메뉴 건너뛰기




Volumn 50, Issue 10, 2012, Pages 2555-2569

A hybrid nested partitions algorithm for scheduling flexible resource in flow shop problem

Author keywords

Flow shop scheduling; Manufacturing systems; Manufacturing systems engineering; Optimisation; Resource planning; Scheduling

Indexed keywords


EID: 84992212061     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.539278     Document Type: Article
Times cited : (8)

References (36)
  • 1
    • 0006183587 scopus 로고    scopus 로고
    • A framework for machine scheduling problems with controllable processing times
    • Alidaee, B. and Kochenberger, G.A., 1996. A framework for machine scheduling problems with controllable processing times. Production and Operations Management, 5 (4), 391-405.
    • (1996) Production and Operations Management , vol.5 , Issue.4 , pp. 391-405
    • Alidaee, B.1    Kochenberger, G.A.2
  • 2
    • 0002622989 scopus 로고    scopus 로고
    • A production line that balances itself
    • Bartholdi, J.J. and Eisenstein, D.D., 1996. A production line that balances itself. Operations Research, 44 (1), 21-34.
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 21-34
    • Bartholdi, J.J.1    Eisenstein, D.D.2
  • 3
    • 84976470336 scopus 로고    scopus 로고
    • Nested partitions and its applications to the intermodal hub location problem
    • C. Wanpracha and C. Kevin, eds., New York: Springer
    • Chen, W.W., Shi, L.Y., and Pi, L., 2009. Nested partitions and its applications to the intermodal hub location problem. In: C. Wanpracha and C. Kevin, eds. Optimization and logistics challenges in the enterprise. New York: Springer, 229-250.
    • (2009) Optimization and Logistics Challenges in the Enterprise , pp. 229-250
    • Chen, W.W.1    Shi, L.Y.2    Pi, L.3
  • 4
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling parallel manufacturing cells with resource flexibility
    • Daniels, R.L., Hoopes, B.J., and Mazzola, J.B., 1996. Scheduling parallel manufacturing cells with resource flexibility. Management Science, 42 (9), 1260-1276.
    • (1996) Management Science , vol.42 , Issue.9 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 5
    • 0031527551 scopus 로고    scopus 로고
    • An analysis of heuristics for the parallel-machine flexible-resource scheduling problem
    • Daniels, R.L., Hoopes, B.J., and Mazzola, J.B., 1997. An analysis of heuristics for the parallel-machine flexible-resource scheduling problem. Annals of Operations Research, 70 (1), 439-472.
    • (1997) Annals of Operations Research , vol.70 , Issue.1 , pp. 439-472
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 6
    • 21144472862 scopus 로고
    • A tabu-search heuristic for the flexible-resource flow shop scheduling problem
    • Daniels, R.L. and Mazzola, J.B., 1993. A tabu-search heuristic for the flexible-resource flow shop scheduling problem. Annals of Operations Research, 41 (1-4), 207-230.
    • (1993) Annals of Operations Research , vol.41 , Issue.1-4 , pp. 207-230
    • Daniels, R.L.1    Mazzola, J.B.2
  • 7
    • 0028424243 scopus 로고
    • Flow shop scheduling with resource flexibility
    • Daniels, R.L. and Mazzola, J.B., 1994. Flow shop scheduling with resource flexibility. Operations Research, 42 (3), 504-522.
    • (1994) Operations Research , vol.42 , Issue.3 , pp. 504-522
    • Daniels, R.L.1    Mazzola, J.B.2
  • 8
    • 2942562347 scopus 로고    scopus 로고
    • Flow shop scheduling with partial resource flexibility
    • Daniels, R.L., Mazzola, J.B., and Shi, D., 2004. Flow shop scheduling with partial resource flexibility. Management Science, 50 (5), 658-669.
    • (2004) Management Science , vol.50 , Issue.5 , pp. 658-669
    • Daniels, R.L.1    Mazzola, J.B.2    Shi, D.3
  • 9
    • 0024769314 scopus 로고
    • Single machine scheduling with controllable processing times and number of tardy jobs
    • Daniels, R.L. and Sarin, R.K., 1989. Single machine scheduling with controllable processing times and number of tardy jobs. Operations Research, 37 (6), 981-984.
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 981-984
    • Daniels, R.L.1    Sarin, R.K.2
  • 10
    • 45949105786 scopus 로고    scopus 로고
    • A nested partitions framework for beam angle optimization in intensity-modulated radiation therapy
    • Dsouza, W.D., et al., 2008. A nested partitions framework for beam angle optimization in intensity-modulated radiation therapy. Physics in Medicine & Biology, 53 (12), 3293-3307.
    • (2008) Physics in Medicine & Biology , vol.53 , Issue.12 , pp. 3293-3307
    • Dsouza, W.D.1
  • 11
    • 0035505644 scopus 로고    scopus 로고
    • An ordinal optimization based bidding strategy for electric power suppliers in the daily energy market
