Volumn 103, Issue 3, 1997, Pages 439-452

Heuristics for scheduling in a Kanban system with dual blocking mechanisms

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL METHODS; HEURISTIC METHODS; MANUFACTURE; PRODUCTION CONTROL; RECURSIVE FUNCTIONS;

EID: 0031332898     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(96)00276-7     Document Type: Article
Times cited : (12)

References (22)
  • 2
    • 0001088045 scopus 로고
    • A simulation study of sequencing rules in a Kanban controlled flow shop
    • Berkley, B.J., and Kiran, A.S., 1991, A Simulation study of sequencing rules in a Kanban controlled flow shop. Decision Sciences, 21, 660-669.
    • (1991) Decision Sciences , vol.21 , pp. 660-669
    • Berkley, B.J.1    Kiran, A.S.2
  • 3
    • 84986958388 scopus 로고
    • A review of the Kanban production control research literature
    • Berkley, B.J., 1992, A review of the Kanban production control research literature. Production and Operations Management, 1, 393-411.
    • (1992) Production and Operations Management , vol.1 , pp. 393-411
    • Berkley, B.J.1
  • 4
    • 84990578213 scopus 로고
    • Simulation tests of FCFS and SPT sequencing in Kanban systems
    • Berkley, B.J., 1993a, Simulation tests of FCFS and SPT sequencing in Kanban systems. Decision Sciences, 24, 218-227.
    • (1993) Decision Sciences , vol.24 , pp. 218-227
    • Berkley, B.J.1
  • 5
    • 0027813686 scopus 로고
    • Effect of buffer capacity and sequencing rules on single card Kanban system performance
    • Berkley, B.J., 1993b, Effect of buffer capacity and sequencing rules on single card Kanban system performance. International Journal of Production Research, 31, 2875-2893.
    • (1993) International Journal of Production Research , vol.31 , pp. 2875-2893
    • Berkley, B.J.1
  • 6
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job, m-machine sequencing problem
    • Campbell, H.G., Dudek, R.A and Smith, M.L., 1970, A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science, 16, B630-B637.
    • (1970) Management Science , vol.16
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 7
    • 0017516618 scopus 로고
    • An evaluation of flowshop sequencing heuristics
    • Dannenbring, D.G., 1977, An evaluation of flowshop sequencing heuristics. Management Science, 23, 1174-1182.
    • (1977) Management Science , vol.23 , pp. 1174-1182
    • Dannenbring, D.G.1
  • 11
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules
    • Johnson, S. M., 1954, Optimal two-and three-stage production schedules. Naval Research Logistics Quarterly, I, 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 12
  • 13
    • 0001057408 scopus 로고
    • Flowshop sequencing problems with limited buffer storage
    • Leisten, R., 1990, Flowshop sequencing problems with limited buffer storage. International Journal of Production Research, 28, 2085-2100.
    • (1990) International Journal of Production Research , vol.28 , pp. 2085-2100
    • Leisten, R.1
  • 15
  • 17
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
    • Nawaz, M., Enscore, Jr. E.E. and Ham, I., 1983, A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. Omega, 11, 91-95.
    • (1983) Omega , vol.11 , pp. 91-95
    • Nawaz, M.1    Enscore E.E., Jr.2    Ham, I.3
  • 19
    • 0027542699 scopus 로고
    • Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
    • Rajendran, C., 1993, Heuristic algorithm for scheduling in a flowshop to minimize total flowtime. International Journal of Production Economics, 29, 65-73.
    • (1993) International Journal of Production Economics , vol.29 , pp. 65-73
    • Rajendran, C.1
  • 20
    • 0024715082 scopus 로고
    • A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
    • Rees, L. P., Huang, P, Y., and Taylor, B. W., 1989, A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation. International Journal of Production Research, 27, 1427-1443.
    • (1989) International Journal of Production Research , vol.27 , pp. 1427-1443
    • Rees, L.P.1    Huang, P.Y.2    Taylor, B.W.3
  • 22
    • 0025488637 scopus 로고
    • Modelling Kanban based demand pull systems: A survey and critique
    • Uzsoy, R., and Martin-Vega, L. A., 1990, Modelling Kanban based demand pull systems: a survey and critique. Manufacturing Review. 3, 155-160.
    • (1990) Manufacturing Review , vol.3 , pp. 155-160
    • Uzsoy, R.1    Martin-Vega, L.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.