-
1
-
-
19044376299
-
Risk-benefit-based design decisions for low-probability/high consequence earthquake events in mid-America
-
[1] Ellingwood, B., Wen, Y., Risk-benefit-based design decisions for low-probability/high consequence earthquake events in mid-America. Prog Struct Mat Eng, 2005, 56–70.
-
(2005)
Prog Struct Mat Eng
, pp. 56-70
-
-
Ellingwood, B.1
Wen, Y.2
-
2
-
-
0034831215
-
Minimum building life-cycle cost design criteria I methodology, and II applications
-
[2] Wen, Y., Kang, Y., Minimum building life-cycle cost design criteria I methodology, and II applications. J Struct Eng 127 (2001), 330–346.
-
(2001)
J Struct Eng
, vol.127
, pp. 330-346
-
-
Wen, Y.1
Kang, Y.2
-
3
-
-
56949095897
-
Decision analysis for seismic retrofit of structures
-
[3] Williams, R.J., Gardoni, P., Bracci, J.M., Decision analysis for seismic retrofit of structures. Struct Saf 31:2 (2009), 188–196.
-
(2009)
Struct Saf
, vol.31
, Issue.2
, pp. 188-196
-
-
Williams, R.J.1
Gardoni, P.2
Bracci, J.M.3
-
4
-
-
0031259430
-
Life-cycle cost design of deteriorating structures
-
[4] Frangopol, D., Lin, K., Estes, A., Life-cycle cost design of deteriorating structures. J Struct Eng 123:10 (1997), 1390–1401.
-
(1997)
J Struct Eng
, vol.123
, Issue.10
, pp. 1390-1401
-
-
Frangopol, D.1
Lin, K.2
Estes, A.3
-
5
-
-
0003623409
-
Affordable safety by choice: the life quality method
-
IRR Ontario
-
[5] Nathwani, J., Lind, N., Pandey, M., Affordable safety by choice: the life quality method. 1997, IRR, Ontario.
-
(1997)
-
-
Nathwani, J.1
Lind, N.2
Pandey, M.3
-
6
-
-
36949006306
-
Determining public policy and resource allocation priorities for mitigating natural hazards: a capabilities-based approach
-
[6] Murphy, C., Gardoni, P., Determining public policy and resource allocation priorities for mitigating natural hazards: a capabilities-based approach. Sci Eng Ethics 13:4 (2007), 480–504.
-
(2007)
Sci Eng Ethics
, vol.13
, Issue.4
, pp. 480-504
-
-
Murphy, C.1
Gardoni, P.2
-
7
-
-
40249085684
-
The acceptability and the tolerability of societal risk: a capabilities-based approach
-
[7] Murphy, C., Gardoni, P., The acceptability and the tolerability of societal risk: a capabilities-based approach. Sci Eng Ethics 14:1 (2008), 77–92.
-
(2008)
Sci Eng Ethics
, vol.14
, Issue.1
, pp. 77-92
-
-
Murphy, C.1
Gardoni, P.2
-
8
-
-
33748418455
-
The role of society in engineering risk analysis: a capabilities-based approach
-
[8] Murphy, C., Gardoni, P., The role of society in engineering risk analysis: a capabilities-based approach. Risk Anal 26:4 (2006), 1073–1083.
-
(2006)
Risk Anal
, vol.26
, Issue.4
, pp. 1073-1083
-
-
Murphy, C.1
Gardoni, P.2
-
9
-
-
84856730428
-
Gauging the societal impacts of natural disasters using a capabilities-based approach
-
[9] Murphy, C., Gardoni, P., Gauging the societal impacts of natural disasters using a capabilities-based approach. Disasters 5 (2010), 297–323.
-
(2010)
Disasters
, vol.5
, pp. 297-323
-
-
Murphy, C.1
Gardoni, P.2
-
10
-
-
84989965550
-
Renewal theory-based life-cycle analysis of deteriorating engineering systems
-
p. Submitted
-
[10] Kumar, R., Gardoni, P., Renewal theory-based life-cycle analysis of deteriorating engineering systems. Struct Saf, 2013 [p. Submitted].
-
(2013)
Struct Saf
-
-
Kumar, R.1
Gardoni, P.2
-
11
-
-
33644587855
-
Optimal seismic design for limited planning time horizon with detailed seismic hazard information
-
[11] Goda, K., Hong, H., Optimal seismic design for limited planning time horizon with detailed seismic hazard information. Struct Saf 28 (2006), 247–260.
