-
1
-
-
77954435156
-
Mathematical Programming Model for Centralised Master Planning in Ceramic Tile Supply Chains
-
Alemany, M. M. E., J. J., Boj, J., Mula, and F.-C., Lario. 2009. “Mathematical Programming Model for Centralised Master Planning in Ceramic Tile Supply Chains.” International Journal of Production Research 48 (17): 5053–5074. doi:10.1080/00207540903055701.
-
(2009)
International Journal of Production Research
, vol.48
, Issue.17
, pp. 5053-5074
-
-
Alemany, M.M.E.1
Boj, J.J.2
Mula, J.3
Lario, F.-C.4
-
2
-
-
70449686075
-
Workload Simulation and Optimisation in Multi-Criteria Hybrid Flowshop Scheduling: A Case Study
-
Alfieri, A., 2009. “Workload Simulation and Optimisation in Multi-Criteria Hybrid Flowshop Scheduling: A Case Study.” International Journal of Production Research 47 (18): 5129–5145. doi:10.1080/00207540802010823.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.18
, pp. 5129-5145
-
-
Alfieri, A.1
-
3
-
-
69249213639
-
On-Line Integrated Production-Distribution Scheduling Problems with Capacitated Deliveries
-
Averbakh, I., 2009. “On-Line Integrated Production-Distribution Scheduling Problems with Capacitated Deliveries.” European Journal of Operational Research 200 (2): 377–384. doi:10.1016/j.ejor.2008.12.030.
-
(2009)
European Journal of Operational Research
, vol.200
, Issue.2
, pp. 377-384
-
-
Averbakh, I.1
-
4
-
-
77951141667
-
A Hybrid GA-Simulation Approach to Improve JIT Systems
-
Azadeh, A., V., Ebrahimipour, and P., Bavar. 2009. “A Hybrid GA-Simulation Approach to Improve JIT Systems.” International Journal of Production Research 48 (8): 2323–2344. doi:10.1080/00207540802676441.
-
(2009)
International Journal of Production Research
, vol.48
, Issue.8
, pp. 2323-2344
-
-
Azadeh, A.1
Ebrahimipour, V.2
Bavar, P.3
-
5
-
-
0003990308
-
-
3rd ed, Upper Saddle River, NJ: Prentice-Hall Inc., and
-
Banks, J., J. S., Carson, B. L., Nelson, and D. M., Nicol. 2000. Discrete-Event System Simulation. 3rd ed. Upper Saddle River, NJ: Prentice-Hall Inc.
-
(2000)
Discrete-Event System Simulation
-
-
Banks, J.1
Carson, J.S.2
Nelson, B.L.3
Nicol, D.M.4
-
6
-
-
84904464337
-
How Virtualization, Decentralization and Network Building Change the Manufacturing Landscape: An Industry 4.0 Perspective
-
scholar.waset.org/1999.8/9997144, and
-
Brettel, M., N., Friederichsen, M., Keller, and M., Rosenberg. 2014. “How Virtualization, Decentralization and Network Building Change the Manufacturing Landscape: An Industry 4.0 Perspective.” International Journal of Mechanical, Industrial Science and Engineering 8 (1): 37–44. doi:scholar.waset.org/1999.8/9997144.
-
(2014)
International Journal of Mechanical, Industrial Science and Engineering
, vol.8
, Issue.1
-
-
Brettel, M.1
Friederichsen, N.2
Keller, M.3
Rosenberg, M.4
-
7
-
-
84890456224
-
Genetic Algorithm Modification for Production Scheduling
-
Brzeczek, T., and D., Nowak. 2013. “Genetic Algorithm Modification for Production Scheduling.” Foundations of Computing and Decision Sciences 38 (4): 299–309. doi:10.2478/fcds-2013-0015.
-
(2013)
Foundations of Computing and Decision Sciences
, vol.38
, Issue.4
, pp. 299-309
-
-
Brzeczek, T.1
Nowak, D.2
-
8
-
-
0032638699
-
Production Planning Using a Hybrid Simulation–Analytical Approach
-
Byrne, M. D., and M. A., Bakir. 1999. “Production Planning Using a Hybrid Simulation–Analytical Approach.” International Journal of Production Economics 59 (1–3): 305–311. doi:10.1016/S0925-5273(98)00104-2.
-
(1999)
International Journal of Production Economics
, vol.59
, Issue.1-3
, pp. 305-311
-
-
Byrne, M.D.1
Bakir, M.A.2
-
9
-
-
84865023286
-
Designing a Collaborative Supply-Chain Plan Using the Analytic Hierarchy Process and Genetic Algorithm with Cycle-Time Estimation
-
Che, Z. H., and T.-A., Chiang. 2012. “Designing a Collaborative Supply-Chain Plan Using the Analytic Hierarchy Process and Genetic Algorithm with Cycle-Time Estimation.” International Journal of Production Research 50 (16): 4426–4443. doi:10.1080/00207543.2011.598884.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.16
, pp. 4426-4443
-
-
Che, Z.H.1
Chiang, T.-A.2
-
10
-
-
33744826037
-
Order Assignment and Scheduling in a Supply Chain
-
Chen, Z.-L., and G., Pundoor. 2006. “Order Assignment and Scheduling in a Supply Chain.” Operations Research 54: 555–572. doi:10.1287/opre.1060.0280.
