메뉴 건너뛰기




Volumn , Issue , 2009, Pages 227-246

Dynamic Capacity Planning and Modeling Its Complexity

Author keywords

Bullwhip Effect; Capacity Planning; Dynamic Capacity; Operational Complexity; Supply Chain

Indexed keywords


EID: 85151496839     PISSN: 18605168     EISSN: 21961735     Source Type: Book Series    
DOI: 10.1007/978-1-84882-067-8_13     Document Type: Chapter
Times cited : (5)

References (34)
  • 1
    • 28444492339 scopus 로고    scopus 로고
    • The “physics” of capacity and backlog management in service and custom manufacturing supply chains
    • Anderson E., Morrice D., Lundeen G., 2005, The “physics” of capacity and backlog management in service and custom manufacturing supply chains. System Dynamics Review 22/3:217–247
    • (2005) System Dynamics Review , vol.22 , Issue.3 , pp. 217-247
    • Anderson, E.1    Morrice, D.2    Lundeen, G.3
  • 4
    • 34547253016 scopus 로고    scopus 로고
    • A control approach to explore capacity scalability scheduling in reconfigurable manufacturing systems
    • Deif A., ElMaraghy W., 2006, A control approach to explore capacity scalability scheduling in reconfigurable manufacturing systems. Journal of Manufacturing Systems 25/1:12–24
    • (2006) Journal of Manufacturing Systems , vol.25 , Issue.1 , pp. 12-24
    • Deif, A.1    Elmaraghy, W.2
  • 6
    • 0032117281 scopus 로고    scopus 로고
    • Complexity in manufacturing systems, part 1: Analysis of static complexity
    • Deshmukh A., Talavage J., Barash M., 1998, Complexity in manufacturing systems, part 1: Analysis of static complexity. IIE Transactions 30:645–655
    • (1998) IIE Transactions , vol.30 , pp. 645-655
    • Deshmukh, A.1    Talavage, J.2    Barash, M.3
  • 7
    • 0037838751 scopus 로고    scopus 로고
    • Control-theoretic analysis of a closed loop PPC system
    • Duffie N., Falu I., 2002, Control-theoretic analysis of a closed loop PPC system. Annals of CIRP 52/1:379–382
    • (2002) Annals of CIRP , vol.52 , Issue.1 , pp. 379-382
    • Duffie, N.1    Falu, I.2
  • 8
    • 85151496523 scopus 로고    scopus 로고
    • A complexity code for manufacturing systems, 2006 ASME Int. Conference on Manufacturing Science & Engineering (MSEC)
    • Ypsilani, MI, USA
    • ElMaraghy H.A., 2006, A complexity code for manufacturing systems, 2006 ASME Int. Conference on Manufacturing Science & Engineering (MSEC), Symposium on Advances in Process & System Planning, Ypsilani, MI, USA
    • (2006) Symposium on Advances in Process & System Planning
    • Elmaraghy, H.A.1
  • 11
    • 0033872695 scopus 로고    scopus 로고
    • Quantifying the bullwhip effect: The impact of forecasting, lead-time and information
    • Frank C., Drezner Z., Ryan JK., Simchi-Levi D., 2000, Quantifying the bullwhip effect: the impact of forecasting, lead-time and information. Management Science 46/3:436–443
    • (2000) Management Science , vol.46 , Issue.3 , pp. 436-443
    • Frank, C.1    Drezner, Z.2    Ryan, J.K.3    Simchi-Levi, D.4
  • 12
    • 85125673144 scopus 로고    scopus 로고
    • The Management of Complexity in Manufacturing. Business Intelligence
    • Frizelle G., 1998, The Management of Complexity in Manufacturing. Business Intelligence, London
    • (1998) London
    • Frizelle, G.1
  • 13
    • 41549128217 scopus 로고    scopus 로고
    • The impact of endogenous demand on push-pull production systems
    • Goncalves P., Hines J., Sterman J., 2005, The impact of endogenous demand on push-pull production systems. System Dynamics Review 22/3:217–247
    • (2005) System Dynamics Review , vol.22 , Issue.3 , pp. 217-247
    • Goncalves, P.1    Hines, J.2    Sterman, J.3
  • 14
    • 0034694481 scopus 로고    scopus 로고
    • Dynamic modeling of surge effect and capacity limitation in supply chains
