-
1
-
-
77952135520
-
Tools for the identification and reduction of waste in construction projects
-
Alarcon, L. F. (ed.), Rotterdam: A.A. Balkema
-
Alarcon, L. F. 1997. Tools for the identification and reduction of waste in construction projects. In: Alarcon, L. F. (ed.). Lean construction. Rotterdam: A.A. Balkema, 365-77.
-
(1997)
Lean Construction
, pp. 365-377
-
-
Alarcon, L.F.1
-
3
-
-
84866082160
-
The importance of commitments management to the integration of make-to-order supply chains in construction industry
-
Sacks, R. and Bertelsen, S. (Org.), Santiago, Chile
-
Azambuja, M. M. B., Isatto, E. L., Marder, T. S., and Formoso, C. T. 2006. The importance of commitments management to the integration of make-to-order supply chains in construction industry. In: Sacks, R. and Bertelsen, S. (Org.). Proceedings of the 14th Annual Conference of the International Group for Lean Construction, Santiago, Chile, 609-24.
-
(2006)
Proceedings of the 14Th Annual Conference of the International Group for Lean Construction
, pp. 609-624
-
-
Azambuja, M.M.B.1
Isatto, E.L.2
Marder, T.S.3
Formoso, C.T.4
-
5
-
-
84856653029
-
-
Berkeley, USA: Dept. of Civil and Environmental Engineering, University of California. Technical Report
-
Ballard, G. 1997. Look-ahead planning: The missing link in production control. Berkeley, USA: Dept. of Civil and Environmental Engineering, University of California. Technical Report 97-3.
-
(1997)
Look-Ahead Planning: The Missing Link in Production Control
, pp. 97-103
-
-
Ballard, G.1
-
7
-
-
85055770888
-
-
PhD Thesis
-
PhD Thesis.
-
-
-
-
9
-
-
67349244749
-
An update on the last planner
-
Martinez, J. and Formoso, C. T. (Org.), Blacksburg, East Virginia, USA
-
Ballard, G. and Howell G 2003. An update on the last planner. In: Martinez, J. and Formoso, C. T. (Org.). Proceedings of the 11th Annual Conference of the International Group for Lean Construction, Blacksburg, East Virginia, USA.
-
(2003)
Proceedings of the 11Th Annual Conference of the International Group for Lean Construction
-
-
Ballard, G.1
Howell, G.2
-
10
-
-
78649562455
-
Production system design in construction
-
Singapore
-
Ballard, G., Koskela, L., Howell, G., and Zabelle, T. 2001. Production system design in construction. Proceedings of the 9th Annual Conference of the International Group for Lean Construction, Singapore.
-
(2001)
Proceedings of the 9Th Annual Conference of the International Group for Lean Construction
-
-
Ballard, G.1
Koskela, L.2
Howell, G.3
Zabelle, T.4
-
11
-
-
0033637773
-
New managerial challenges from supply chain opportunities
-
Ballou, R., Gilbert, S. M., and Mukherjee, A. 2000. New managerial challenges from supply chain opportunities. Industrial Marketing Management, 29, 7-18.
-
(2000)
Industrial Marketing Management
, vol.29
, pp. 7-18
-
-
Ballou, R.1
Gilbert, S.M.2
Mukherjee, A.3
-
12
-
-
84866097510
-
Contributions to the evaluation of production planning and control systems in building companies
-
Formoso, C. T. and Ballard, G. (Org.), Gramado, Brazil
-
Bernardes, M. M. S. and Formoso, C. T. 2002. Contributions to the evaluation of production planning and control systems in building companies. In: Formoso, C. T. and Ballard, G. (Org.). Proceedings of the 10th Annual Conference of the International Group for Lean Construction, Gramado, Brazil, 489-99.
-
(2002)
Proceedings of the 10Th Annual Conference of the International Group for Lean Construction
, pp. 489-499
-
-
Bernardes, M.M.S.1
Formoso, C.T.2
-
13
-
-
78651576018
-
A quantitative analysis of data collected from the last planner system in Brazil
-
Sacks, R. and Bertelsen, S. (Org.), Santiago, Chile
-
Bortolazza, R. C. and Formoso, C. T. 2006. A quantitative analysis of data collected from the last planner system in Brazil. In: Sacks, R. and Bertelsen, S. (Org.). Proceedings of the 14th Annual Conference of the International Group for Lean Construction, Santiago, Chile, 625-38.
