로고
    • Scheduling of a single batch processing machine with non-identical job sizes
    • UZSOY, R., 1994, Scheduling of a single batch processing machine with non-identical job sizes. Int. J. Prod. Res., 32, 1615-1635.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 1615-1635
    • Uzsoy, R.1
  • 32
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part I: System characteristics, performance evaluation and production planning
    • UZSOY, R., LEE, C. Y. and MARTIN-VEGA, L. A., 1992, A review of production planning and scheduling models in the semiconductor industry, Part I: System characteristics, performance evaluation and production planning. IIE Trans., 24, 47-60.
    • (1992) IIE Trans. , vol.24 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 33
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part II: Shop-floor control
    • UZSOY, R., LEE, C. Y. and MARTIN-VEGA, L. A., 1994, A review of production planning and scheduling models in the semiconductor industry, Part II: Shop-floor control. IIE Trans., 26, 44-55.
    • (1994) IIE Trans. , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 34
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • WEBSTER, S. and BAKER, K. R., 1995, Scheduling groups of jobs on a single machine. Oper. Res., 43, 692-703.
    • (1995) Oper. Res. , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.R.2
  • 35
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • WEIN, L. M., 1988, Scheduling semiconductor wafer fabrication. IEEE Trans. Semicond. Manuf., 1, 115-129.
    • (1988) IEEE Trans. Semicond. Manuf. , vol.1 , pp. 115-129
    • Wein, L.M.1
  • 36
    • 0027648685 scopus 로고
    • An improved methodology for real-time production decisions at batch-process work stations
    • WENG, W. W. and LEACHMAN, R. C., 1993, An improved methodology for real-time production decisions at batch-process work stations. IEEE Trans. Semicond. Manuf., 6, 219-225.
    • (1993) IEEE Trans. Semicond. Manuf. , vol.6 , pp. 219-225
    • Weng, W.W.1    Leachman, R.C.2
  • 38
    • 0031276822 scopus 로고    scopus 로고
    • Dynamic job assignment heuristics for multi-server batch operations - A cost-based approach
    • ZEE, D. J. Van DER, HARTEN, A. VAN and SCHUUR, P. C., 1997, Dynamic job assignment heuristics for multi-server batch operations - a cost-based approach. Int. J. Prod. Res., 35, 3063-3093.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 3063-3093
    • Van Der, Z.D.J.1    Van Harten, A.2    Schuur, P.C.3
  • 39
    • 0035400532 scopus 로고    scopus 로고
    • On-line scheduling of multi-server batch operations
    • ZEE, D. J. VAN DER, HARTEN, A. VAN and SCHUUR, P. C., 2001, On-line scheduling of multi-server batch operations. IIE Trans., 33, 569-586.
    • (2001) IIE Trans. , vol.33 , pp. 569-586
    • Van Der, Z.D.J.1    Van Harten, A.2    Schuur, P.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.