-
(2006)
Operations Research
, vol.54
, pp. 555-572
-
-
Chen, Z.-L.1
Pundoor, G.2
-
11
-
-
22544461035
-
Integrated Scheduling of Production and Distribution Operations
-
Chen, Z.-L., and G. L., Vairaktarakis. 2005. “Integrated Scheduling of Production and Distribution Operations.” Management Science 51 (4): 614–628. doi:10.1287/mnsc.1040.0325.
-
(2005)
Management Science
, vol.51
, Issue.4
, pp. 614-628
-
-
Chen, Z.-L.1
Vairaktarakis, G.L.2
-
12
-
-
84928663541
-
Integrated Scheduling of Production and Distribution to Minimize Total Cost Using an Improved Ant Colony Optimization Method
-
Cheng, B.-Y., J. Y.-T., Leung, and K., Li. 2015. “Integrated Scheduling of Production and Distribution to Minimize Total Cost Using an Improved Ant Colony Optimization Method.” Computers & Industrial Engineering 83: 217–225. doi:10.1016/j.cie.2015.02.017.
-
(2015)
Computers & Industrial Engineering
, vol.83
, pp. 217-225
-
-
Cheng, B.-Y.1
Leung, J.Y.T.2
Li, K.3
-
13
-
-
80053624925
-
A Two-Level Genetic Algorithm to Determine Production Frequencies for Economic Lot Scheduling Problem
-
Chung, S. H., and H. K., Chan. 2012. “A Two-Level Genetic Algorithm to Determine Production Frequencies for Economic Lot Scheduling Problem.” IEEE Transactions on Industrial Electronics 59 (1): 611–619. doi:10.1109/TIE.2011.2130498.
-
(2012)
IEEE Transactions on Industrial Electronics
, vol.59
, Issue.1
, pp. 611-619
-
-
Chung, S.H.1
Chan, H.K.2
-
14
-
-
77957854576
-
Genetic Algorithms for Coordinated Scheduling of Production and Air Transportation
-
Delavar, M. R., M., Hajiaghaei-Keshteli, and S., Molla-Alizadeh-Zavardehi. 2010. “Genetic Algorithms for Coordinated Scheduling of Production and Air Transportation.” Expert Systems with Applications 37 (12): 8255–8266. doi:10.1016/j.eswa.2010.05.060.
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.12
, pp. 8255-8266
-
-
Delavar, M.R.1
Hajiaghaei-Keshteli, M.2
Molla-Alizadeh-Zavardehi, S.3
-
15
-
-
33847080062
-
Negotiation-Based Collaborative Planning in Divergent Two-Tier Supply Chains
-
Dudek, G., and H., Stadtler. 2007. “Negotiation-Based Collaborative Planning in Divergent Two-Tier Supply Chains.” International Journal of Production Research 45 (2): 465–484. doi:10.1080/00207540600584821.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.2
, pp. 465-484
-
-
Dudek, G.1
Stadtler, H.2
-
16
-
-
84939961178
-
Graph-Based Integrated Production and Intermodal Transport Scheduling with Capacity Restrictions
-
Ehm, J., B., Scholz-Reiter, T., Makuschewitz, and E. M., Frazzon. 2015. “Graph-Based Integrated Production and Intermodal Transport Scheduling with Capacity Restrictions.” CIRP Journal of Manufacturing Science and Technology 9: 23–30. doi:10.1016/j.cirpj.2015.01.007.
-
(2015)
CIRP Journal of Manufacturing Science and Technology
, vol.9
, pp. 23-30
-
-
Ehm, J.1
Scholz-Reiter, B.2
Makuschewitz, T.3
Frazzon, E.M.4
-
17
-
-
84858066293
-
Genetic Algorithm Optimisation of an Integrated Aggregate Production–Distribution Plan in Supply Chains
-
Fahimnia, B., L., Luong, and R., Marian. 2012. “Genetic Algorithm Optimisation of an Integrated Aggregate Production–Distribution Plan in Supply Chains.” International Journal of Production Research 50 (1): 81–96. doi:10.1080/00207543.2011.571447.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.1
, pp. 81-96
-
-
Fahimnia, B.1
Luong, L.2
Marian, R.3
-
18
-
-
84902535996
-
Hybrid Simulation–Optimization Methods: A Taxonomy and Discussion
-
Figueira, G., and B., Almada-Lobo. 2014. “Hybrid Simulation–Optimization Methods: A Taxonomy and Discussion.” Simulation Modelling Practice and Theory 46: 118–134. doi:10.1016/j.simpat.2014.03.007.
-
(2014)
Simulation Modelling Practice and Theory
, vol.46
, pp. 118-134
-
-
Figueira, G.1
Almada-Lobo, B.2
-
19
-
-
84925536248
-
Integrierte Wertschöpfungsnetzwerke –Chancen und Potenziale durch Industrie 4.0
-
Forstner, L., and M., Dümmler. 2014. “Integrierte Wertschöpfungsnetzwerke –Chancen und Potenziale durch Industrie 4.0.” E & I Elektrotechnik Und Informationstechnik 131 (7): 199–201. doi:10.1007/s00502-014-0224-y.
