메뉴 건너뛰기




Volumn 170, Issue , 2015, Pages 489-500

Workforce minimization for a mixed-model assembly line in the automotive industry

Author keywords

Assembly line; Heuristics; Integer linear programming; Optimization; Scheduling; Worker assignment; Workforce dimensioning

Indexed keywords

ASSEMBLY; ASSEMBLY MACHINES; AUTOMOTIVE INDUSTRY; OPTIMIZATION; SCHEDULING; TECHNOLOGY TRANSFER;

EID: 84959180793     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2015.05.038     Document Type: Article
Times cited : (59)

References (39)
  • 1
    • 0020816054 scopus 로고
    • A method for assembly line balancing with more than one worker in each station
    • F. Akagi, H. Osaki, and S. Kikuchi A method for assembly line balancing with more than one worker in each station Int. J. Prod. Res. 21 5 1983 755 770
    • (1983) Int. J. Prod. Res. , vol.21 , Issue.5 , pp. 755-770
    • Akagi, F.1    Osaki, H.2    Kikuchi, S.3
  • 2
    • 84865675579 scopus 로고    scopus 로고
    • Two extensions for the ALWABP: Parallel stations and collaborative approach
    • F.F.B. Araújo, A.M. Costa, and C. Miralles Two extensions for the ALWABP: parallel stations and collaborative approach Int. J. Prod. Econ. 140 1 2012 483 495
    • (2012) Int. J. Prod. Econ. , vol.140 , Issue.1 , pp. 483-495
    • Araújo, F.F.B.1    Costa, A.M.2    Miralles, C.3
  • 3
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • O. Battaïa, and A. Dolgui A taxonomy of line balancing problems and their solution approaches Int. J. Prod. Econ. 142 2 2013 259 277
    • (2013) Int. J. Prod. Econ. , vol.142 , Issue.2 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 5
    • 78049444965 scopus 로고    scopus 로고
    • On solving the assembly line worker assignment and balancing problem via beam search
    • C. Blum, and C. Miralles On solving the assembly line worker assignment and balancing problem via beam search Comput. Oper. Res. 38 1 2011 328 329
    • (2011) Comput. Oper. Res. , vol.38 , Issue.1 , pp. 328-329
    • Blum, C.1    Miralles, C.2
  • 6
    • 84937038934 scopus 로고    scopus 로고
    • Workforce aging in production systems: Modeling and performance evaluation
    • F. Boenzi, G. Mossa, G. Mummolo, and V.A. Romano Workforce aging in production systems: modeling and performance evaluation Procedia Eng. 100 2015 1108 1115
    • (2015) Procedia Eng. , vol.100 , pp. 1108-1115
    • Boenzi, F.1    Mossa, G.2    Mummolo, G.3    Romano, V.A.4
  • 7
    • 84892557305 scopus 로고    scopus 로고
    • A heuristic and a branch-and-bound algorithm for the assembly line worker assignment and balancing problem
    • L. Borba, and M. Ritt A heuristic and a branch-and-bound algorithm for the assembly line worker assignment and balancing problem Comput. Oper. Res. 45 2014 87 96
    • (2014) Comput. Oper. Res. , vol.45 , pp. 87-96
    • Borba, L.1    Ritt, M.2
  • 8
    • 67651174303 scopus 로고    scopus 로고
    • Job rotation in assembly lines employing disabled workers
    • A.M. Costa, and C. Miralles Job rotation in assembly lines employing disabled workers Int. J. Prod. Econ. 120 2 2009 625 632
    • (2009) Int. J. Prod. Econ. , vol.120 , Issue.2 , pp. 625-632
    • Costa, A.M.1    Miralles, C.2
  • 9
    • 40649088035 scopus 로고    scopus 로고
    • Balancing assembly line with skilled and unskilled workers
    • A. Corominas, R. Pastor, and J. Plans Balancing assembly line with skilled and unskilled workers Omega 36 6 2008 1126 1132
