메뉴 건너뛰기




Volumn , Issue , 2008, Pages 3-1-3-25

Production planning and control and the coordination of project supply chains

Author keywords

[No Author keywords available]

Indexed keywords


EID: 85055806226     PISSN: None     EISSN: None     Source Type: Book    
DOI: None     Document Type: Chapter
Times cited : (6)

References (64)
  • 1
    • 77952135520 scopus 로고    scopus 로고
    • Tools for the identification and reduction of waste in construction projects
    • Alarcon, L. F. (ed.), Rotterdam: A.A. Balkema
    • Alarcon, L. F. 1997. Tools for the identification and reduction of waste in construction projects. In: Alarcon, L. F. (ed.). Lean construction. Rotterdam: A.A. Balkema, 365-77.
    • (1997) Lean Construction , pp. 365-377
    • Alarcon, L.F.1
  • 5
    • 84856653029 scopus 로고    scopus 로고
    • Berkeley, USA: Dept. of Civil and Environmental Engineering, University of California. Technical Report
    • Ballard, G. 1997. Look-ahead planning: The missing link in production control. Berkeley, USA: Dept. of Civil and Environmental Engineering, University of California. Technical Report 97-3.
    • (1997) Look-Ahead Planning: The Missing Link in Production Control , pp. 97-103
    • Ballard, G.1
  • 7
    • 85055770888 scopus 로고    scopus 로고
    • PhD Thesis
    • PhD Thesis.
  • 12
    • 84866097510 scopus 로고    scopus 로고
    • Contributions to the evaluation of production planning and control systems in building companies
    • Formoso, C. T. and Ballard, G. (Org.), Gramado, Brazil
    • Bernardes, M. M. S. and Formoso, C. T. 2002. Contributions to the evaluation of production planning and control systems in building companies. In: Formoso, C. T. and Ballard, G. (Org.). Proceedings of the 10th Annual Conference of the International Group for Lean Construction, Gramado, Brazil, 489-99.
    • (2002) Proceedings of the 10Th Annual Conference of the International Group for Lean Construction , pp. 489-499
    • Bernardes, M.M.S.1    Formoso, C.T.2
  • 14
    • 0030534512 scopus 로고    scopus 로고
    • An organisational perspective on changing buyer-supplier relations: A critical review of the evidence
    • Bresnen, M. 1996. An organisational perspective on changing buyer-supplier relations: A critical review of the evidence. Organisation, 1 (3), 121-46.
    • (1996) Organisation , vol.1 , Issue.3 , pp. 121-146
    • Bresnen, M.1
  • 16
  • 17
    • 0033634601 scopus 로고    scopus 로고
    • The agile supply chain: Competing in volatile markets
    • Christopher, M. 2000. The agile supply chain: Competing in volatile markets. Industrial Marketing Management, 29, 37-44.
    • (2000) Industrial Marketing Management , vol.29 , pp. 37-44
    • Christopher, M.1
  • 26
    • 0040652192 scopus 로고    scopus 로고
    • An organizational assessment of interfirm coordination modes
    • Grandori, A. 1997. An organizational assessment of interfirm coordination modes. Organization Studies, 18 (6), 897-925.
    • (1997) Organization Studies , vol.18 , Issue.6 , pp. 897-925
    • Grandori, A.1
  • 30
    • 85055815213 scopus 로고    scopus 로고
    • International Group for Lean Construction
    • IGLC. See International Group for Lean Construction.
    • See
  • 31
    • 85055789109 scopus 로고    scopus 로고
    • Accessed on the 20th Dec. 2007
    • International Group for Lean Construction. 2007. www.iglc.net. Accessed on the 20th Dec. 2007.
    • (2007)
  • 37
    • 0003267827 scopus 로고
    • Is construction planning really doing its job? A critical examination of focus, role and process
    • Laufer, A. and Tucker R. L. 1987. Is construction planning really doing its job? A critical examination of focus, role and process. Construction Management and Economics, 5 (3), 243-66.
    • (1987) Construction Management and Economics , vol.5 , Issue.3 , pp. 243-266