-
(2014)
E & I Elektrotechnik Und Informationstechnik
, vol.131
, Issue.7
, pp. 199-201
-
-
Forstner, L.1
Dümmler, M.2
-
20
-
-
84992313152
-
Simulation-Based Optimization for the Integrated Scheduling of Production and Logistic Systems
-
Frazzon, E. M., A., Albrecht, and P. A., Hurtado. 2016. “Simulation-Based Optimization for the Integrated Scheduling of Production and Logistic Systems.” IFAC-PapersOnLine 49 (12): 1050–1055. doi:10.1016/j.ifacol.2016.07.581.
-
(2016)
IFAC-PapersOnLine
, vol.49
, Issue.12
, pp. 1050-1055
-
-
Frazzon, E.M.1
Albrecht, A.2
Hurtado, P.A.3
-
21
-
-
84953889157
-
Hybrid Modelling Approach for the Scheduling and Control of Integrated Production and Logistic Processes along Export Supply Chains
-
Frazzon, E. M., A., Albrecht, P. A., Hurtado, L., de Souza Silva, and J., Pannek. 2015. “Hybrid Modelling Approach for the Scheduling and Control of Integrated Production and Logistic Processes along Export Supply Chains.” IFAC-PapersOnLine 48 (3): 1521–1526. doi:10.1016/j.ifacol.2015.06.302.
-
(2015)
IFAC-PapersOnLine
, vol.48
, Issue.3
, pp. 1521-1526
-
-
Frazzon, E.M.1
Albrecht, A.2
Hurtado, P.A.3
de Souza Silva, L.4
Pannek, J.5
-
22
-
-
84976556349
-
Automatic Design of Scheduling Rules for Complex Manufacturing Systems by Multi-Objective Simulation-Based Optimization
-
Freitag, M., and T., Hildebrandt. 2016. “Automatic Design of Scheduling Rules for Complex Manufacturing Systems by Multi-Objective Simulation-Based Optimization.” CIRP-Annals - Manufacturing Technology 65 (1): 433–436. doi:10.1016/j.cirp.2016.04.066.
-
(2016)
CIRP-Annals - Manufacturing Technology
, vol.65
, Issue.1
, pp. 433-436
-
-
Freitag, M.1
Hildebrandt, T.2
-
23
-
-
84900478313
-
Spare Parts Supply Chains’ Operational Planning Using Technical Condition Information from Intelligent Maintenance Systems
-
Frazzon, E. M., E., Israel, A., Albrecht, C. E., Pereira, and B., Hellingrath. 2014. “Spare Parts Supply Chains’ Operational Planning Using Technical Condition Information from Intelligent Maintenance Systems.” Annual Reviews in Control 38 (1): 147–154. doi:10.1016/j.arcontrol.2014.03.014.
-
(2014)
Annual Reviews in Control
, vol.38
, Issue.1
, pp. 147-154
-
-
Frazzon, E.M.1
Israel, E.2
Albrecht, A.3
Pereira, C.E.4
Hellingrath, B.5
-
24
-
-
85014300299
-
Research on Optimization Method of Real-Time Available Resources for Dynamic Scheduling
-
Ge, J. H., H., Gao, Y. P., Wang, P. Q., Fu, and C. T., Zhang. 2014. “Research on Optimization Method of Real-Time Available Resources for Dynamic Scheduling.” International Journal of Database Theory and Application 7 (2): 91–98. doi:10.14257/ijdta.2014.7.2.09
-
(2014)
International Journal of Database Theory and Application
, vol.7
, Issue.2
-
-
Ge, J.H.1
Gao, H.2
Wang, Y.P.3
Fu, P.Q.4
Zhang, C.T.5
-
25
-
-
61349164254
-
The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan
-
Geismar, H. N., G., Laporte, L., Lei, and C., Sriskandarajah. 2008. “The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan.” INFORMS Journal on Computing 20 (1): 21–33. doi:10.1287/ijoc.1060.0208.
-
(2008)
INFORMS Journal on Computing
, vol.20
, Issue.1
, pp. 21-33
-
-
Geismar, H.N.1
Laporte, G.2
Lei, L.3
Sriskandarajah, C.4
-
26
-
-
0035019837
-
Scheduling with Fixed Delivery Dates
-
Hall, N. G., M., Lesaoana, and C. N., Potts. 2001. “Scheduling with Fixed Delivery Dates.” Operations Research 49 (1): 134–144. doi:10.1287/opre.49.1.134.11192.
-
(2001)
Operations Research
, vol.49
, Issue.1
, pp. 134-144
-
-
Hall, N.G.1
Lesaoana, M.2
Potts, C.N.3
-
27
-
-
2342539189
-
Supply Chain Scheduling: Batching and Delivery
-
Hall, N. G., and C. N., Potts. 2003. “Supply Chain Scheduling: Batching and Delivery.” Operations Research 51 (4): 566–584. doi:10.1287/opre.51.4.566.16106.