    • (2008) Omega , vol.36 , Issue.6 , pp. 1126-1132
    • Corominas, A.1    Pastor, R.2    Plans, J.3
  • 12
    • 84862784973 scopus 로고    scopus 로고
    • An effective approximation algorithm for the Malleable Parallel Task Scheduling problem
    • L. Fan, F. Zhang, G. Wang, and Z. Liu An effective approximation algorithm for the Malleable Parallel Task Scheduling problem J. Parallel Distrib. Comput. 72 2012 693 704
    • (2012) J. Parallel Distrib. Comput. , vol.72 , pp. 693-704
    • Fan, L.1    Zhang, F.2    Wang, G.3    Liu, Z.4
  • 13
    • 42949144864 scopus 로고    scopus 로고
    • Heuristics for workforce planning with worker differences
    • J.W. Fowler, P. Wirojanagud, and E.S. Gel Heuristics for workforce planning with worker differences Eur. J. Oper. Res. 190 3 2008 724 740
    • (2008) Eur. J. Oper. Res. , vol.190 , Issue.3 , pp. 724-740
    • Fowler, J.W.1    Wirojanagud, P.2    Gel, E.S.3
  • 15
    • 84980053551 scopus 로고    scopus 로고
    • The effect of worker learning on manual order picking processes
    • in press
    • E.H. Grosse, and C.H. Glock The effect of worker learning on manual order picking processes Int. J. Prod. Econ 2015 10.1016/j.ijpe.2014.12.018 in press
    • (2015) Int. J. Prod. Econ
    • Grosse, E.H.1    Glock, C.H.2
  • 16
    • 84886301501 scopus 로고    scopus 로고
    • The effect of worker learning and forgetting on storage reassignment decisions in order picking systems
    • E.H. Grosse, C.H. Glock, and M.Y. Jaber The effect of worker learning and forgetting on storage reassignment decisions in order picking systems Comput. Ind. Eng. 66 4 2013 653 662
    • (2013) Comput. Ind. Eng. , vol.66 , Issue.4 , pp. 653-662
    • Grosse, E.H.1    Glock, C.H.2    Jaber, M.Y.3
  • 17
    • 84920520636 scopus 로고    scopus 로고
    • Integer programming techniques for solving non-linear workforce planning models with learning
    • M. Hewitt, A. Chacosky, S.E. Grasman, and B.W. Thomas Integer programming techniques for solving non-linear workforce planning models with learning Eur. J. Oper. Res. 241 3 2015 942 950
    • (2015) Eur. J. Oper. Res. , vol.241 , Issue.3 , pp. 942-950
    • Hewitt, M.1    Chacosky, A.2    Grasman, S.E.3    Thomas, B.W.4
  • 18
    • 84896895059 scopus 로고    scopus 로고
    • A non-zero integer non-linear programming model for maintenance workforce sizing
    • D.E. Ighravwe, and S.A. Oke A non-zero integer non-linear programming model for maintenance workforce sizing Int J. Prod. Econ. 150 2014 204 214
    • (2014) Int J. Prod. Econ. , vol.150 , pp. 204-214
    • Ighravwe, D.E.1    Oke, S.A.2
  • 19
    • 81955168111 scopus 로고    scopus 로고
    • Scheduling malleable tasks with precedence constraints
    • K. Jansen, and H. Zhang Scheduling malleable tasks with precedence constraints J. Comput. Syst. Sci. 78 2012 245 259
    • (2012) J. Comput. Syst. Sci. , vol.78 , pp. 245-259
    • Jansen, K.1    Zhang, H.2
  • 21
    • 21544447635 scopus 로고
    • Development of operator assignment schedules: A DSS approach
    • C.M. Lutz, and K.R. Davis Development of operator assignment schedules: a DSS approach Omega 22 1 1994 57 67
    • (1994) Omega , vol.22 , Issue.1 , pp. 57-67
    • Lutz, C.M.1    Davis, K.R.2
  • 22
    • 34548510141 scopus 로고    scopus 로고
    • Advantages of assembly lines in sheltered work centres for disabled. A case study