-
(2006)
Struct Saf
, vol.28
, pp. 247-260
-
-
Goda, K.1
Hong, H.2
-
12
-
-
33751267450
-
Optimal seismic design considering risk attitude, societal tolerable risk level, and life quality criterion
-
[12] Goda, K., Hong, H., Optimal seismic design considering risk attitude, societal tolerable risk level, and life quality criterion. J. Struct Eng 132:12 (2006), 2027–2035.
-
(2006)
J. Struct Eng
, vol.132
, Issue.12
, pp. 2027-2035
-
-
Goda, K.1
Hong, H.2
-
13
-
-
42249096217
-
Application of cumulative prospect theory: implied seismic design preference
-
[13] Goda, K., Hong, H., Application of cumulative prospect theory: implied seismic design preference. Struct Saf 30 (2008), 506–516.
-
(2008)
Struct Saf
, vol.30
, pp. 506-516
-
-
Goda, K.1
Hong, H.2
-
14
-
-
84860658370
-
Risk-averse decision-making for civil infrastructure exposed to low-probability, high-consequence events
-
[14] Cha, E.J., Ellingwood, B.R., Risk-averse decision-making for civil infrastructure exposed to low-probability, high-consequence events. Reliab Eng Syst Saf 104 (2012), 27–35.
-
(2012)
Reliab Eng Syst Saf
, vol.104
, pp. 27-35
-
-
Cha, E.J.1
Ellingwood, B.R.2
-
15
-
-
68149149843
-
Effect of cumulative seismic damage and corrosion on life-cycle cost of reinforced concrete bridges
-
[15] Kumar, R., Gardoni, P., Sanches-Silva, M., Effect of cumulative seismic damage and corrosion on life-cycle cost of reinforced concrete bridges. Earthquake Eng Struct Dyn 38:7 (2009), 887–905.
-
(2009)
Earthquake Eng Struct Dyn
, vol.38
, Issue.7
, pp. 887-905
-
-
Kumar, R.1
Gardoni, P.2
Sanches-Silva, M.3
-
16
-
-
0020301034
-
Risk aversion, social values, and nuclear safety goals
-
[16] Slovic, P., Fischhoff, B., Lichtenstein, S., Risk aversion, social values, and nuclear safety goals. Trans Nucl Soc 41 (1982), 448–449.
-
(1982)
Trans Nucl Soc
, vol.41
, pp. 448-449
-
-
Slovic, P.1
Fischhoff, B.2
Lichtenstein, S.3
-
17
-
-
31744450082
-
Advances in prospect theory: cumulative representation of uncertainty
-
[17] Tversky, A., Kahneman, D., Advances in prospect theory: cumulative representation of uncertainty. J Risk Uncertainty 5 (1992), 297–323.
-
(1992)
J Risk Uncertainty
, vol.5
, pp. 297-323
-
-
Tversky, A.1
Kahneman, D.2
-
18
-
-
0019608003
-
Subjective expected utility: a model of decision making
-
[18] Fischhoff, B., Goitein, B., Shapira, Z., Subjective expected utility: a model of decision making. J Am Soc Inform Sci, 1981, 391–399.
-
(1981)
J Am Soc Inform Sci
, pp. 391-399
-
-
Fischhoff, B.1
Goitein, B.2
Shapira, Z.3
-
19
-
-
0033908770
-
Optimization – the basis for code making and reliability verification
-
[19] Rackwitz, R., Optimization – the basis for code making and reliability verification. Struct Saf 1:22 (2000), 27–60.
-
(2000)
Struct Saf
, vol.1
, Issue.22
, pp. 27-60
-
-
Rackwitz, R.1
-
20
-
-
1142292334
-
Time-variant reliability-oriented structural optimization and a renewal model for life-cycle costing
-
[20] Streicher, H., Rackwitz, R., Time-variant reliability-oriented structural optimization and a renewal model for life-cycle costing. Probab Eng Mech 1–2:19 (2004), 171–183.
-
(2004)
Probab Eng Mech
, vol.1-2
, Issue.19
, pp. 171-183
-
-
Streicher, H.1
Rackwitz, R.2
-
21
-
-
35348987632
-
Cost benefit optimization for maintained structures by a renewal model
-
[21] Joanni, A., Rackwitz, R., Cost benefit optimization for maintained structures by a renewal model. Reliab Eng Syst Saf 3:93 (2008), 489–499.
