메뉴 건너뛰기




Volumn 11, Issue 4, 2004, Pages 387-397

Influencing factors on train punctuality - Results from some Norwegian studies

Author keywords

Delays; Influencing factors; Speed restriction; Train punctuality

Indexed keywords

EFFICIENCY MEASUREMENT; RAILWAY TRANSPORT; TEMPORAL ANALYSIS; VELOCITY;

EID: 7744226980     PISSN: 0967070X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.tranpol.2004.07.001     Document Type: Article
Times cited : (108)

References (25)
  • 1
    • 7744243058 scopus 로고    scopus 로고
    • Tågtrafiken-Punktlighet och förseningar, Förstudie FoU-projekt 2001
    • Rapport 2001:1. Banverket, Borlänge, Sweden
    • Banverket, 2001. Tågtrafiken-Punktlighet och förseningar, Förstudie FoU-projekt 2001, Rapport 2001:1. Banverket, Borlänge, Sweden
    • (2001)
    • Banverket, A.1
  • 2
    • 7744233145 scopus 로고    scopus 로고
    • Benchmarking Passenger Transport in Railways
    • BOB Railway Case NEA Transport Research And Training, Rijswijk, The Netherlands
    • BOB Railway Case, 2003. Benchmarking Passenger Transport in Railways. NEA Transport Research And Training, Rijswijk, The Netherlands
    • (2003)
  • 3
    • 0031594060 scopus 로고    scopus 로고
    • Optimizing scheduled times, allowing for behavioural response
    • M. Carey Optimizing scheduled times, allowing for behavioural response Transportation Research Part B 32 1998 329-342
    • (1998) Transportation Research Part B , vol.32 , pp. 329-342
    • Carey, M.1
  • 4
    • 0032885173 scopus 로고    scopus 로고
    • Ex ante heuristic measures of schedule reliability
    • M. Carey Ex ante heuristic measures of schedule reliability Transportation Research Part B 33 1999 473-494
    • (1999) Transportation Research Part B , vol.33 , pp. 473-494
    • Carey, M.1
  • 6
    • 7744232321 scopus 로고
    • Punctuality analyses - A basis for monitoring and investment in a liberalized railway systems
    • M. Gylee Punctuality analyses - a basis for monitoring and investment in a liberalized railway systems Proceedings of Seminars held at the 22nd European Transport Conference P384 9 1994 153-165
    • (1994) Proceedings of Seminars Held at the 22nd European Transport Conference , vol.P384 , Issue.9 , pp. 153-165
    • Gylee, M.1
  • 8
    • 7744220558 scopus 로고    scopus 로고
    • Passagerutbyte I tåg. Mätningar av av-och påstigningstider samt ansats till modell för att beskriva samband
    • TRITA IP AR 00-86 Royal Institute of Technology Stockholm
    • W. Heinz Passagerutbyte I tåg. Mätningar av av-och påstigningstider samt ansats till modell för att beskriva samband, TRITA IP AR 00-86 2000 Royal Institute of Technology Stockholm
    • (2000)
    • Heinz, W.1
  • 10
    • 0346948154 scopus 로고
    • Canadian Transport Commission, Research Branch, Ottawa/Hull, March 1979, Research Report No. 60-79-01
    • Kahan A.M. 1979. Railway Capacity Analysis and Related Methodology. Canadian Transport Commission, Research Branch, Ottawa/Hull, March 1979, Research Report No. 60-79-01
    • (1979) Railway Capacity Analysis and Related Methodology
    • Kahan, A.M.1
  • 11
    • 0036140881 scopus 로고    scopus 로고
    • Travel time variability: A review of theoretical and empirical issues
    • R.B. Noland J.W. Polak Travel time variability: A review of theoretical and empirical issues Transport Reviews 22 1 2002 39-45
    • (2002) Transport Reviews , vol.22 , Issue.1 , pp. 39-45
    • Noland, R.B.1    Polak, J.W.2
  • 12
    • 7744232849 scopus 로고    scopus 로고
    • Konsekvensvurdering av anleggsarbeid i Vestkorridoren
    • SINTEF Industrial Management Trondheim, Norway
    • N. Olsson I.A.F. Sætermo C. Røstad Konsekvensvurdering av anleggsarbeid i Vestkorridoren 2002 SINTEF Industrial Management Trondheim, Norway
    • (2002)
    • Olsson, N.1    Sætermo, I.A.F.2    Røstad, C.3
  • 13
    • 7744232850 scopus 로고    scopus 로고
    • Nordlandsbanen-fortsatte analyser
    • SINTEF Industrial Management Trondheim, Norway
    • N. Olsson C. Røstad M. Veiseth Nordlandsbanen-fortsatte analyser 2002 SINTEF Industrial Management Trondheim, Norway
    • (2002)
    • Olsson, N.1    Røstad, C.2    Veiseth, M.3
  • 14
    • 7744223218 scopus 로고    scopus 로고
    • Vurdering av regler for avvikshåndtering ved uregelmessigheter i toggangen