    • Laufer, A.1    Tucker, R.L.2
  • 38
    • 0342726669 scopus 로고
    • Competence and timing dilemma in construction planning
    • Laufer, A. and Tucker R. L 1988. Competence and timing dilemma in construction planning. Construction Management and Economics, 6 (4), 339-55.
    • (1988) Construction Management and Economics , vol.6 , Issue.4 , pp. 339-355
    • Laufer, A.1    Tucker, R.L.2
  • 41
    • 0028401441 scopus 로고
    • The interdisciplinary theory of coordination
    • Malone, T. W. and Crowston, K. 1994. The interdisciplinary theory of coordination. ACM Computing Surveys, 26, 87-119.
    • (1994) ACM Computing Surveys , vol.26 , pp. 87-119
    • Malone, T.W.1    Crowston, K.2
  • 44
  • 45
    • 18144403769 scopus 로고    scopus 로고
    • Evaluation of stakeholder influence in the implemen-tation of construction projects
    • Olander, S. and Landin, A. 2005. Evaluation of stakeholder influence in the implemen-tation of construction projects. International Journal of Project Management, 23, 321-28.
    • (2005) International Journal of Project Management , vol.23 , pp. 321-328
    • Olander, S.1    Landin, A.2
  • 46
    • 85055829330 scopus 로고    scopus 로고
    • 2000. Master planning
    • Stadtler, H. and Kilger, C. (Org.), Berlin: Springer
    • Rohde, J. and Wagner, M. 2000. Master planning. In: Stadtler, H. and Kilger, C. (Org.). Supply chain management and advanced planning, Berlin: Springer, 57-71.
    • Supply Chain Management and Advanced Planning , pp. 57-71
    • Rohde, J.1    Wagner, M.2
  • 52
    • 84862306172 scopus 로고    scopus 로고
    • Improving the production planning and control system in a building company: Contributions after stabilization
    • Formoso, C. T. and Ballard, G. (Org.), Gramado, Brazil
    • Soares, A. C., Bernardes, M. M. S., and Formoso, C. T. 2002. Improving the production planning and control system in a building company: Contributions after stabilization. In: Formoso, C. T. and Ballard, G. (Org.). Proceedings of the 10th Annual Conference of the International Group for Lean Construction, Gramado, Brazil, 477-87.
    • (2002) Proceedings of the 10Th Annual Conference of the International Group for Lean Construction , pp. 477-487
    • Soares, A.C.1    Bernardes, M.M.S.2    Formoso, C.T.3
  • 53
    • 85055786926 scopus 로고    scopus 로고
    • Introduction
    • Stadtler, H. and Kilger, C. (Org.), Berlin: Springer
    • Stadtler, H. 2000. Introduction. In: Stadtler, H. and Kilger, C. (Org.). Supply chain management and advanced planning, Berlin: Springer, 1-4.
    • (2000) Supply Chain Management and Advanced Planning , pp. 1-4
    • Stadtler, H.1
  • 57
    • 13944264416 scopus 로고    scopus 로고
    • Look-ahead planning: Screening and pulling
    • Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, CA
    • Tommelein, I. D. and Ballard, G. 1997. Look-ahead planning: Screening and pulling. Technical Report No. 97-9, Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, CA.
    • (1997) Technical Report No. 97-9
    • Tommelein, I.D.1    Ballard, G.2
  • 60
    • 0000256327 scopus 로고
    • Strategic source: To make or not to make
    • NovDec
    • Venkatesan, R. 1992. Strategic source: To make or not to make. Harvard Business Review, Nov/Dec, 98-107.
    • (1992) Harvard Business Review , pp. 98-107
    • Venkatesan, R.1
  • 62
    • 29644435336 scopus 로고    scopus 로고
    • Stumbling blocks of PPC: Towards the holistic configuration of PPC systems
    • Wiendahl, H. H., von Cieminski, G., and Wiendahl, H. P. 2005. Stumbling blocks of PPC: Towards the holistic configuration of PPC systems. Production Planning and Control, 16 (7), 634-51.
    • (2005) Production Planning and Control , vol.16 , Issue.7 , pp. 634-651
    • Wiendahl, H.H.1    Von Cieminski, G.2    Wiendahl, H.P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.