메뉴 건너뛰기




Volumn 32, Issue 2, 2000, Pages 135-146

A method for scheduling in parallel manufacturing systems with flexible resources

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CELLULAR MANUFACTURING; HEURISTIC METHODS; NUMERICAL ANALYSIS; PROBLEM SOLVING; SAMPLING;

EID: 0034135525     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170008963886     Document Type: Article
Times cited : (39)

References (15)
  • 1
    • 0025474221 scopus 로고
    • A state–of–the–art review of parallel–machine scheduling research
    • Cheng, T.C.E., and Sin, CCS., (1990) A state–of–the–art review of parallel–machine scheduling research. European Journal of Operational Research, 47, 271–292.
    • (1990) European Journal of Operational Research , vol.47 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.S.2
  • 3
    • 0023169183 scopus 로고
    • Scheduling on machines with variable service rates
    • Adiri, I., and Yehudai, Z., (1987) Scheduling on machines with variable service rates. Computers and Operations Research, 14, 289–297.
    • (1987) Computers and Operations Research , vol.14 , pp. 289-297
    • Adiri, I.1    Yehudai, Z.2
  • 4
    • 0028383503 scopus 로고
    • Scheduling multiple variable–speed machines
    • Trick, M.A., (1994) Scheduling multiple variable–speed machines. Operations Research, 42, 234–248.
    • (1994) Operations Research , vol.42 , pp. 234-248
    • Trick, M.A.1
  • 5
    • 0030737194 scopus 로고    scopus 로고
    • Flow–line scheduling problem with controllable processing times
    • Karabali, S., and Kouvelis, P., (1997) Flow–line scheduling problem with controllable processing times. IIE Transactions, 29, 1–15.
    • (1997) IIE Transactions , vol.29 , pp. 1-15
    • Karabali, S.1    Kouvelis, P.2
  • 6
    • 0028423628 scopus 로고
    • Improved algorithms for machine allocation in manufacturing systems
    • Frenk, H., Labbe, M., van Vliet, M., and Zhang, S., (1994) Improved algorithms for machine allocation in manufacturing systems. Operations Research, 42, 523–530
    • (1994) Operations Research , vol.42 , pp. 523-530
    • Frenk, H.1    Labbe, M.2    van Vliet, M.3    Zhang, S.4
  • 8
    • 0025413493 scopus 로고
    • Some heuristics for scheduling jobs on parallel rnachincs with setups
    • So, K.C.(1990) Some heuristics for scheduling jobs on parallel rnachincs with setups. Management Science, 36, 467–475.
    • (1990) Management Science , vol.36 , pp. 467-475
    • So, K.C.1
  • 9
    • 0028424243 scopus 로고
    • Flow shop scheduling with resource flexibility
    • Daniels, R.L., and Mazzola, J.B., (1994) Flow shop scheduling with resource flexibility. Operations Research, 42, 504–522.
    • (1994) Operations Research , vol.42 , pp. 504-522
    • Daniels, R.L.1    Mazzola, J.B.2
  • 10
    • 0000059061 scopus 로고
    • The discrete resource allocation problem in flow lines
    • Karabati, S., Kouvelis, P., and Yu, G., (1995) The discrete resource allocation problem in flow lines. Management Science, 41, 1417–1430.
    • (1995) Management Science , vol.41 , pp. 1417-1430
    • Karabati, S.1    Kouvelis, P.2    Yu, G.3
  • 11
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling parallel manufacturing cells with resource flexibility
    • Daniels, R.L., Hoopes, B.J., and Mazzola, J.B., (1996) Scheduling parallel manufacturing cells with resource flexibility. Management Science, 42, 1260–1276.
    • (1996) Management Science , vol.42 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 12
    • 0019058538 scopus 로고
    • Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine
    • Vickson, R.G., (1980) Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine. Operations Research, 28, p1115–1 167 p.
    • (1980) Operations Research , vol.28
    • Vickson, R.G.1
  • 14
    • 0024769314 scopus 로고
    • Single machine scheduling with controllable processing times and number of jobs tardy
    • Daniels, R.L., and Sarin, R.K., (1989) Single machine scheduling with controllable processing times and number of jobs tardy. Operations Research, 37, 981–984.
    • (1989) Operations Research , vol.37 , pp. 981-984
    • Daniels, R.L.1    Sarin, R.K.2
  • 15
    • 0010420584 scopus 로고    scopus 로고
    • Nested partitions method for global optimization
    • Shi, L., and Olafsson, S., (1996) Nested partitions method for global optimization. Operations Research, (in press).
    • (1996) Operations Research
    • Shi, L.1    Olafsson, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.