-
(2006)
Proceedings of the 14Th Annual Conference of the International Group for Lean Construction
, pp. 625-638
-
-
Bortolazza, R.C.1
Formoso, C.T.2
-
14
-
-
0030534512
-
An organisational perspective on changing buyer-supplier relations: A critical review of the evidence
-
Bresnen, M. 1996. An organisational perspective on changing buyer-supplier relations: A critical review of the evidence. Organisation, 1 (3), 121-46.
-
(1996)
Organisation
, vol.1
, Issue.3
, pp. 121-146
-
-
Bresnen, M.1
-
15
-
-
85055814418
-
Achieving continuous flow in construction: An exploratory case research
-
Marosszeki, M. and Kenley, R. (Org.), Sydney, Australia
-
Bulhôes, I. R., Picchi, F. A., and Granja, A. D. 2005. Achieving continuous flow in construction: An exploratory case research. In: Marosszeki, M. and Kenley, R. (Org.). Proceedings of the 13th Annual Conference of the International Conference on Lean Construction, Sydney, Australia.
-
(2005)
Proceedings of the 13Th Annual Conference of the International Conference on Lean Construction
-
-
Bulhôes, I.R.1
Picchi, F.A.2
Granja, A.D.3
-
17
-
-
0033634601
-
The agile supply chain: Competing in volatile markets
-
Christopher, M. 2000. The agile supply chain: Competing in volatile markets. Industrial Marketing Management, 29, 37-44.
-
(2000)
Industrial Marketing Management
, vol.29
, pp. 37-44
-
-
Christopher, M.1
-
18
-
-
0024622052
-
Factors affecting construction planning efforts
-
Cohenca, D., Laufer, A., and Ledbetter F. 1989. Factors affecting construction planning efforts. Journal of Construction Engineering and Management, ASCE, 115 (2), 70-89.
-
(1989)
Journal of Construction Engineering and Management, ASCE
, vol.115
, Issue.2
, pp. 70-89
-
-
Cohenca, D.1
Laufer, A.2
Ledbetter, F.3
-
19
-
-
84993000139
-
Managing construction supply chains: The common sense approach
-
Cox, A. and Ireland, P. 2002. Managing construction supply chains: The common sense approach. Engineering, Construction and Architectural Management, 9, 409-18.
-
(2002)
Engineering, Construction and Architectural Management
, vol.9
, pp. 409-418
-
-
Cox, A.1
Ireland, P.2
-
22
-
-
0042815864
-
2000. Advanced planning
-
Stadtler, H. and Kilger, C. (Org.), Berlin: Springer
-
Fleischmann, B., Meyr, H., and Wagner, M. 2000. Advanced planning. In: Stadtler, H. and Kilger, C. (Org.). Supply chain management and advanced planning, Berlin: Springer, 57-71.
-
Supply Chain Management and Advanced Planning
, pp. 57-71
-
-
Fleischmann, B.1
Meyr, H.2
Wagner, M.3
-
25
-
-
84992989133
-
A model for managing the product development process in house building
-
Formoso, C. T., Tzortzopoulos, P., and Liedtke, R. 2002. A model for managing the product development process in house building. Engineering Construction and Architectural Management, 9 (5/6), 419-32.
-
(2002)
Engineering Construction and Architectural Management
, vol.9
, Issue.5-6
, pp. 419-432
-
-
Formoso, C.T.1
Tzortzopoulos, P.2
Liedtke, R.3
-
26
-
-
0040652192
-
An organizational assessment of interfirm coordination modes
-
Grandori, A. 1997. An organizational assessment of interfirm coordination modes. Organization Studies, 18 (6), 897-925.
-
(1997)
Organization Studies
, vol.18
, Issue.6
, pp. 897-925
-
-
Grandori, A.1
-
30
-
-
85055815213
-
-
International Group for Lean Construction
-
IGLC. See International Group for Lean Construction.
-
See
-
-
-
31
-
-
85055789109
-
-
Accessed on the 20th Dec. 2007
-
International Group for Lean Construction. 2007. www.iglc.net. Accessed on the 20th Dec. 2007.
-
(2007)
-
-
-
37
-
-
0003267827
-
Is construction planning really doing its job? A critical examination of focus, role and process
-
Laufer, A. and Tucker R. L. 1987. Is construction planning really doing its job? A critical examination of focus, role and process. Construction Management and Economics, 5 (3), 243-66.
-
(1987)
Construction Management and Economics
, vol.5
, Issue.3
, pp. 243-266
-
-
Laufer, A.1
Tucker, R.L.2
-
38
-
-
0342726669
-
Competence and timing dilemma in construction planning
-
Laufer, A. and Tucker R. L 1988. Competence and timing dilemma in construction planning. Construction Management and Economics, 6 (4), 339-55.
