-
2
-
-
0028481461
-
Stochastic approximation to the effects of headways on knock-on-delays of trains
-
Carey M., and Kwiecinski A. Stochastic approximation to the effects of headways on knock-on-delays of trains. Transportation Research Part B 28 4 (1994) 251-267
-
(1994)
Transportation Research Part B
, vol.28
, Issue.4
, pp. 251-267
-
-
Carey, M.1
Kwiecinski, A.2
-
4
-
-
0031147586
-
Rail track infrastructure ownership: investment and operational issues
-
Ferreira L. Rail track infrastructure ownership: investment and operational issues. Transportation 24 (1997) 183-200
-
(1997)
Transportation
, vol.24
, pp. 183-200
-
-
Ferreira, L.1
-
5
-
-
0037373084
-
Allocation of capacity in the rail industry
-
Gibson S. Allocation of capacity in the rail industry. Utilities Policy 11 (2003) 39-42
-
(2003)
Utilities Policy
, vol.11
, pp. 39-42
-
-
Gibson, S.1
-
6
-
-
0023959999
-
Predicting dispatching delays on a low speed single track railroad
-
Greenberg B.S. Predicting dispatching delays on a low speed single track railroad. Transportation Science 22 1 (1988) 31-38
-
(1988)
Transportation Science
, vol.22
, Issue.1
, pp. 31-38
-
-
Greenberg, B.S.1
-
7
-
-
0023456620
-
Passenger delay in a rapid transit station
-
Hall R.W. Passenger delay in a rapid transit station. Transportation Science 21 4 (1987) 279-292
-
(1987)
Transportation Science
, vol.21
, Issue.4
, pp. 279-292
-
-
Hall, R.W.1
-
8
-
-
0032206316
-
Modelling train delays in urban networks
-
Higgins A., and Kozan E. Modelling train delays in urban networks. Transportation Science 32 4 (1998) 346-357
-
(1998)
Transportation Science
, vol.32
, Issue.4
, pp. 346-357
-
-
Higgins, A.1
Kozan, E.2
-
10
-
-
85029875444
-
-
Kozan, E., Burdett, R.L., 2004. Capacity determination issues in railway lines. In: Conference on Railway Engineering, CORE 2004, Australia, pp. 31.1-31.6.
-
-
-
-
11
-
-
14644427856
-
A railway capacity determination model and rail access charging methodologies
-
Kozan E., and Burdett R.L. A railway capacity determination model and rail access charging methodologies. Transportation Planning and Technology 28 1 (2005) 27-45
-
(2005)
Transportation Planning and Technology
, vol.28
, Issue.1
, pp. 27-45
-
-
Kozan, E.1
Burdett, R.L.2
-
12
-
-
0013315834
-
A branch and bound procedure for optimal train dispatching
-
Kraft E.R. A branch and bound procedure for optimal train dispatching. Journal of Transportation Research Forum 28 (1987) 263-276
-
(1987)
Journal of Transportation Research Forum
, vol.28
, pp. 263-276
-
-
Kraft, E.R.1
-
13
-
-
0042589663
-
Over the road transit time for a single track railway
-
Petersen E.R. Over the road transit time for a single track railway. Transportation Science 8 (1974) 65-74
-
(1974)
Transportation Science
, vol.8
, pp. 65-74
-
-
Petersen, E.R.1
-
14
-
-
5844328817
-
Interference delays on a partially double tracked railway with intermediate signalling
-
Petersen E.R. Interference delays on a partially double tracked railway with intermediate signalling. Journal of the Transportation Forum 16 (1975) 54-62
-
(1975)
Journal of the Transportation Forum
, vol.16
, pp. 54-62
-
-
Petersen, E.R.1
|