-
4
-
-
85133775397
-
A comprehensive survey of evolutionary-based multi-objective optimization techniques
-
Coello, C. (1999) ‘A comprehensive survey of evolutionary-based multi-objective optimization techniques’, Knowledge and Information Systems, An International Journal, Vol. 1, No. 3, pp.269–308.
-
(1999)
Knowledge and Information Systems, An International Journal
, vol.1
, Issue.3
, pp. 269-308
-
-
Coello, C.1
-
5
-
-
33847710649
-
Investigating optimal capacity scalability scheduling in reconfigurable manufacturing systems
-
Deif, A. and ElMaraghy, W. (2006) ‘Investigating optimal capacity scalability scheduling in reconfigurable manufacturing systems’, International Journal of Advanced Manufacturing Technology, Vol. 32, Nos. 5–6, pp.557–562.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.32
, Issue.5-6
, pp. 557-562
-
-
Deif, A.1
ElMaraghy, W.2
-
6
-
-
0037838751
-
Control-theoretic analysis of a closed loop PPC system
-
Duffie, N. and Falu, I. (2002) ‘Control-theoretic analysis of a closed loop PPC system’, Annals of CIRP, Vol. 52, No. 1, pp.379–382.
-
(2002)
Annals of CIRP
, vol.52
, Issue.1
, pp. 379-382
-
-
Duffie, N.1
Falu, I.2
-
7
-
-
84903608492
-
Flexible and reconfigurable manufacturing systems paradigms
-
ElMaraghy, H. (2006) ‘Flexible and reconfigurable manufacturing systems paradigms’, International Journal of Flexible Manufacturing Systems, Special Issue on Reconfigurable Manufacturing Systems, Vol. 17, No. 4, pp.261–276.
-
(2006)
International Journal of Flexible Manufacturing Systems, Special Issue on Reconfigurable Manufacturing Systems
, vol.17
, Issue.4
, pp. 261-276
-
-
ElMaraghy, H.1
-
9
-
-
0000676360
-
How should you organize manufacturing?
-
Hayes, R.H. and Schmenner, R.W. (1978) ‘How should you organize manufacturing?’, Harvard Business Review, Vol. 56, No. 1, pp.105–118.
-
(1978)
Harvard Business Review
, vol.56
, Issue.1
, pp. 105-118
-
-
Hayes, R.H.1
Schmenner, R.W.2
-
10
-
-
0039552747
-
Determining lead time for manufactured parts in a job shop
-
J.J. Pennsanken (Ed.)
-
Hoyt, J. (1980) ‘Determining lead time for manufactured parts in a job shop’, in J.J. Pennsanken (Ed.) Computers in Manufacturing, pp.1–12.
-
(1980)
Computers in Manufacturing
, pp. 1-12
-
-
Hoyt, J.1
-
11
-
-
3142665499
-
Backlog control design for a closed loop PPC system
-
Kim, J-H. and Duffie, N. (2004) ‘Backlog control design for a closed loop PPC system’, Annals of CIRP, Vol. 53, No. 1, pp.456–459.
-
(2004)
Annals of CIRP
, vol.53
, Issue.1
, pp. 456-459
-
-
Kim, J.-H.1
Duffie, N.2
-
12
-
-
21944434326
-
Design and analysis for a closed loop capacity control of a multi workstation production system
-
Kim, J-H. and Duffie, N. (2005) ‘Design and analysis for a closed loop capacity control of a multi workstation production system’, Annals of the CIRP, Vol. 54, No. 1, pp.470–473.
-
(2005)
Annals of the CIRP
, vol.54
, Issue.1
, pp. 470-473
-
-
Kim, J.-H.1
Duffie, N.2
-
13
-
-
0033340198
-
Reconfigurable manufacturing system
-
Koren, Y., Heisel, U., Jovane, F. and Moriwaki, T. (1999) ‘Reconfigurable manufacturing system’, Annals of CIRP, Keynote paper, Vol. 48, No. 2.
-
(1999)
Annals of CIRP, Keynote paper
, vol.48
, Issue.2
-
-
Koren, Y.1
Heisel, U.2
Jovane, F.3
Moriwaki, T.4
-
14
-
-
0021651469
-
Multicriterion optimization in structural design
-
E. Atrek, R.H. Gallagher, K.M. Ragsdell and O.C. Zienkiewicz (Eds.) John Wiley and Sons
-
Koski, J. (1984) ‘Multicriterion optimization in structural design’, in E. Atrek, R.H. Gallagher, K.M. Ragsdell and O.C. Zienkiewicz (Eds.) New Directions in Optimum Structural Design, John Wiley and Sons, pp.483–503.
-
(1984)
New Directions in Optimum Structural Design
, pp. 483-503
-
-
Koski, J.1
-
15
-
-
0002549571
-
On capacity modeling for production planning with alternative machine types
-
Leachman, R. and Carnon, T. (1992) ‘On capacity modeling for production planning with alternative machine types’, IIE Transactions, Vol. 24, No. 4, pp.62–72.
