An analysis of heuristics for the parallel-machine flexible-resource scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0031527551     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/a:1018946810121     Document Type: Article
Times cited : (31)

References (28)
  • 1
    • 0023169183 scopus 로고
    • Scheduling on machines with variable service rates
    • I. Adiri and Z. Yehudai, Scheduling on machines with variable service rates, Computers and Operations Research 14(1987)289-297.
    • (1987) Computers and Operations Research , vol.14 , pp. 289-297
    • Adiri, I.1    Yehudai, Z.2
  • 3
    • 34250073986 scopus 로고
    • A tabu search experience in production scheduling
    • J.W. Barnes and M. Laguna, A tabu search experience in production scheduling, Annals of Operations Research 41(1993)141-156.
    • (1993) Annals of Operations Research , vol.41 , pp. 141-156
    • Barnes, J.W.1    Laguna, M.2
  • 4
    • 0027562546 scopus 로고
    • Solving the multiple-machine weighted flow time problem using tabu search
    • J.W. Barnes and M. Laguna, Solving the multiple-machine weighted flow time problem using tabu search, HE Transactions 25(1993)121-128.
    • (1993) HE Transactions , vol.25 , pp. 121-128
    • Barnes, J.W.1    Laguna, M.2
  • 6
    • 0025474221 scopus 로고
    • A state-of-the-art review of parallel-machine scheduling research
    • T.C.E. Cheng and C.C.S. Sin, A state-of-the-art review of parallel-machine scheduling research, European Journal of Operational Research 47(1990)271-292.
    • (1990) European Journal of Operational Research , vol.47 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.S.2
  • 7
    • 0042154458 scopus 로고
    • Resource allocation and multi-project scheduling
    • R. Slowinski and J. Weglarz, eds., Elsevier, Amsterdam
    • R.L. Daniels, Resource allocation and multi-project scheduling, in: Advances in Project Scheduling, R. Slowinski and J. Weglarz, eds., Elsevier, Amsterdam, 1989.
    • (1989) Advances in Project Scheduling
    • Daniels, R.L.1
  • 8
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling parallel manufacturing cells with resource flexibility
    • R.L. Daniels, B.J. Hoopes and J.B. Mazzola, Scheduling parallel manufacturing cells with resource flexibility, Management Science 42(1996)1260-1276.
    • (1996) Management Science , vol.42 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 9
    • 21144472862 scopus 로고
    • A tabu-search heuristic for the flexible-resource flow shop scheduling problem
    • R.L. Daniels and J.B. Mazzola, A tabu-search heuristic for the flexible-resource flow shop scheduling problem, Annals of Operations Research 41(1993)207-230.
    • (1993) Annals of Operations Research , vol.41 , pp. 207-230
    • Daniels, R.L.1    Mazzola, J.B.2
  • 10
    • 0028424243 scopus 로고
    • Flow shop scheduling with resource flexibility
    • R.L. Daniels and J.B. Mazzola, Flow shop scheduling with resource flexibility, Operations Research 42(1994)504-522.
    • (1994) Operations Research , vol.42 , pp. 504-522
    • Daniels, R.L.1    Mazzola, J.B.2
  • 11
    • 0024769314 scopus 로고
    • Single machine scheduling with controllable processing times and number of jobs tardy
    • R.L. Daniels and R.K. Sarin, Single machine scheduling with controllable processing times and number of jobs tardy, Operations Research 37(1989)981-984.
    • (1989) Operations Research , vol.37 , pp. 981-984
    • Daniels, R.L.1    Sarin, R.K.2
  • 12
    • 0024701172 scopus 로고
    • Simultaneous resource scheduling to minimize weighted flow times
    • G. Dobson and U.S. Karmarkar, Simultaneous resource scheduling to minimize weighted flow times, Operations Research 37(1989)592-600.
    • (1989) Operations Research , vol.37 , pp. 592-600
    • Dobson, G.1    Karmarkar, U.S.2
  • 14
    • 0001627504 scopus 로고
    • Complexity results for multiprocessor scheduling under resource constraints
    • M.R. Garey and D.S. Johnson, Complexity results for multiprocessor scheduling under resource constraints, SIAM Journal of Computing 4(1975)397-411.
    • (1975) SIAM Journal of Computing , vol.4 , pp. 397-411
    • Garey, M.R.1    Johnson, D.S.2
  • 19
    • 0027306874 scopus 로고
    • Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
    • S.R. Lawrence and T.E. Morton, Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics, European Journal of Operational Research 64(1993)168-187.
    • (1993) European Journal of Operational Research , vol.64 , pp. 168-187
    • Lawrence, S.R.1    Morton, T.E.2
  • 22
    • 0043156425 scopus 로고
    • Solving the general project scheduling problem with multiple constrained resources by mathematical programming
    • R. Slowinski and J. Weglarz, Solving the general project scheduling problem with multiple constrained resources by mathematical programming, Lecture Notes in Control and Information Systems 7(1978)278-289.
    • (1978) Lecture Notes in Control and Information Systems , vol.7 , pp. 278-289
    • Slowinski, R.1    Weglarz, J.2
  • 23
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flow shop sequencing problem
    • E. Taillard, Some efficient heuristic methods for the flow shop sequencing problem, European Journal of Operational Research 47(1990)65-74.
    • (1990) European Journal of Operational Research , vol.47 , pp. 65-74
    • Taillard, E.1
  • 24
    • 0026189990 scopus 로고
    • Robust taboo search for the quadratic assignment problem
    • E. Taillard, Robust taboo search for the quadratic assignment problem, Parallel Comp. 17(1991) 443-455.
    • (1991) Parallel Comp. , vol.17 , pp. 443-455
    • Taillard, E.1
  • 25
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
    • F.B. Talbot, Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case, Management Science 28(1982)1197-1210.
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 26
    • 0028383503 scopus 로고
    • Scheduling multiple variable-speed machines
    • M.A. Trick, Scheduling multiple variable-speed machines, Operations Research 42(1994)234-248.
    • (1994) Operations Research , vol.42 , pp. 234-248
    • Trick, M.A.1
  • 27
    • 0019058538 scopus 로고
    • Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine
    • R.G. Vickson, Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine, Operations Research 28(1980)1155-1167.
    • (1980) Operations Research , vol.28 , pp. 1155-1167
    • Vickson, R.G.1
  • 28
    • 0019055358 scopus 로고
    • Two single-machine sequencing problems involving controllable job processing times
    • R.G. Vickson, Two single-machine sequencing problems involving controllable job processing times, AIEE Transactions 12(1980),258-262.
    • (1980) AIEE Transactions , vol.12 , pp. 258-262
    • Vickson, R.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.