    • Helo P., 2000, Dynamic modeling of surge effect and capacity limitation in supply chains. International Journal of Production Research 38/17:4521–4533
    • (2000) International Journal of Production Research , vol.38 , Issue.17 , pp. 4521-4533
    • Helo, P.1
  • 16
    • 85151552664 scopus 로고    scopus 로고
    • McGraw Hill
    • Hopp and Spearman, 2002, Factory Physics, McGraw Hill
    • (2002) Factory Physics
  • 17
    • 0039552747 scopus 로고
    • Determining Lead Time for Manufactured Parts in a Job Shop, Computers in Manufacturing, (ed)
    • . pp
    • Hoyt J. 1980, Determining Lead Time for Manufactured Parts in a Job Shop, Computers in Manufacturing, (ed) J.J. Pennsanken. pp 1–12
    • (1980) J.J. Pennsanken , pp. 1-12
    • Hoyt, J.1
  • 18
    • 33644998525 scopus 로고    scopus 로고
    • A general strategic capacity planning model under demand uncertainty
    • Huh W.T., Roundy R.O., Cakanyildirim M., 2006, A general strategic capacity planning model under demand uncertainty. Naval Research Logistics 2:137–150
    • (2006) Naval Research Logistics , Issue.2 , pp. 137-150
    • Huh, W.T.1    Roundy, R.O.2    Cakanyildirim, M.3
  • 20
    • 85151505414 scopus 로고    scopus 로고
    • Backlog control design for a closed loop PPC system
    • Kim J.-H., Duffie N., 2004, Backlog control design for a closed loop PPC system. Annals of CIRP 54/1:456–459
    • (2004) Annals of CIRP , vol.54 , Issue.1 , pp. 456-459
    • Kim, J.-H.1    Duffie, N.2
  • 21
    • 33750061505 scopus 로고    scopus 로고
    • Design and analysis for a closed loop capacity control of a multi workstation production system
    • Kim J.-H., Duffie N., 2005, Design and analysis for a closed loop capacity control of a multi workstation production system. Annals of CIRP 55/1:470–474
    • (2005) Annals of CIRP , vol.55 , Issue.1 , pp. 470-474
    • Kim, J.-H.1    Duffie, N.2
  • 22
    • 0020183161 scopus 로고
    • Operation research and capacity expansion problems: A survey
    • Luss H., 1982, Operation research and capacity expansion problems: A survey. Operation Research 3/5:907–947
    • (1982) Operation Research , vol.3 , Issue.5 , pp. 907-947
    • Luss, H.1
  • 23
    • 0003931321 scopus 로고
    • Investments for capacity expansion, size, location
    • The MIT Press, Cambridge, MA
    • Manne Alan S., 1967, Investments for capacity expansion, size, location, and time-phasing. The MIT Press, Cambridge, MA
    • (1967) And Time-Phasing
    • Manne Alan, S.1
  • 24
    • 0347694396 scopus 로고    scopus 로고
    • Capacity management, investment and hedging: Review and recent developments
    • van Mieghem J., 2003, Capacity management, investment and hedging: Review and recent developments. Manufacturing and Service Operation Management 5/4:269–302
    • (2003) Manufacturing and Service Operation Management , vol.5 , Issue.4 , pp. 269-302
    • van Mieghem, J.1
  • 33
    • 33947220287 scopus 로고    scopus 로고
    • Exploiting the order book for mass customized manufacturing control systems with capacity constrains
    • Wikner J., Naim M., Rudberg M., 2007, Exploiting the order book for mass customized manufacturing control systems with capacity constrains. IEEE Transaction on Engineering Management 54/1:145–155
    • (2007) IEEE Transaction on Engineering Management , vol.54 , Issue.1 , pp. 145-155
    • Wikner, J.1    Naim, M.2    Rudberg, M.3
  • 34
    • 33746964923 scopus 로고    scopus 로고
    • A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains
    • Vlachos D., Georgiadis P., Iakovou E., 2007, A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains. Journal of Computers and Operation Research 34:367–394
    • (2007) Journal of Computers and Operation Research , vol.34 , pp. 367-394
    • Vlachos, D.1    Georgiadis, P.2    Iakovou, E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.