    • C. Miralles, J.P. García-Sabater, C. Andrés, and M. Cardós Advantages of assembly lines in sheltered work centres for disabled. A case study Int J. Prod. Econ. 110 1-2 2007 187 197
    • (2007) Int J. Prod. Econ. , vol.110 , Issue.1-2 , pp. 187-197
    • Miralles, C.1    García-Sabater, J.P.2    Andrés, C.3    Cardós, M.4
  • 23
    • 38049000847 scopus 로고    scopus 로고
    • Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled
    • C. Miralles, J.P. García-Sabater, C. Andrés, and M. Cardós Branch and bound procedures for solving the assembly line worker assignment and balancing problem: application to sheltered work centres for disabled Discret. Appl. Math. 156 2008 357 367
    • (2008) Discret. Appl. Math. , vol.156 , pp. 357-367
    • Miralles, C.1    García-Sabater, J.P.2    Andrés, C.3    Cardós, M.4
  • 24
    • 84871712239 scopus 로고    scopus 로고
    • Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers
    • M.C.O. Moreira, and A.M. Costa Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers Int J. Prod. Econ. 141 2 2013 552 560
    • (2013) Int J. Prod. Econ. , vol.141 , Issue.2 , pp. 552-560
    • Moreira, M.C.O.1    Costa, A.M.2
  • 25
    • 84907979385 scopus 로고    scopus 로고
    • Model and heuristics for the assembly line worker integration and balancing problem
    • M.C.O. Moreira, C. Miralles, and A.M. Cost Model and heuristics for the assembly line worker integration and balancing problem Comput. Oper. Res. 54 2015 64 73
    • (2015) Comput. Oper. Res. , vol.54 , pp. 64-73
    • Moreira, M.C.O.1    Miralles, C.2    Cost, A.M.3
  • 26
    • 84866148241 scopus 로고    scopus 로고
    • An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II
    • O. Mutlu, O. Polat, and A.A. Supciller An iterative genetic algorithm for the assembly line worker assignment and balancing problem of type-II Comput. Oper. Res. 40 1 2013 418 426
    • (2013) Comput. Oper. Res. , vol.40 , Issue.1 , pp. 418-426
    • Mutlu, O.1    Polat, O.2    Supciller, A.A.3
  • 27
    • 38849099717 scopus 로고    scopus 로고
    • Optimal allocation of heterogeneous workers in a U-shaped production line
    • K. Nakade, and R. Nishiwaki Optimal allocation of heterogeneous workers in a U-shaped production line Comput. Ind. Eng. 54 3 2008 432 440
    • (2008) Comput. Ind. Eng. , vol.54 , Issue.3 , pp. 432-440
    • Nakade, K.1    Nishiwaki, R.2
  • 28
    • 0032624742 scopus 로고    scopus 로고
    • An optimal worker allocation problem for a U-shaped production line
    • K. Nakade, and K. Ohno An optimal worker allocation problem for a U-shaped production line Int. J. Prod. Econ. 60-61 1 1999 353 358
    • (1999) Int. J. Prod. Econ. , vol.60-61 , Issue.1 , pp. 353-358
    • Nakade, K.1    Ohno, K.2
  • 29
    • 68949219559 scopus 로고    scopus 로고
    • Worker allocation in make-to-order assembly cells
    • E. Niemi Worker allocation in make-to-order assembly cells Robot. Comput.-Integr. Manuf. 25 6 2009 932 936
    • (2009) Robot. Comput.-Integr. Manuf. , vol.25 , Issue.6 , pp. 932-936
    • Niemi, E.1
  • 30
    • 84868207774 scopus 로고    scopus 로고
    • Integrating workers' differences into workforce planning
    • M. Othman, N. Bhuiyan, and G.J. Gouw Integrating workers' differences into workforce planning Comput. Ind. Eng. 63 4 2012 1096 1106
    • (2012) Comput. Ind. Eng. , vol.63 , Issue.4 , pp. 1096-1106
    • Othman, M.1    Bhuiyan, N.2    Gouw, G.J.3
  • 31
