-
6
-
-
0036302691
-
An introduction to road vulnerability: What has been done, is done and should be done
-
Berdica, K (2002) An introduction to road vulnerability: what has been done, is done and should be done. Transport Policy, 9: 117–127
-
(2002)
Transport Policy
, vol.9
, pp. 117-127
-
-
Berdica, K.1
-
7
-
-
33646681684
-
Techniques for absolute capacity determination in railways
-
in press
-
Burdett RL, Kozan E (2006) Techniques for absolute capacity determination in railways. Transportation Research B, in press
-
(2006)
Transportation Research B
-
-
Burdett, R.L.1
Kozan, E.2
-
8
-
-
0032885173
-
Ex ante heuristic measures of schedule reliability
-
Carey M (1999) Ex ante heuristic measures of schedule reliability. Transportation Research B 33: 473–494
-
(1999)
Transportation Research B
, vol.33
, pp. 473-494
-
-
Carey, M.1
-
9
-
-
0036497661
-
Capacity reliability of a road network: An assessment methodology and numerical results
-
Chen A, Yang H, Lo HK and Tang WH (2002) Capacity reliability of a road network: an assessment methodology and numerical results. Transportation Research B 36: 225–252
-
(2002)
Transportation Research B
, vol.36
, pp. 225-252
-
-
Chen, A.1
Yang, H.2
Lo, H.K.3
Tang, W.H.4
-
11
-
-
0142156064
-
Scheduling trains on a railway network using a discrete event model of railway traffic
-
Dorfman MJ, Medanic J (2004) Scheduling trains on a railway network using a discrete event model of railway traffic. Transportation Research B 38: 81–98
-
(2004)
Transportation Research B
, vol.38
, pp. 81-98
-
-
Dorfman, M.J.1
Medanic, J.2
-
13
-
-
0036589190
-
Developments in transport policy: The evolution of capacity charges on the UK rail network
-
Gibson S, Cooper G, Ball B (2002) Developments in transport policy: The evolution of capacity charges on the UK rail network. Journal of Transport Economics and Policy 36: 341–354
-
(2002)
Journal of Transport Economics and Policy
, vol.36
, pp. 341-354
-
-
Gibson, S.1
Cooper, G.2
Ball, B.3
-
14
-
-
0031597057
-
Predicting on-time performance in scheduled railroad operations: Methodology and application to train scheduling
-
Hallowell SF, Harker PT (1998) Predicting on-time performance in scheduled railroad operations: methodology and application to train scheduling. Transportation Research A 32: 279–295
-
(1998)
Transportation Research A
, vol.32
, pp. 279-295
-
-
Hallowell, S.F.1
Harker, P.T.2
-
16
-
-
0035263422
-
Running times on railway sections with heterogeneous train traffic
-
Huisman T, Boucherie RJ (2001) Running times on railway sections with heterogeneous train traffic. Transportation Research B 35: 271-292
-
(2001)
Transportation Research B
, vol.35
, pp. 271-292
-
-
Huisman, T.1
Boucherie, R.J.2
-
17
-
-
0036794824
-
A solvable queueing network model for railway networks and its validation and application for the Netherlands
-
Huisman T, Boucherie RJ, van Dijk NM (2002) A solvable queueing network model for railway networks and its validation and application for the Netherlands. European Journal of Operational Research 142: 30-51
-
(2002)
European Journal of Operational Research
, vol.142
, pp. 30-51
-
-
Huisman, T.1
Boucherie, R.J.2
Van Dijk, N.M.3
-
18
-
-
14644427856
-
A railway capacity determination model and rail access charging methodologies
-
Kozan E, Burdett R (2005) A railway capacity determination model and rail access charging methodologies. Transportation Planning and Technology 28: 27– 45
-
(2005)
Transportation Planning and Technology
, vol.28
, pp. 27-45
-
-
Kozan, E.1
Burdett, R.2
-
19
-
-
2942720393
-
Measuring capacity flexibility of a transportation system
-
Morlok EK, Chang DJ (2004) Measuring capacity flexibility of a transportation system, Transportation Research A 38: 405-420
-
(2004)
Transportation Research A
, vol.38
, pp. 405-420
-
-
Morlok, E.K.1
Chang, D.J.2
-
20
-
-
33645907106
-
Transport network reliability measurement and analysis
-
Nicholson A (2003) Transport network reliability measurement and analysis. Transportes XI(2): 49–62
-
(2003)
Transportes
, vol.11
, Issue.2
, pp. 49-62
-
-
Nicholson, A.1
-
21
-
-
7744226980
-
Influencing factors on train punctuality: Results from some Norwegian studies
-
Olsson NOE, Haugland H (2004) Influencing factors on train punctuality: results from some Norwegian studies. Transport Policy 11: 387–397
-
(2004)
Transport Policy
, vol.11
, pp. 387-397
-
-
Olsson, N.O.E.1
Haugland, H.2
-
22
-
-
0035400168
-
Coping with unreliability in public transport chains: A case study for Netherlands
-
Rietveld P, Bruinsma FR, van Vuuren DJ (2001) Coping with unreliability in public transport chains: A case study for Netherlands. Transportation Research A 35: 539-559
-
(2001)
Transportation Research A
, vol.35
, pp. 539-559
-
-
Rietveld, P.1
Bruinsma, F.R.2
Van Vuuren, D.J.3
-
23
-
-
0032884348
-
Railway traffic control and train scheduling based on inter-train conflict management
-
Sahin I (1999) Railway traffic control and train scheduling based on inter-train conflict management. Transportation Research B 33: 511-534
-
(1999)
Transportation Research B
, vol.33
, pp. 511-534
-
-
Sahin, I.1
-
24
-
-
0035062888
-
A review of British evidence on time and service quality valuations
-
Wardman M (2001) A review of British evidence on time and service quality valuations. Transportation Research E 37: 107-128
-
(2001)
Transportation Research E
, vol.37
, pp. 107-128
-
-
Wardman, M.1
-
25
-
-
85039451084
-
Allvarliga funktionsstörningar i baninfrastrukturen: Beräkning av effekter på tågtrafiken (Serious breakdowns in the track infrastructure: Calculation of erffects on rail traffic)
-
(In Swedish)
-
Wiklund M (2003) Allvarliga funktionsstörningar i baninfrastrukturen: Beräkning av effekter på tågtrafiken (Serious breakdowns in the track infrastructure: calculation of erffects on rail traffic). VTI meddelande 959 (In Swedish)
-
(2003)
VTI Meddelande
, vol.959
-
-
Wiklund, M.1
|