-
(1988)
Construction Management and Economics
, vol.6
, Issue.4
, pp. 339-355
-
-
Laufer, A.1
Tucker, R.L.2
-
40
-
-
84866107848
-
Linguistic action: Contributing to the theory of lean construction
-
Martinez, J. and Formoso, C. T. (Org.), Blacksburg, East Virginia, USA
-
Macomber, H. and Howell, G. 2003. Linguistic action: Contributing to the theory of lean construction. In: Martinez, J. and Formoso, C. T. (Org.). Proceedings of the 11th Annual Conference of the International Group for Lean Construction, Blacksburg, East Virginia, USA.
-
(2003)
Proceedings of the 11Th Annual Conference of the International Group for Lean Construction
-
-
Macomber, H.1
Howell, G.2
-
41
-
-
0028401441
-
The interdisciplinary theory of coordination
-
Malone, T. W. and Crowston, K. 1994. The interdisciplinary theory of coordination. ACM Computing Surveys, 26, 87-119.
-
(1994)
ACM Computing Surveys
, vol.26
, pp. 87-119
-
-
Malone, T.W.1
Crowston, K.2
-
43
-
-
17744391728
-
Quality management tools for lean production: Moving from enforcement to empower-ment
-
Formoso, C. T. and Ballard, G. (Org.), Gramado, Brazil
-
Marosszeky, M., Thomas, R., Karim, K., David, S., and McGeorge, D. 2002. Quality management tools for lean production: Moving from enforcement to empower-ment. In: Formoso, C. T. and Ballard, G. (Org.). Proceedings of the 10th Annual Conférence of the International Group for Lean Construction, Gramado, Brazil, 87-100.
-
(2002)
Proceedings of the 10Th Annual Conférence of the International Group for Lean Construction
, pp. 87-100
-
-
Marosszeky, M.1
Thomas, R.2
Karim, K.3
David, S.4
McGeorge, D.5
-
44
-
-
85055789009
-
A call for cost and reference models for construction supply chains
-
Martinez, J. and Formoso, C. T. (Org.), Blacksburg, East Virginia, USA
-
O’Brien, W. J. 2002. A call for cost and reference models for construction supply chains. In: Martinez, J. and Formoso, C. T. (Org.). Proceedings of the 11th Annual Confer-ence of the International Group for Lean Construction, Blacksburg, East Virginia, USA.
-
(2002)
Proceedings of the 11Th Annual Confer-Ence of the International Group for Lean Construction
-
-
O'Brien, W.J.1
-
45
-
-
18144403769
-
Evaluation of stakeholder influence in the implemen-tation of construction projects
-
Olander, S. and Landin, A. 2005. Evaluation of stakeholder influence in the implemen-tation of construction projects. International Journal of Project Management, 23, 321-28.
-
(2005)
International Journal of Project Management
, vol.23
, pp. 321-328
-
-
Olander, S.1
Landin, A.2
-
46
-
-
85055829330
-
2000. Master planning
-
Stadtler, H. and Kilger, C. (Org.), Berlin: Springer
-
Rohde, J. and Wagner, M. 2000. Master planning. In: Stadtler, H. and Kilger, C. (Org.). Supply chain management and advanced planning, Berlin: Springer, 57-71.
-
Supply Chain Management and Advanced Planning
, pp. 57-71
-
-
Rohde, J.1
Wagner, M.2
-
47
-
-
1842742031
-
Site-level construction information system
-
Sanvido, V. and Paulson, B. 1992. Site-level construction information system. Journal of Construction Engineering and Management, ASCE, 118 (4), 701-15.
-
(1992)
Journal of Construction Engineering and Management, ASCE
, vol.118
, Issue.4
, pp. 701-715
-
-
Sanvido, V.1
Paulson, B.2
-
48
-
-
1842842991
-
Safety and production: An integrated planning and control model
-
Saurin, T. A., Formoso, C. T. and Guimarães, L. B. M. 2004. Safety and production: An integrated planning and control model. Construction Management and Econom-ics, 22, 159-69.
-
(2004)
Construction Management and Econom-Ics
, vol.22
, pp. 159-169
-
-
Saurin, T.A.1
Formoso, C.T.2
Guimarães, L.B.M.3
-
49
-
-
84856663757
-
The design of production systems for low-income housing projects
-
Formoso, C. T. and Bertelsen, S. (Org.), Helsingor, Denmark
-
Schramm, F. K., Costa, D. B., and Formoso, C. T. 2004. The design of production systems for low-income housing projects. In: Formoso, C. T. and Bertelsen, S. (Org.). Proceedings of the 12th Conference of the International Group for Lean Construction, Helsingor, Denmark, 317-29.