    • 84885425975 scopus 로고    scopus 로고
    • Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times
    • C. Özgüven, and B. Sungur Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times Appl. Math. Model. 37 22 2013 9117 9131
    • (2013) Appl. Math. Model. , vol.37 , Issue.22 , pp. 9117-9131
    • Özgüven, C.1    Sungur, B.2
  • 32
    • 80053359560 scopus 로고    scopus 로고
    • A dominant class of schedules for malleable jobs in the problem to minimize the total weighted completion time
    • R. Sadykov A dominant class of schedules for malleable jobs in the problem to minimize the total weighted completion time Comput. Oper. Res. 39 2012 1265 1270
    • (2012) Comput. Oper. Res. , vol.39 , pp. 1265-1270
    • Sadykov, R.1
  • 33
    • 42649083687 scopus 로고    scopus 로고
    • Worker allocation in lean U-shaped production lines
    • J.P. Shewchuk Worker allocation in lean U-shaped production lines Int. J. Prod. Res. 46 13 2008 3485 3502
    • (2008) Int. J. Prod. Res. , vol.46 , Issue.13 , pp. 3485-3502
    • Shewchuk, J.P.1
  • 34
    • 84953361453 scopus 로고    scopus 로고
    • Assembly line balancing with hierarchical worker assignment
    • in press
    • B. Sungur, and Y. Yavuz Assembly line balancing with hierarchical worker assignment J. Manuf. Syst 2015 10.1016/j.jmsy.2014.08.004 in press
    • (2015) J. Manuf. Syst
    • Sungur, B.1    Yavuz, Y.2
  • 35
    • 33745870883 scopus 로고    scopus 로고
    • A master scheduling model with skilled and unskilled temporary workers
    • A. Techawiboonwong, P. Yenradee, and S.K. Das A master scheduling model with skilled and unskilled temporary workers Int J. Prod. Econ. 103 2 2006 798 809
    • (2006) Int J. Prod. Econ. , vol.103 , Issue.2 , pp. 798-809
    • Techawiboonwong, A.1    Yenradee, P.2    Das, S.K.3
  • 36
    • 0036466520 scopus 로고    scopus 로고
    • Workforce planning in synchronous production systems
    • G.L. Vairaktarakis, X. Cai, and C.-Y. Lee Workforce planning in synchronous production systems Eur. J. Oper. Res. 136 1 2002 551 572
    • (2002) Eur. J. Oper. Res. , vol.136 , Issue.1 , pp. 551-572
    • Vairaktarakis, G.L.1    Cai, X.2    Lee, C.-Y.3
  • 37
    • 53349089869 scopus 로고    scopus 로고
    • Evaluation of performance measures for representing operational objectives of a mixed model assembly line balancing problem
    • J. Venkatesh Evaluation of performance measures for representing operational objectives of a mixed model assembly line balancing problem Int. J. Prod. Res. 46 2008 6367 6388
    • (2008) Int. J. Prod. Res. , vol.46 , pp. 6367-6388
    • Venkatesh, J.1
  • 38
    • 0022441646 scopus 로고
    • Formulation of a problem involving assembly lines with multiple manning of work stations
    • J.M. Wilson Formulation of a problem involving assembly lines with multiple manning of work stations Int. J. Prod. Res. 24 1 1986 59 63
    • (1986) Int. J. Prod. Res. , vol.24 , Issue.1 , pp. 59-63
    • Wilson, J.M.1
  • 39
    • 84883466367 scopus 로고    scopus 로고
    • Reducing worker(s) by converting assembly line into a pure cell system
    • Y. Yu, J. Tang, W. Sun, Y. Yin, and I. Kaku Reducing worker(s) by converting assembly line into a pure cell system Int J. Prod. Econ. 145 2 2013 799 806
    • (2013) Int J. Prod. Econ. , vol.145 , Issue.2 , pp. 799-806
    • Yu, Y.1    Tang, J.2    Sun, W.3    Yin, Y.4    Kaku, I.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.