    • Guan, X.H., Ho, Y.C., and Lai, F., 2001. An ordinal optimization based bidding strategy for electric power suppliers in the daily energy market. IEEE Transactions on Power Systems, 16 (4), 788-797.
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.4 , pp. 788-797
    • Guan, X.H.1    Ho, Y.C.2    Lai, F.3
  • 12
    • 33646420905 scopus 로고    scopus 로고
    • Constrained ordinal optimization - A feasibility model based approach
    • Guan, X.H., et al., 2006. Constrained ordinal optimization - A feasibility model based approach. Journal of DEDS, 16 (2), 279-299.
    • (2006) Journal of DEDS , vol.16 , Issue.2 , pp. 279-299
    • Guan, X.H.1
  • 13
    • 27844512878 scopus 로고    scopus 로고
    • Flowshop-scheduling problems with makespan criterion: A review
    • Hejazi, S.R. and Saghafian, S., 2005. Flowshop-scheduling problems with makespan criterion: A review. International Journal of Production Research, 43 (14), 2895-2929.
    • (2005) International Journal of Production Research , vol.43 , Issue.14 , pp. 2895-2929
    • Hejazi, S.R.1    Saghafian, S.2
  • 14
    • 0003009693 scopus 로고
    • Ordinal optimization of discrete event dynamic systems
    • Ho, Y.C. and Sreenivas, R.S., 1991. Ordinal optimization of discrete event dynamic systems. Journal of DEDS, 2 (2), 61-88.
    • (1991) Journal of DEDS , vol.2 , Issue.2 , pp. 61-88
    • Ho, Y.C.1    Sreenivas, R.S.2
  • 15
    • 0029290411 scopus 로고
    • Principles on the benefits of manufacturing process flexibility
    • Jordan, W.C. and Graves, S.C., 1995. Principles on the benefits of manufacturing process flexibility. Management Science, 41 (4), 577-594.
    • (1995) Management Science , vol.41 , Issue.4 , pp. 577-594
    • Jordan, W.C.1    Graves, S.C.2
  • 16
    • 0040238297 scopus 로고    scopus 로고
    • Universal alignment probabilities and subset selecting for ordinal optimization
    • Lau, T.W.E. and Ho, Y.C., 1997. Universal alignment probabilities and subset selecting for ordinal optimization. Journal of Optimization Theory and Applications, 93 (3), 455-489.
    • (1997) Journal of Optimization Theory and Applications , vol.93 , Issue.3 , pp. 455-489
    • Lau, T.W.E.1    Ho, Y.C.2
  • 17
    • 0027306874 scopus 로고
    • Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
    • Lawrence, S.R. and Morton, T.E., 1993. Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics. European Journal of Operational Research, 64 (2), 168-187.
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 168-187
    • Lawrence, S.R.1    Morton, T.E.2
  • 18
    • 0031492360 scopus 로고    scopus 로고
    • Current trends in deterministic scheduling
    • Lee, C.Y., Lei, L., and Pinedo, M., 1997. Current trends in deterministic scheduling. Annals of Operations Research, 70 (1), 1-41.
    • (1997) Annals of Operations Research , vol.70 , Issue.1 , pp. 1-41
    • Lee, C.Y.1    Lei, L.2    Pinedo, M.3
  • 19
    • 0030151930 scopus 로고    scopus 로고
    • Search heuristics for resource constrained project scheduling
    • Lee, J.K. and Kim, Y.D., 1996. Search heuristics for resource constrained project scheduling. The Journal of the Operational Research Society, 47 (5), 678-689.
    • (1996) The Journal of the Operational Research Society , vol.47 , Issue.5 , pp. 678-689
    • Lee, J.K.1    Kim, Y.D.2
  • 20
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
    • Nawaz, M., Enscore, E.J., and Ham, I., 1983. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. The International Journal of Management Science, 11 (1), 91-95.
    • (1983) The International Journal of Management Science , vol.11 , Issue.1 , pp. 91-95
    • Nawaz, M.1    Enscore, E.J.2    Ham, I.3
  • 21
    • 0034135525 scopus 로고    scopus 로고
    • A method for scheduling in parallel manufacturing systems with flexible resources
    • Olafsson, S. and Shi, L.Y., 2000. A method for scheduling in parallel manufacturing systems with flexible resources. IIE Transactions, 32 (2), 135-146.
    • (2000) IIE Transactions , vol.32 , Issue.2 , pp. 135-146
    • Olafsson, S.1    Shi, L.Y.2
  • 22
    • 0036538174 scopus 로고    scopus 로고
    • Ordinal comparison via the nested partitions method
    • Olafsson, S. and Shi, L.Y., 2002. Ordinal comparison via the nested partitions method. Discrete Event Dynamic Systems, 12 (2), 211-239.
    • (2002) Discrete Event Dynamic Systems , vol.12 , Issue.2 , pp. 211-239
    • Olafsson, S.1    Shi, L.Y.2
  • 23
    • 25144463998 scopus 로고    scopus 로고
    • Intelligent partitioning for feature selection
    • Olafsson, S. and Yang, J., 2005. Intelligent partitioning for feature selection. Informs Journal On Computing, 17 (3), 339-355.