-
(2004)
Proceedings of the 12Th Conference of the International Group for Lean Construction
, pp. 317-329
-
-
Schramm, F.K.1
Costa, D.B.2
Formoso, C.T.3
-
50
-
-
84866057085
-
The role of production system design in the management of complex projects
-
Sacks, R. and Bertelsen, S. (Org.), Santiago, Chile
-
Schramm, F. K., Rodrigues, A., and Formoso, C. T. 2006. The role of production system design in the management of complex projects. In: Sacks, R. and Bertelsen, S. (Org.). Proceedings of the 14th Annual Conference of the International Group for Lean Construction, Santiago, Chile, 227-40.
-
(2006)
Proceedings of the 14Th Annual Conference of the International Group for Lean Construction
, pp. 227-240
-
-
Schramm, F.K.1
Rodrigues, A.2
Formoso, C.T.3
-
52
-
-
84862306172
-
Improving the production planning and control system in a building company: Contributions after stabilization
-
Formoso, C. T. and Ballard, G. (Org.), Gramado, Brazil
-
Soares, A. C., Bernardes, M. M. S., and Formoso, C. T. 2002. Improving the production planning and control system in a building company: Contributions after stabilization. In: Formoso, C. T. and Ballard, G. (Org.). Proceedings of the 10th Annual Conference of the International Group for Lean Construction, Gramado, Brazil, 477-87.
-
(2002)
Proceedings of the 10Th Annual Conference of the International Group for Lean Construction
, pp. 477-487
-
-
Soares, A.C.1
Bernardes, M.M.S.2
Formoso, C.T.3
-
53
-
-
85055786926
-
Introduction
-
Stadtler, H. and Kilger, C. (Org.), Berlin: Springer
-
Stadtler, H. 2000. Introduction. In: Stadtler, H. and Kilger, C. (Org.). Supply chain management and advanced planning, Berlin: Springer, 1-4.
-
(2000)
Supply Chain Management and Advanced Planning
, pp. 1-4
-
-
Stadtler, H.1
-
57
-
-
13944264416
-
Look-ahead planning: Screening and pulling
-
Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, CA
-
Tommelein, I. D. and Ballard, G. 1997. Look-ahead planning: Screening and pulling. Technical Report No. 97-9, Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, CA.
-
(1997)
Technical Report No. 97-9
-
-
Tommelein, I.D.1
Ballard, G.2
-
58
-
-
13944269909
-
Work struc-turing to achieve integrated product-process design
-
Tsao, C. C. Y., Tommelein, I. D., Swanlund, E. S., and Howell, G. A. 2004. Work struc-turing to achieve integrated product-process design. Journal of Construction Engineering and Management, ASCE, 130 (6), 780-89.
-
(2004)
Journal of Construction Engineering and Management, ASCE
, vol.130
, Issue.6
, pp. 780-789
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Swanlund, E.S.3
Howell, G.A.4
-
60
-
-
0000256327
-
Strategic source: To make or not to make
-
NovDec
-
Venkatesan, R. 1992. Strategic source: To make or not to make. Harvard Business Review, Nov/Dec, 98-107.
-
(1992)
Harvard Business Review
, pp. 98-107
-
-
Venkatesan, R.1
-
61
-
-
2242430168
-
Understanding construction supply chains - an alternative interpretation
-
Singapore, National University of Singapore
-
Vrijhoef, R., Koskela, L., and Howell, G. 2001. Understanding construction supply chains - an alternative interpretation. In: Proceedings of the 9th International Group forLean Construction Conference, Singapore, National University of Singapore.
-
(2001)
In: Proceedings of the 9Th International Group Forlean Construction Conference
-
-
Vrijhoef, R.1
Koskela, L.2
Howell, G.3
-
62
-
-
29644435336
-
Stumbling blocks of PPC: Towards the holistic configuration of PPC systems
-
Wiendahl, H. H., von Cieminski, G., and Wiendahl, H. P. 2005. Stumbling blocks of PPC: Towards the holistic configuration of PPC systems. Production Planning and Control, 16 (7), 634-51.
-
(2005)
Production Planning and Control
, vol.16
, Issue.7
, pp. 634-651
-
-
Wiendahl, H.H.1
Von Cieminski, G.2
Wiendahl, H.P.3
|