메뉴 건너뛰기




Volumn 10, Issue 1, 1999, Pages 97-106

Implementing new dispatching rules at sgs-thomson microelectronics

Author keywords

Dispatching; Semiconductor Manufacturing; Wafer Fab

Indexed keywords

COMPUTER SIMULATION; CONSTRAINT THEORY; DISTRIBUTION OF GOODS; INTEGRATED CIRCUIT MANUFACTURE; PROCESS CONTROL; SCHEDULING; STRATEGIC PLANNING; VLSI CIRCUITS;

EID: 0032761113     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/095372899233479     Document Type: Article
Times cited : (22)

References (26)
  • 3
    • 0346224099 scopus 로고
    • (SGS-Thomson Microelectronics Internal Publication)
    • cam group, 1991, WorkStream: CAM System; Handbook. (SGS-Thomson Microelectronics Internal Publication).
    • (1991) Workstream: CAM System; Handbook
  • 4
    • 0347485125 scopus 로고    scopus 로고
    • Comparison of different dispatching rules in VLSI semiconductor manufacturing: A simulation approach
    • (24-26, October, Genoa, Italy)
    • Cigolini, R., Perona, M., Pdrtidli, A, Turco, F., and Zambelli, T., 1996, Comparison of different dispatching rules in VLSI semiconductor manufacturing: a simulation approach. In P roceedings of the 8th European Simulation Symposium, (24-26, October, Genoa, Italy), vol. 1, pp. 343-347.
    • (1996) P Roceedings of the 8Th European Simulation Symposium , vol.1 , pp. 343-347
    • Cigolini, R.1    Perona, M.2    Pdrtidli, A.3    Turco, F.4    Zambelli, T.5
  • 6
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, S. C, 1981, A review of production scheduling. Operations Research, 29, 646-675
    • (1981) Operations Research , vol.29 , pp. 646-675
    • Graves, S.C.1
  • 9
    • 0000231669 scopus 로고
    • Scheduling manufacturing systems of reentrant lines
    • David D. Yao (ed.), New York: Springer Verlag
    • Kumar, P. R, 1994, Scheduling manufacturing systems of reentrant lines. In: David D. Yao (ed.) Stochastic M odelling and Analysis of M anufacturing Systems, pp. 325-360 (New York: Springer Verlag).
    • (1994) Stochastic M Odelling and Analysis of M Anufacturing Systems , pp. 325-360
    • Kumar, P.R.1
  • 10
    • 0026898494 scopus 로고
    • Efficient algorithms for scheduling semiconductor burn-in operations
    • Lee, C-Y, Uzsdy, R., and Martin-Vega L. A, 1992, Efficient algorithms for scheduling semiconductor burn-in operations. Operations Research, 40, 764-775
    • (1992) Operations Research , vol.40 , pp. 764-775
    • Lee Uzsdy, C.-Y.R.1    Martin-Vega, L.A.2
  • 11
    • 0029368025 scopus 로고
    • An analysis of dispatching rules in a semiconductor wafer fabrication environment
    • McCutchen, T., and Lee, C.-Y., 1995, An analysis of dispatching rules in a semiconductor wafer fabrication environment. J ournal of Electronics M anufacturing, 5, 165-174.
    • (1995) J Ournal of Electronics M Anufacturing , vol.5 , pp. 165-174
    • Mc Cutchen, T.1    Lee, C.-Y.2
  • 17
    • 0346854634 scopus 로고
    • (SGS-Thomson Microelectronics Internal Publication)
    • Motta, A., 1994c, PooL Top Quality (SGS-Thomson Microelectronics Internal Publication).
    • (1994) Pool Top Quality
    • Motta, A.1
  • 20
    • 0347485130 scopus 로고
    • (New York: McGraw-Hill)
    • Schildt, H., 1989, Turbo c (New York: McGraw-Hill).
    • (1989) Turbo C
    • Schildt, H.1
  • 21
    • 0028461472 scopus 로고
    • Scheduling a single batch processing machine with non-identical job size
    • Uzsdy, R., 1994, Scheduling a single batch processing machine with non-identical job size. International J ournal of Production R esearch. 32, 1615-1635.
    • (1994) International J Ournal of Production R Esearch. , vol.32 , pp. 1615-1635
    • Uzsdy, R.1
  • 22
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
    • Uzsdy, R., Lee, C.-Y, and Martin-Vega, L. A., 1992, A review of production planning and scheduling models in the semiconductor industry. part I: system characteristics, performance evaluation and production planning. ieee T ransactions, 24, 47- 60.
    • (1992) Ieee T Ransactions , vol.24
    • Uzsdy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 23
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part II: Shop-floor control
    • Uzsdy, R., Lee, C.-Y., and Martin-Vega, L. A., 1994, A review of production planning and scheduling models in the semiconductor industry. part II: shop-floor control. IEEE Transactions, 26, 44-55.
    • (1994) IEEE Transactions , vol.26 , pp. 44-55
    • Uzsdy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 26
    • 84889196741 scopus 로고    scopus 로고
    • A new approach to the re-entrant lines scheduling problem in the semiconductor manufacturing
    • Dipartimento di Economia e Produzione, Politecnico di Milano (in Italian)
    • Zambelli, T. A., 1996, A new approach to the re-entrant lines scheduling problem in the semiconductor manufacturing. M aster D egree T hesis. Dipartimento di Economia e Produzione, Politecnico di Milano (in Italian).
    • (1996) M Aster D Egree T Hesis
    • Zambelli, T.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.