    • SINTEF Industrial Management Trondheim, Norway
    • N. Olsson I.A.F. Sætermo C. Røstad Vurdering av regler for avvikshåndtering ved uregelmessigheter i toggangen 2002 SINTEF Industrial Management Trondheim, Norway
    • (2002)
    • Olsson, N.1    Sætermo, I.A.F.2    Røstad, C.3
  • 15
    • 0035400168 scopus 로고    scopus 로고
    • Coping with unreliability in public transportation chains: A case study for Netherlands
    • P. Rietveld F.R. Bruinsma D.J. van Vuuren Coping with unreliability in public transportation chains: A case study for Netherlands Transportation Research Part A 35 2001 539-559
    • (2001) Transportation Research Part A , vol.35 , pp. 539-559
    • Rietveld, P.1    Bruinsma, F.R.2    van Vuuren, D.J.3
  • 16
    • 7744231084 scopus 로고
    • Tågtrafikens punktlighet
    • Revisionsrapport, Dnr. 1986:1091. Riksrevisionsverket, Stockholm, Sweden
    • Riksrevisionsverket A. 1986. Tågtrafikens punktlighet, Revisionsrapport, Dnr. 1986:1091. Riksrevisionsverket, Stockholm, Sweden
    • (1986)
    • Riksrevisionsverket, A.1
  • 17
    • 7744228147 scopus 로고    scopus 로고
    • Measures of regularity and punctuality in public transport operation. Transportation systems
    • preprints of the Eighth International Federation of Automatic Control 2
    • Rudnicki A. 1997 Measures of regularity and punctuality in public transport operation. Transportation systems, preprints of the Eighth International Federation of Automatic Control 2
    • (1997)
    • Rudnicki, A.1
  • 18
    • 7744223800 scopus 로고    scopus 로고
    • Kritiske prestasjonsindikatorer i jernbanedrift
    • Master thesis, Department of Production and Quality Engineering, the Norwegian University of Science and Technology
    • Skagestad R. 2004. Kritiske prestasjonsindikatorer i jernbanedrift. Master thesis, Department of Production and Quality Engineering, the Norwegian University of Science and Technology
    • (2004)
    • Skagestad, R.1
  • 19
    • 7744246689 scopus 로고
    • Kapasitet på jernbanestrekninger, utarbeidet for NSB banedivisjonen, Teknisk kontor
    • Institutt for energiteknikk Norway
    • S. Skartsæterhagen Kapasitet på jernbanestrekninger, utarbeidet for NSB banedivisjonen, Teknisk kontor 1993 Institutt for energiteknikk Norway
    • (1993)
    • Skartsæterhagen, S.1
  • 20
    • 7744220206 scopus 로고    scopus 로고
    • Skjæret J. En revisjon. NSB Bane Ingeniørtjenesten, Oslo, Norway, 2002.10.28
    • Skjæret, J., 2002. Kapasitetsberegninger. En revisjon. NSB Bane Ingeniørtjenesten, Oslo, Norway, 2002.10.28.
    • (2002) Kapasitetsberegninger
  • 21
    • 7744243059 scopus 로고    scopus 로고
    • National Rail Trends Yearbook 2003-2004
    • SRA Strategic Rail Authority, UK
    • SRA, 2004. National Rail Trends Yearbook 2003-2004. Strategic Rail Authority, UK
    • (2004)
  • 23
    • 7744228756 scopus 로고    scopus 로고
    • A Life Cycle Cost Model for the Prioritisation of Track Maintenance, Innovations for a Cost Effective Railway Track
    • November 2002 ProMιn-Fraunhofer Institute IITB
    • J. Vatn A Life Cycle Cost Model for the Prioritisation of Track Maintenance, Innovations for a Cost Effective Railway Track, November 2002 2002 ProMιn-Fraunhofer Institute IITB
    • (2002)
    • Vatn, J.1
  • 24
    • 7744230767 scopus 로고    scopus 로고
    • Punktlighet i jernbanedrift
    • Master thesis, Department of Production and Quality Engineering, the Norwegian University of Science and Technology, Norway
    • Veiseth M. 2002. Punktlighet i jernbanedrift. Master thesis, Department of Production and Quality Engineering, the Norwegian University of Science and Technology, Norwa
    • (2002)
    • Veiseth, M.1
  • 25
    • 7744240669 scopus 로고    scopus 로고
    • PUNDUS-Punktlighets Og uNDerveisUnderSøkelse-Oppsummering av et punktlighetsarbeid utført av Jernbaneverket og SINTEF Teknologiledelse våren 2003
    • SINTEF Industrial Management Trondheim
    • M. Veiseth N. Olsson C.C. Røstad M. Indbryn PUNDUS-Punktlighets Og uNDerveisUnderSøkelse-Oppsummering av et punktlighetsarbeid utført av Jernbaneverket og SINTEF Teknologiledelse våren 2003 2003 SINTEF Industrial Management Trondheim
    • (2003)
    • Veiseth, M.1    Olsson, N.2    Røstad, C.C.3    Indbryn, M.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.