-
2
-
-
0001088045
-
A simulation study of sequencing rules in a Kanban controlled flow shop
-
Berkley, B.J., and Kiran, A.S., 1991, A Simulation study of sequencing rules in a Kanban controlled flow shop. Decision Sciences, 21, 660-669.
-
(1991)
Decision Sciences
, vol.21
, pp. 660-669
-
-
Berkley, B.J.1
Kiran, A.S.2
-
3
-
-
84986958388
-
A review of the Kanban production control research literature
-
Berkley, B.J., 1992, A review of the Kanban production control research literature. Production and Operations Management, 1, 393-411.
-
(1992)
Production and Operations Management
, vol.1
, pp. 393-411
-
-
Berkley, B.J.1
-
4
-
-
84990578213
-
Simulation tests of FCFS and SPT sequencing in Kanban systems
-
Berkley, B.J., 1993a, Simulation tests of FCFS and SPT sequencing in Kanban systems. Decision Sciences, 24, 218-227.
-
(1993)
Decision Sciences
, vol.24
, pp. 218-227
-
-
Berkley, B.J.1
-
5
-
-
0027813686
-
Effect of buffer capacity and sequencing rules on single card Kanban system performance
-
Berkley, B.J., 1993b, Effect of buffer capacity and sequencing rules on single card Kanban system performance. International Journal of Production Research, 31, 2875-2893.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2875-2893
-
-
Berkley, B.J.1
-
6
-
-
0014807274
-
A heuristic algorithm for the n-job, m-machine sequencing problem
-
Campbell, H.G., Dudek, R.A and Smith, M.L., 1970, A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science, 16, B630-B637.
-
(1970)
Management Science
, vol.16
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
7
-
-
0017516618
-
An evaluation of flowshop sequencing heuristics
-
Dannenbring, D.G., 1977, An evaluation of flowshop sequencing heuristics. Management Science, 23, 1174-1182.
-
(1977)
Management Science
, vol.23
, pp. 1174-1182
-
-
Dannenbring, D.G.1
-
9
-
-
0017961934
-
Four simple heuristics for scheduling a flowshop
-
Gelders, F.L., and Sambandam, N., 1978, Four simple heuristics for scheduling a flowshop. International Journal of Production Research, 16, 221-231.
-
(1978)
International Journal of Production Research
, vol.16
, pp. 221-231
-
-
Gelders, F.L.1
Sambandam, N.2
-
10
-
-
0024033721
-
Using the Kanban in a job shop environment
-
Gravel, M., and Price, W. L., 1988, Using the Kanban in a job shop environment. International Journal of Production Research, 26, 1105-1118.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1105-1118
-
-
Gravel, M.1
Price, W.L.2
-
11
-
-
0003075019
-
Optimal two-and three-stage production schedules
-
Johnson, S. M., 1954, Optimal two-and three-stage production schedules. Naval Research Logistics Quarterly, I, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
12
-
-
0023562034
-
Heuristic methods for flexible flow line scheduling
-
Kochhar, S., and Morris, R.J.T., 1987, Heuristic methods for flexible flow line scheduling. Journal of Manufacturing Systems, 6, 299-314.
-
(1987)
Journal of Manufacturing Systems
, vol.6
, pp. 299-314
-
-
Kochhar, S.1
Morris, R.J.T.2
-
13
-
-
0001057408
-
Flowshop sequencing problems with limited buffer storage
-
Leisten, R., 1990, Flowshop sequencing problems with limited buffer storage. International Journal of Production Research, 28, 2085-2100.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2085-2100
-
-
Leisten, R.1
-
14
-
-
0002605720
-
Analysis for minimizing weighted mean flowtime in flowshop scheduling
-
Miyazaki, S. and Nishiyama, N., 1980, Analysis for minimizing weighted mean flowtime in flowshop scheduling. Journal of the Operations Research Society of Japan, 23, 118-132.
-
(1980)
Journal of the Operations Research Society of Japan
, vol.23
, pp. 118-132
-
-
Miyazaki, S.1
Nishiyama, N.2
-
15
-
-
0011725678
-
The optimal operation planning of Kanban to minimize the total operation cost
-
Miyazaki, S., Ohita, H., and Nishiyama, N., 1988, The optimal operation planning of Kanban to minimize the total operation cost. International Journal of Production Research, 26, 1605-1611.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1605-1611
-
-
Miyazaki, S.1
Ohita, H.2
Nishiyama, N.3
-
17
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
-
Nawaz, M., Enscore, Jr. E.E. and Ham, I., 1983, A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. Omega, 11, 91-95.
-
(1983)
Omega
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore E.E., Jr.2
Ham, I.3
-
18
-
-
0028429481
-
A review of optimisation models of Kanban based production systems
-
Price, W., Gravel, M., and Nsakanda, A. L., 1994, A review of optimisation models of Kanban based production systems. European Journal of Operational Research, 75, 1-12.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 1-12
-
-
Price, W.1
Gravel, M.2
Nsakanda, A.L.3
-
19
-
-
0027542699
-
Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
-
Rajendran, C., 1993, Heuristic algorithm for scheduling in a flowshop to minimize total flowtime. International Journal of Production Economics, 29, 65-73.
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 65-73
-
-
Rajendran, C.1
-
20
-
-
0024715082
-
A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
-
Rees, L. P., Huang, P, Y., and Taylor, B. W., 1989, A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation. International Journal of Production Research, 27, 1427-1443.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1427-1443
-
-
Rees, L.P.1
Huang, P.Y.2
Taylor, B.W.3
-
22
-
-
0025488637
-
Modelling Kanban based demand pull systems: A survey and critique
-
Uzsoy, R., and Martin-Vega, L. A., 1990, Modelling Kanban based demand pull systems: a survey and critique. Manufacturing Review. 3, 155-160.
-
(1990)
Manufacturing Review
, vol.3
, pp. 155-160
-
-
Uzsoy, R.1
Martin-Vega, L.A.2
|