-
(2003)
Operations Research
, vol.51
, Issue.4
, pp. 566-584
-
-
Hall, N.G.1
Potts, C.N.2
-
28
-
-
85006982612
-
A Genetic Algorithm for the Integrated Scheduling of Production and Transport Systems
-
Heidelberg: Springer Berlin Heidelberg, and,.” In, edited by, and
-
Hartmann, J., T., Makuschewitz, E. M., Frazzon, and B., Scholz-Reiter. 2012. “A Genetic Algorithm for the Integrated Scheduling of Production and Transport Systems.” In Operations Research Proceedings, edited by S., Helber, M., Breitner, D., Rösch, C., Schön, J.-M., Graf von der Schulenburg, P., Sibbertsen, M., Steinbach, S., Weber, and A., Wolter, 533–539. Heidelberg: Springer Berlin Heidelberg. doi:10.1007/978-3-319-00795-3_80.
-
(2012)
Operations Research Proceedings
-
-
Hartmann, J.1
Makuschewitz, T.2
Frazzon, E.M.3
Scholz-Reiter, B.4
Helber, S.5
Breitner, M.6
Rösch, D.7
Schön, C.8
Graf von der Schulenburg, J.-M.9
Sibbertsen, P.10
Steinbach, M.11
Weber, S.12
Wolter, A.13
-
29
-
-
85028205324
-
Simulation-Based Heuristic Method for Container Supply Chain Network Optimization
-
He, J., Y., Huang, and D., Chang. 2015. “Simulation-Based Heuristic Method for Container Supply Chain Network Optimization.” Advanced Engineering Informatics 29 (3): 339–354. doi:10.1016/j.aei.2014.08.001.
-
(2015)
Advanced Engineering Informatics
, vol.29
, Issue.3
, pp. 339-354
-
-
He, J.1
Huang, Y.2
Chang, D.3
-
30
-
-
84860510521
-
Applicability of Optimal Control Theory to Adaptive Supply Chain Planning and Scheduling
-
Ivanov, D., A., Dolgui, and B., Sokolov. 2012. “Applicability of Optimal Control Theory to Adaptive Supply Chain Planning and Scheduling.” Annual Reviews in Control 36 (1): 73–84. doi:10.1016/j.arcontrol.2012.03.006.
-
(2012)
Annual Reviews in Control
, vol.36
, Issue.1
, pp. 73-84
-
-
Ivanov, D.1
Dolgui, A.2
Sokolov, B.3
-
31
-
-
84955677643
-
A Dynamic Model and an Algorithm for Short-Term Supply Chain Scheduling in the Smart Factory Industry 4.0
-
Ivanov, D., A., Dolgui, B., Sokolov, F., Werner, and M., Ivanova. 2016. “A Dynamic Model and an Algorithm for Short-Term Supply Chain Scheduling in the Smart Factory Industry 4.0.” International Journal of Production Research 54 (2): 386–402. doi:10.1080/00207543.2014.999958.
-
(2016)
International Journal of Production Research
, vol.54
, Issue.2
, pp. 386-402
-
-
Ivanov, D.1
Dolgui, A.2
Sokolov, B.3
Werner, F.4
Ivanova, M.5
-
32
-
-
84916611913
-
Integration of Aggregate Distribution and Dynamic Transportation Planning in a Supply Chain with Capacity Disruptions and the Ripple Effect Consideration
-
Ivanov, D., R., Hartl, A., Dolgui, A., Pavlov, and B., Sokolov. 2014. “Integration of Aggregate Distribution and Dynamic Transportation Planning in a Supply Chain with Capacity Disruptions and the Ripple Effect Consideration.” International Journal of Production Research 53 (23): 6963–6979. doi:10.1080/00207543.2014.986303.
-
(2014)
International Journal of Production Research
, vol.53
, Issue.23
, pp. 6963-6979
-
-
Ivanov, D.1
Hartl, R.2
Dolgui, A.3
Pavlov, A.4
Sokolov, B.5
-
33
-
-
84868227712
-
Structure Dynamics Control Approach to Supply Chain Planning and Adaptation
-
Ivanov, D., and B., Sokolov. 2012. “Structure Dynamics Control Approach to Supply Chain Planning and Adaptation.” International Journal of Production Research 50 (21): 6133–6149. doi:10.1080/00207543.2012.693641.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.21
, pp. 6133-6149
-
-
Ivanov, D.1
Sokolov, B.2
-
34
-
-
84884544890
-
Dual Problem Formulation and Its Application to Optimal Redesign of an Integrated Production–Distribution Network with Structure Dynamics and Ripple Effect Considerations
-
Ivanov, D., B., Sokolov, and A., Pavlov. 2013. “Dual Problem Formulation and Its Application to Optimal Redesign of an Integrated Production–Distribution Network with Structure Dynamics and Ripple Effect Considerations.” International Journal of Production Research 51 (18): 5386–5403. doi:10.1080/00207543.2013.774503.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.18
, pp. 5386-5403
-
-
Ivanov, D.1
Sokolov, B.2
Pavlov, A.3
-
35
-
-
84926380593
-
A Review of Simheuristics: Extending Metaheuristics to Deal with Stochastic Combinatorial Optimization Problems
-
Juan, A. A., J., Faulin, S. E., Grasman, M., Rabe, and G., Figueira. 2015. “A Review of Simheuristics: Extending Metaheuristics to Deal with Stochastic Combinatorial Optimization Problems.” Operations Research Perspectives 2: 62–72. doi:10.1016/j.orp.2015.03.001.