    • (2005) Informs Journal on Computing , vol.17 , Issue.3 , pp. 339-355
    • Olafsson, S.1    Yang, J.2
  • 24
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Ozdamar, L. and Ulusoy, G., 1995. A survey on the resource-constrained project scheduling problem. IIE Transactions, 27 (5), 574-586.
    • (1995) IIE Transactions , vol.27 , Issue.5 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 25
    • 54849158500 scopus 로고    scopus 로고
    • Hybrid nested partitions and mathematical programming approach and its applications
    • Pi, L., Pan, Y.P., and Shi, L.Y., 2008. Hybrid nested partitions and mathematical programming approach and its applications. IEEE Transactions on Automation Science and Engineering, 5 (4), 573-586.
    • (2008) IEEE Transactions on Automation Science and Engineering , vol.5 , Issue.4 , pp. 573-586
    • Pi, L.1    Pan, Y.P.2    Shi, L.Y.3
  • 27
    • 0037233381 scopus 로고    scopus 로고
    • Optimal buffer allocation in production lines
    • Shi, L.Y. and Men, S., 2003. Optimal buffer allocation in production lines. IIE Transactions, 35 (1), 1-10.
    • (2003) IIE Transactions , vol.35 , Issue.1 , pp. 1-10
    • Shi, L.Y.1    Men, S.2
  • 28
    • 0034179713 scopus 로고    scopus 로고
    • Nested partition method for global optimization
    • Shi, L.Y. and Olafsson, S., 2000. Nested partition method for global optimization. Operations Research, 48 (3), 390-407.
    • (2000) Operations Research , vol.48 , Issue.3 , pp. 390-407
    • Shi, L.Y.1    Olafsson, S.2
  • 29
    • 60749098647 scopus 로고    scopus 로고
    • Nested partitions optimization
    • P. Gray and T. Klastorin, eds., Hanover, MD: Informs
    • Shi, L.Y. and Olafsson, S., 2007. Nested partitions optimization. In: P. Gray and T. Klastorin, eds. TutORials in operations research 2007. Hanover, MD: Informs, 1-22.
    • (2007) Tutorials in Operations Research 2007 , pp. 1-22
    • Shi, L.Y.1    Olafsson, S.2
  • 30
    • 0035707473 scopus 로고    scopus 로고
    • An optimization framework for product design
    • Shi, L.Y., Olafsson, S., and Chen, Q., 2001. An optimization framework for product design. Management Science, 47 (12), 1681-1692.
    • (2001) Management Science , vol.47 , Issue.12 , pp. 1681-1692
    • Shi, L.Y.1    Olafsson, S.2    Chen, Q.3
  • 31
    • 0032782385 scopus 로고    scopus 로고
    • New parallel randomized algorithms for the traveling salesman problem
    • Shi, L.Y., Olafsson, S., and Sun, N., 1999. New parallel randomized algorithms for the traveling salesman problem. Computers & Operations Research, 26 (4), 371-394.
    • (1999) Computers & Operations Research , vol.26 , Issue.4 , pp. 371-394
    • Shi, L.Y.1    Olafsson, S.2    Sun, N.3
  • 32
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flow shop sequencing problem
    • Taillard, E., 1990. Some efficient heuristic methods for the flow shop sequencing problem. European Journal of Operational Research, 47 (1), 65-74.
    • (1990) European Journal of Operational Research , vol.47 , Issue.1 , pp. 65-74
    • Taillard, E.1
  • 33
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
    • Talbot, F.B., 1982. Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case. Management Science, 28 (10), 1197-1210.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1197-1210
    • Talbot, F.B.1
  • 34
    • 5144226254 scopus 로고    scopus 로고
    • Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors - A case study
    • Yang, T., Kuo, Y., and Chang, I., 2004. Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors - A case study. International Journal of Production Research, 42 (19), 4015-4030.
    • (2004) International Journal of Production Research , vol.42 , Issue.19 , pp. 4015-4030
    • Yang, T.1    Kuo, Y.2    Chang, I.3
  • 35
    • 74549133998 scopus 로고    scopus 로고
    • An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
    • Zandieh, M. and Gholami, M., 2009. An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns. International Journal of Production Research, 47 (24), 6999-7027.
    • (2009) International Journal of Production Research , vol.47 , Issue.24 , pp. 6999-7027
    • Zandieh, M.1    Gholami, M.2
  • 36
    • 0000230214 scopus 로고
    • Knowledgeable simulated annealing scheme for the early tardy flow-shop scheduling problem
    • Zegordi, S.H., Itoh, K., and Enkawa, T., 1995. Knowledgeable simulated annealing scheme for the early tardy flow-shop scheduling problem. International Journal of Production Research, 33 (5), 1449-1466.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1449-1466
    • Zegordi, S.H.1    Itoh, K.2    Enkawa, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.