-
(1992)
IIE Transactions
, vol.24
, Issue.4
, pp. 62-72
-
-
Leachman, R.1
Carnon, T.2
-
16
-
-
0036819808
-
Production capacity modeling of alternative, non-identical, flexible machines
-
Liberopoulos, G. (2002) ‘Production capacity modeling of alternative, non-identical, flexible machines’, International Journal of Flexible Manufacturing System, Vol. 14, pp.345–359.
-
(2002)
International Journal of Flexible Manufacturing System
, vol.14
, pp. 345-359
-
-
Liberopoulos, G.1
-
17
-
-
0020183161
-
Operation research & capacity expansion problems: a survey
-
Luss, H. (1982) ‘Operation research & capacity expansion problems: a survey’, Operation Research, Vol. 30, No. 5, pp.907–947.
-
(1982)
Operation Research
, vol.30
, Issue.5
, pp. 907-947
-
-
Luss, H.1
-
18
-
-
0003931321
-
-
Cambridge, Ma: The MIT Press
-
Manne Alan, S. (1967) Investments for Capacity Expansion, Size, Location, and Time-Phasing, Cambridge, Ma: The MIT Press.
-
(1967)
Investments for Capacity Expansion, Size, Location, and Time-Phasing
-
-
Manne Alan, S.1
-
20
-
-
34547705058
-
Logistic operating curves - a comprehensive method for rating logistic potentials
-
University of Strathclyde Glasgow, 19–22 July
-
Nyhuis, P. (1994) ‘Logistic operating curves - a comprehensive method for rating logistic potentials’, EURO XIII/OR36, University of Strathclyde Glasgow, 19–22 July.
-
(1994)
EURO XIII/OR36
-
-
Nyhuis, P.1
-
21
-
-
0342421985
-
-
[in German], Fort schritt-Berichte VDI, Dusseldorf: VDI, Reihe 20, Nr. 193
-
Petermann, D. (1996) ‘Modellbasierte Produktionsregelung’, [in German], Fort schritt-Berichte VDI, Dusseldorf: VDI, Reihe 20, Nr. 193.
-
(1996)
Modellbasierte Produktionsregelung
-
-
Petermann, D.1
-
22
-
-
0026222211
-
A modified game theory approach to multi-objective optimization
-
Rao, S. and Freiheit, T. (1991) ‘A modified game theory approach to multi-objective optimization’, Journal of Mechanical Design, Vol. 113, pp.286–291.
-
(1991)
Journal of Mechanical Design
, vol.113
, pp. 286-291
-
-
Rao, S.1
Freiheit, T.2
-
23
-
-
33847750938
-
-
Technical Report 1271, School of Operations Research and Industrial Engineering, Cornell University, New York
-
Roundy, R., Zhang, F. and Cakanyildirum, M. (2000) ‘Optimal capacity expansion for multi-product, multi-machine manufacturing systems with stochastic demand’, Technical Report 1271, School of Operations Research and Industrial Engineering, Cornell University, New York.
-
(2000)
Optimal capacity expansion for multi-product, multi-machine manufacturing systems with stochastic demand
-
-
Roundy, R.1
Zhang, F.2
Cakanyildirum, M.3
-
24
-
-
0001412093
-
On the application of servomechanism theory in the study of production control
-
Simon, H. (1952) ‘On the application of servomechanism theory in the study of production control’, Econometrica, Vol. 20, No. 2, pp.247–268.
-
(1952)
Econometrica
, vol.20
, Issue.2
, pp. 247-268
-
-
Simon, H.1
-
25
-
-
0035213037
-
An approach to scalability and line balancing for reconfigurable manufacturing systems
-
Son, S.Y., Olsen, T.L. and Yip-Hoi, D. (2001) ‘An approach to scalability and line balancing for reconfigurable manufacturing systems’, Integrated Manufacturing Systems, Vol. 12, No. 7, pp.500–511.
-
(2001)
Integrated Manufacturing Systems
, vol.12
, Issue.7
, pp. 500-511
-
-
Son, S.Y.1
Olsen, T.L.2
Yip-Hoi, D.3
-
27
-
-
0031238099
-
Analysis of an adaptive reasonable inventory control system
-
Towill, D., Evans, G. and Cheema, P. (1997) ‘Analysis of an adaptive reasonable inventory control system’, Journal of Production Planning and Control, Vol. 8, No. 6, pp.545–557.
-
(1997)
Journal of Production Planning and Control
, vol.8
, Issue.6
, pp. 545-557
-
-
Towill, D.1
Evans, G.2
Cheema, P.3
-
29
-
-
0032672093
-
Modeling and controling of dynamics of production system
-
Wiendahl, H.P. and Breithaupt, J. (1999) ‘Modeling and controling of dynamics of production system’, Journal of Production Planning and Control, Vol. 10, No. 4, pp.389–401.
-
(1999)
Journal of Production Planning and Control
, vol.10
, Issue.4
, pp. 389-401
-
-
Wiendahl, H.P.1
Breithaupt, J.2
-
31
-
-
0242269897
-
Continuous-time dynamic modeling of variable lead time
-
Wikner, J. (2003) ‘Continuous-time dynamic modeling of variable lead time’, International Journal of Production Research, Vol. 14, No. 12, pp.2787–2798.
-
(2003)
International Journal of Production Research
, vol.14
, Issue.12
, pp. 2787-2798
-
-
Wikner, J.1
|