-
(2015)
Operations Research Perspectives
, vol.2
, pp. 62-72
-
-
Juan, A.A.1
Faulin, J.2
Grasman, S.E.3
Rabe, M.4
Figueira, G.5
-
36
-
-
4143144381
-
A Simulation Based Optimization Approach to Supply Chain Management under Demand Uncertainty
-
Jung, J. Y., G., Blau, J. F., Pekny, G. V., Reklaitis, and D., Eversdyk. 2004. “A Simulation Based Optimization Approach to Supply Chain Management under Demand Uncertainty.” Computers & Chemical Engineering 28 (10): 2087–2106. doi:10.1016/j.compchemeng.2004.06.006.
-
(2004)
Computers & Chemical Engineering
, vol.28
, Issue.10
, pp. 2087-2106
-
-
Jung, J.Y.1
Blau, G.2
Pekny, J.F.3
Reklaitis, G.V.4
Eversdyk, D.5
-
37
-
-
52049090864
-
A Comparison of Scheduling Algorithms for Flexible Flow Shop Problems with Unrelated Parallel Machines, Setup times, and Dual Criteria
-
Jungwattanakit, J., M., Reodecha, P., Chaovalitwongse, and F., Werner. 2009. “A Comparison of Scheduling Algorithms for Flexible Flow Shop Problems with Unrelated Parallel Machines, Setup times, and Dual Criteria.” Computers and Operations Research 36 (2): 358–378. doi:10.1016/j.cor.2007.10.004.
-
(2009)
Computers and Operations Research
, vol.36
, Issue.2
, pp. 358-378
-
-
Jungwattanakit, J.1
Reodecha, M.2
Chaovalitwongse, P.3
Werner, F.4
-
38
-
-
84979561827
-
The Coordinated Production and Transportation Scheduling Problem with a Time-Sensitive Product: A Branch and-Cut Algorithm
-
Karaoğlan, İ., and S. E., Kesen. 2017. “The Coordinated Production and Transportation Scheduling Problem with a Time-Sensitive Product: A Branch and-Cut Algorithm.” International Journal of Production Research 55 (2): 536–557. doi:10.1080/00207543.2016.1213916.
-
(2017)
International Journal of Production Research
, vol.55
, Issue.2
, pp. 536-557
-
-
Karaoğlan, İ.1
Kesen, S.E.2
-
39
-
-
84876477886
-
An Evolutionary Simulation-Based Optimization Approach for Dispatching Scheduling
-
Korytkowski, P., T., Wiśniewski, and S., Rymaszewski. 2013. “An Evolutionary Simulation-Based Optimization Approach for Dispatching Scheduling.” Simulation Modelling Practice and Theory 35: 69–85. doi:10.1016/j.simpat.2013.03.006.
-
(2013)
Simulation Modelling Practice and Theory
, vol.35
, pp. 69-85
-
-
Korytkowski, P.1
Wiśniewski, T.2
Rymaszewski, S.3
-
41
-
-
85014295185
-
Potential of Data-Driven Simulation-Based Optimization for Adaptive Scheduling and Control of Dynamic Manufacturing Systems
-
Piscataway, NJ: Institute of Electrical and Electronics Engineers, Inc, and,.” In, edited by, and
-
Kück M., J., Ehm, T., Hildebrandt, M., Freitag, and E. M., Frazzon. 2016. “Potential of Data-Driven Simulation-Based Optimization for Adaptive Scheduling and Control of Dynamic Manufacturing Systems.” In Proceedings of the 2016 Winter Simulation Conference, edited by T. M. K., Roeder, P. I., Frazier, R., Szechtman, E., Zhou, T., Huschka, and S. E., Chick, 2820–2831. Piscataway, NJ: Institute of Electrical and Electronics Engineers, Inc. https://dl.acm.org/citation.cfm?id=3042445.
-
(2016)
Proceedings of the 2016 Winter Simulation Conference
-
-
Kück, M.1
Ehm, J.2
Hildebrandt, T.3
Freitag, M.4
Frazzon, E.M.5
Roeder, T.M.K.6
Frazier, P.I.7
Szechtman, R.8
Zhou, E.9
Huschka, T.10
Chick, S.E.11
-
42
-
-
84899434135
-
A Genetic Algorithm to Optimize Lazy Learning Parameters for the Prediction of Customer Demands
-
Miami, FL: IEEE Computer Society, and,.” In, edited by, and
-
Kück, M., and B., Scholz-Reiter. 2013. “A Genetic Algorithm to Optimize Lazy Learning Parameters for the Prediction of Customer Demands.” In Proceedings of the 12th IEEE International Conference on Machine Learning and Applications (ICMLA), edited by M. A., Wani, G., Tecuci, M., Boicu, M., Kubat, T. M., Khoshgoftaar, and N., Seliya, 160–165. Miami, FL: IEEE Computer Society. doi:10.1109/ICMLA.2013.183.
-
(2013)
Proceedings of the 12th IEEE International Conference on Machine Learning and Applications (ICMLA)
-
-
Kück, M.1
Scholz-Reiter, B.2
Wani, M.A.3
Tecuci, G.4
Boicu, M.5
Kubat, M.6
Khoshgoftaar, T.M.7
Seliya, N.8
-
43
-
-
78651267281
-
OSGi-Based Services Architecture for Cyber-Physical Home Control Systems
-
Lai, C.-F., Y.-W., Ma, S.-Y., Chang, H.-C., Chao, and Y.-M., Huang. 2011. “OSGi-Based Services Architecture for Cyber-Physical Home Control Systems.” Computer Communications 34 (2): 184–191. doi:10.1016/j.comcom.2010.03.034.
-
(2011)
Computer Communications
, vol.34
, Issue.2
, pp. 184-191
-
-
Lai, C.-F.1
Ma, Y.-W.2
Chang, S.-Y.3
Chao, H.-C.4
Huang, Y.-M.5
-
44
-
-
84926457128
-
Industry 4.0
-
4)
-
Lasi, H., P., Fettke, H.-G., Kemper, T., Feld, and M., Hoffmann. 2014. “Industry 4.0.” Business & Information Systems Engineering 6 (4): 239–242.
-
(2014)
Business & Information Systems Engineering
, vol.6
, pp. 239-242
-
-
Lasi, H.1
Fettke, P.2
Kemper, H.-G.3
Feld, T.4
Hoffmann, M.5
-
45
-
-
0344427189
-
Machine Scheduling with Transportation Considerations
-
Lee, C. Y., and Z. L., Chen. 2001. “Machine Scheduling with Transportation Considerations.” Journal of Scheduling 4 (1): 3–24. doi:10.1007/s11576-014-0424-4.
-
(2001)
Journal of Scheduling
, vol.4
, Issue.1
, pp. 3-24
-
-
Lee, C.Y.1
Chen, Z.L.2
-
46
-
-
0034429116
-
Optimal Production-Distribution Planning in Supply Chain Management Using a Hybrid Simulation-Analytic Approach
-
Society for Computer Simulation International, and,.” In
-
Lee, Y. H., and S. H., Kim. 2000. “Optimal Production-Distribution Planning in Supply Chain Management Using a Hybrid Simulation-Analytic Approach.” In Proceedings of the 32nd conference on Winter simulation, 1252–1259. Society for Computer Simulation International.
-
(2000)
Proceedings of the 32nd conference on Winter simulation
, pp. 1252-1259
-
-
Lee, Y.H.1
Kim, S.H.2
-
47
-
-
0036267651
-
Production-Distribution Planning in Supply Chain Using a Hybrid Approach
-
Lee, Y. H., S. H., Kim, and C., Moon. 2002. “Production-Distribution Planning in Supply Chain Using a Hybrid Approach.” Production Planning & Control 13 (1): 35–46. doi:10.1080/09537280110061566.
-
(2002)
Production Planning & Control
, vol.13
, Issue.1
, pp. 35-46
-
-
Lee, Y.H.1
Kim, S.H.2
Moon, C.3
-
48
-
-
2442652937
-
Production and Inter-Facility Transportation Scheduling for a Process Industry
-
de Matta, R., and T., Miller. 2004. “Production and Inter-Facility Transportation Scheduling for a Process Industry.” European Journal of Operational Research 158 (1): 72–88. doi:10.1016/S0377-2217(03)00358-8.
-
(2004)
European Journal of Operational Research
, vol.158
, Issue.1
, pp. 72-88
-
-
de Matta, R.1
Miller, T.2
-
49
-
-
84887586396
-
Integrated Production and Intermodal Transportation Planning in Large Scale Production–Distribution-Networks
-
Meisel, F., T., Kirschstein, and C., Bierwirth. 2013. “Integrated Production and Intermodal Transportation Planning in Large Scale Production–Distribution-Networks.” Transportation Research Part E: Logistics and Transportation Review 60: 62–78. doi:10.1016/j.tre.2013.10.003.
-
(2013)
Transportation Research Part E: Logistics and Transportation Review
, vol.60
, pp. 62-78
-
-
Meisel, F.1
Kirschstein, T.2
Bierwirth, C.3
-
51
-
-
38749093302
-
Simulation-Based Optimization of a Single-Stage Failure-Prone Manufacturing System with Transportation Delay
-
Mourani, I., S., Hennequin, and X., Xie. 2008. “Simulation-Based Optimization of a Single-Stage Failure-Prone Manufacturing System with Transportation Delay.” International Journal of Production Economics 112 (1): 26–36. doi:10.1016/j.ijpe.2006.08.014.
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.1
, pp. 26-36
-
-
Mourani, I.1
Hennequin, S.2
Xie, X.3
-
52
-
-
75149119642
-
Mathematical Programming Models for Supply Chain Production and Transport Planning
-
Mula, J., D., Peidro, M., Díaz-Madroñero, and E., Vicens. 2010. “Mathematical Programming Models for Supply Chain Production and Transport Planning.” European Journal of Operational Research 204 (3): 377–390. doi:10.1016/j.ejor.2009.09.008.
-
(2010)
European Journal of Operational Research
, vol.204
, Issue.3
, pp. 377-390
-
-
Mula, J.1
Peidro, D.2
Díaz-Madroñero, M.3
Vicens, E.4
-
53
-
-
84869508738
-
Hybrid Simulation Based Optimization Approach for Supply Chain Management
-
Nikolopoulou, A., and M. G., Ierapetritou. 2012. “Hybrid Simulation Based Optimization Approach for Supply Chain Management.” Computers & Chemical Engineering 47: 183–193. doi:10.1016/j.compchemeng.2012.06.045.
-
(2012)
Computers & Chemical Engineering
, vol.47
, pp. 183-193
-
-
Nikolopoulou, A.1
Ierapetritou, M.G.2
-
55
-
-
79955411356
-
Genetic Algorithms
-
Gendreau M., Potvin J.-Y., (eds), New York: Springer,.” In, edited by
-
Reeves, C., 2010. “Genetic Algorithms.” In Handbook of Metaheuristics, edited by M., Gendreau and J.-Y., Potvin, 109–139. New York: Springer.10.1007/978-1-4419-1665-5
-
(2010)
Handbook of Metaheuristics
, pp. 109-139
-
-
Reeves, C.1
-
56
-
-
84906246506
-
Synchronous and Asynchronous Decision Making Strategies in Supply Chains
-
Sahay, N., M., Ierapetritou, and J., Wassick. 2014. “Synchronous and Asynchronous Decision Making Strategies in Supply Chains.” Computers & Chemical Engineering 71: 116–129. doi:10.1016/j.compchemeng.2014.07.005.
-
(2014)
Computers & Chemical Engineering
, vol.71
, pp. 116-129
-
-
Sahay, N.1
Ierapetritou, M.2
Wassick, J.3
-
57
-
-
0033344267
-
A Review of Integrated Analysis of Production-Distribution Systems
-
Sarmiento, A. M., and R., Nagi. 1999. “A Review of Integrated Analysis of Production-Distribution Systems.” IIE Transactions 31 (11): 1061–1074. doi:10.1023/A:1007623508610.
-
(1999)
IIE Transactions
, vol.31
, Issue.11
, pp. 1061-1074
-
-
Sarmiento, A.M.1
Nagi, R.2
-
58
-
-
84954382374
-
On the Risk-Averse Optimization of Service Level in a Supply Chain under Disruption Risks
-
Sawik, T., 2016. “On the Risk-Averse Optimization of Service Level in a Supply Chain under Disruption Risks.” International Journal of Production Research 54 (1): 98–113. doi:10.1080/00207543.2015.1016192.
-
(2016)
International Journal of Production Research
, vol.54
, Issue.1
, pp. 98-113
-
-
Sawik, T.1
-
59
-
-
84925485196
-
Making Existing Production Systems Industry 4.0-Ready
-
Schlechtendahl, J., M., Keinert, F., Kretschmer, A., Lechler, and A., Verl. 2015. “Making Existing Production Systems Industry 4.0-Ready.” Production Engineering 9 (1): 143–148. doi:10.1007/s11740-014-0586-3.
-
(2015)
Production Engineering
, vol.9
, Issue.1
, pp. 143-148
-
-
Schlechtendahl, J.1
Keinert, M.2
Kretschmer, F.3
Lechler, A.4
Verl, A.5
-
60
-
-
77953650191
-
Integrating Manufacturing and Logistic Systems along Global Supply Chains
-
Scholz-Reiter, B., E. M., Frazzon, and T., Makuschewitz. 2010. “Integrating Manufacturing and Logistic Systems along Global Supply Chains.” CIRP Journal of Manufacturing Science and Technology 2 (3): 216–223. doi:10.1016/j.cirpj.2010.03.003.
-
(2010)
CIRP Journal of Manufacturing Science and Technology
, vol.2
, Issue.3
, pp. 216-223
-
-
Scholz-Reiter, B.1
Frazzon, E.M.2
Makuschewitz, T.3
-
61
-
-
56549084216
-
Online Decision Making and Automatic Decision Model Adaptation
-
Schönberger, J., and H., Kopfer. 2009. “Online Decision Making and Automatic Decision Model Adaptation.” Computers & Operations Research 36 (6): 1740–1750. doi:10.1016/j.cor.2008.04.009.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.6
, pp. 1740-1750
-
-
Schönberger, J.1
Kopfer, H.2
-
62
-
-
33745480411
-
Simulation-Based Optimization of Process Control Policies for Inventory Management in Supply Chains
-
Schwartz, J. D., W., Wang, and D. E., Rivera. 2006. “Simulation-Based Optimization of Process Control Policies for Inventory Management in Supply Chains.” Automatica 42 (8): 1311–1320. doi:10.1016/j.automatica.2006.03.019.
-
(2006)
Automatica
, vol.42
, Issue.8
, pp. 1311-1320
-
-
Schwartz, J.D.1
Wang, W.2
Rivera, D.E.3
-
63
-
-
0020844913
-
A Unifying View of Hybrid Simulation/Analytic Models and Modeling
-
Shanthikumar, J. G., and R. G., Sargent. 1983. “A Unifying View of Hybrid Simulation/Analytic Models and Modeling.” Operations Research 31 (6): 1030–1052. doi:10.1287/opre.31.6.1030.
-
(1983)
Operations Research
, vol.31
, Issue.6
, pp. 1030-1052
-
-
Shanthikumar, J.G.1
Sargent, R.G.2
-
65
-
-
56249126566
-
Production and Transportation Integration for a Make-to-Order Manufacturing Company with a Commit-to-Delivery Business Mode
-
Stecke, K. E., and X., Zhao. 2007. “Production and Transportation Integration for a Make-to-Order Manufacturing Company with a Commit-to-Delivery Business Mode.” Manufacturing & Service Operations Management 9 (2): 206–224. doi:10.1287/msom.1060.0138.
-
(2007)
Manufacturing & Service Operations Management
, vol.9
, Issue.2
, pp. 206-224
-
-
Stecke, K.E.1
Zhao, X.2
-
66
-
-
84928883120
-
Integrated Scheduling of a Multi-Product Multi-Factory Manufacturing System with Maritime Transport Limits
-
Sun, X. T., S. H., Chung, and F. T. S., Chan. 2015. “Integrated Scheduling of a Multi-Product Multi-Factory Manufacturing System with Maritime Transport Limits.” Transportation Research Part E: Logistics and Transportation Review 79: 110–127. doi:10.1016/j.tre.2015.04.002.
-
(2015)
Transportation Research Part E: Logistics and Transportation Review
, vol.79
, pp. 110-127
-
-
Sun, X.T.1
Chung, S.H.2
Chan, F.T.S.3
-
67
-
-
84876103299
-
Dynamic Mutual Adjustment Search for Supply Chain Operations Planning Co-Ordination
-
Taghipour, A., and J.-M., Frayret. 2012. “Dynamic Mutual Adjustment Search for Supply Chain Operations Planning Co-Ordination.” International Journal of Production Research 51 (9): 2715–2739. doi:10.1080/00207543.2012.737952.
-
(2012)
International Journal of Production Research
, vol.51
, Issue.9
, pp. 2715-2739
-
-
Taghipour, A.1
Frayret, J.-M.2
-
68
-
-
31744447420
-
Hybrid System Dynamic - Discrete Event Simulation-Based Architecture for Hierarchical Production Planning
-
Venkateswaran, J., and Y., Son. 2007. “Hybrid System Dynamic - Discrete Event Simulation-Based Architecture for Hierarchical Production Planning.” International Journal of Production Research 43 (20): 4397–4429. doi:10.1080/00207540500142472.
-
(2007)
International Journal of Production Research
, vol.43
, Issue.20
, pp. 4397-4429
-
-
Venkateswaran, J.1
Son, Y.2
-
69
-
-
79960924365
-
From Wireless Sensor Networks towards Cyber Physical Systems
-
Wu, F.-J., Y.-F., Kao, and Y.-C., Tseng. 2011. “From Wireless Sensor Networks towards Cyber Physical Systems.” Pervasive and Mobile Computing 7 (4): 397–413. doi:10.1016/j.pmcj.2011.03.003.
-
(2011)
Pervasive and Mobile Computing
, vol.7
, Issue.4
, pp. 397-413
-
-
Wu, F.-J.1
Kao, Y.-F.2
Tseng, Y.-C.3
-
70
-
-
3042627175
-
Real-Time Multivehicle Truckload Pickup and Delivery Problems
-
Yang, J., P., Jaillet, and H., Mahmassani. 2004. “Real-Time Multivehicle Truckload Pickup and Delivery Problems.” Transportation Science 38 (2): 135–148. doi:10.1287/trsc.1030.0068.
-
(2004)
Transportation Science
, vol.38
, Issue.2
, pp. 135-148
-
-
Yang, J.1
Jaillet, P.2
Mahmassani, H.3
-
71
-
-
84961212942
-
Dynamic Resource Integration Optimisation of Global Distributed Manufacturing: An Embeddedness–Interaction Perspective
-
Yao, J., and Z., Deng. 2016. “Dynamic Resource Integration Optimisation of Global Distributed Manufacturing: An Embeddedness–Interaction Perspective.” International Journal of Production Research 54 (23): 1–15. doi:10.1080/00207543.2016.1154622.
-
(2016)
International Journal of Production Research
, vol.54
, Issue.23
, pp. 1-15
-
-
Yao, J.1
Deng, Z.2
-
72
-
-
70449530606
-
Hybrid Algorithm for Discrete Event Simulation Based Supply Chain Optimization
-
Yoo, T., H., Cho, and E., Yücesan. 2010. “Hybrid Algorithm for Discrete Event Simulation Based Supply Chain Optimization.” Expert Systems with Applications 37 (3): 2354–2361. doi:10.1016/j.eswa.2009.07.039.
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.3
, pp. 2354-2361
-
-
Yoo, T.1
Cho, H.2
Yücesan, E.3
-
73
-
-
77949490486
-
A Novel Genetic Algorithm for Solving Production and Transportation Scheduling in a Two-Stage Supply Chain
-
Zegordi, S. H., I. N. K., Abadi, and M. A. B., Nia. 2010. “A Novel Genetic Algorithm for Solving Production and Transportation Scheduling in a Two-Stage Supply Chain.” Computers & Industrial Engineering 58 (3): 373–381. doi:10.1016/j.cie.2009.06.012.
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.3
, pp. 373-381
-
-
Zegordi, S.H.1
Abadi, I.N.K.2
Nia, M.A.B.3
-
74
-
-
56549110421
-
Integrating Simulation and Optimization to Schedule Loading Operations in Container Terminals
-
Zeng, Q., and Z., Yang. 2009. “Integrating Simulation and Optimization to Schedule Loading Operations in Container Terminals.” Computers & Operations Research 36 (6): 1935–1944. doi:10.1016/j.cor.2008.06.010.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.6
, pp. 1935-1944
-
-
Zeng, Q.1
Yang, Z.2
|