-
(2008)
Reliab Eng Syst Saf
, vol.3
, Issue.93
, pp. 489-499
-
-
Joanni, A.1
Rackwitz, R.2
-
22
-
-
84884079276
-
Theory of games and economic behavior
-
Princeton: Princeton University Press
-
[22] Neumann, J.v., Morgenstern, O., Theory of games and economic behavior. 1953, Princeton: Princeton University Press.
-
(1953)
-
-
Neumann, J.V.1
Morgenstern, O.2
-
23
-
-
0001579697
-
Risk aversion in the small and in the large
-
[23] Prat, J., Risk aversion in the small and in the large. Econometrica 32 (1964), 122–136.
-
(1964)
Econometrica
, vol.32
, pp. 122-136
-
-
Prat, J.1
-
24
-
-
0003626859
-
Essays in the theory of risk-bearing
-
Markham Publishing Company
-
[24] Arrow, J., Essays in the theory of risk-bearing. 1971, Markham Publishing Company.
-
(1971)
-
-
Arrow, J.1
-
26
-
-
84866498788
-
Seismic risk mitigation of building structures: the role of risk aversion
-
[26] Cha, E.J., Ellingwood, B.R., Seismic risk mitigation of building structures: the role of risk aversion. Struct Saf 40 (2013), 11–19.
-
(2013)
Struct Saf
, vol.40
, pp. 11-19
-
-
Cha, E.J.1
Ellingwood, B.R.2
-
27
-
-
84891584188
-
Capital budgeting valuation: financial analysis for today's investment project
-
John Wiley & Sons
-
[27] Baker, H.K., English, P., Capital budgeting valuation: financial analysis for today's investment project. 2011, John Wiley & Sons.
-
(2011)
-
-
Baker, H.K.1
English, P.2
-
28
-
-
77949321800
-
Improved capital budgeting decision making: evidence from Canada
-
[28] Bennouna, K., Meredith, G., Merchant, T., Improved capital budgeting decision making: evidence from Canada. Manag Decis 48:2 (2010), 225–226.
-
(2010)
Manag Decis
, vol.48
, Issue.2
, pp. 225-226
-
-
Bennouna, K.1
Meredith, G.2
Merchant, T.3
-
29
-
-
84967391744
-
Corporate finance
-
McGraw-Hill/Irwin New York
-
[29] Ross, S.A., Westerfield, R.W., Jaffe, J., Corporate finance. 2013, McGraw-Hill/Irwin, New York.
-
(2013)
-
-
Ross, S.A.1
Westerfield, R.W.2
Jaffe, J.3
-
31
-
-
3543004675
-
The Reaction of multifamily capitalization rates to natural disasters
-
[31] Bleich, D., The Reaction of multifamily capitalization rates to natural disasters. J Real Estate Res 25:2 (2003), 133–144.
-
(2003)
J Real Estate Res
, vol.25
, Issue.2
, pp. 133-144
-
-
Bleich, D.1
-
32
-
-
84989827843
-
-
IFRS financial reporting and analysis software, Profitability ratios, HYPERLINK <> ⧹l “ref1938” [accessed 30.5.16]
-
[32] Ready Ratios. IFRS financial reporting and analysis software, Profitability ratios, HYPERLINK < http://www.readyratios.com/reference/profitability/> ⧹l “ref1938” < http://www.readyratios.com/reference/profitability/#ref1938>; 2015 [accessed 30.5.16].
-
(2015)
Ready Ratios
-
-
-
33
-
-
0036793104
-
Probabilistic capacity models and fragility estimates for reinforced concrete columns based on experimental observations
-
[33] Gardoni, P., Der Kiureghian, A., Mosalam, K., Probabilistic capacity models and fragility estimates for reinforced concrete columns based on experimental observations. ASCE J Eng Mech 128:10 (2002), 1024–1038.
-
(2002)
ASCE J Eng Mech
, vol.128
, Issue.10
, pp. 1024-1038
-
-
Gardoni, P.1
Der Kiureghian, A.2
Mosalam, K.3
-
34
-
-
0037662172
-
Probabilistic seismic demand models and fragility estimates for RC bridges
-
[34] Gardoni, P., Mosalam, K., Der Kiureghiam, A., Probabilistic seismic demand models and fragility estimates for RC bridges. J Earthquake Eng 7:1 (2003), 79–106.
-
(2003)
J Earthquake Eng
, vol.7
, Issue.1
, pp. 79-106
-
-
Gardoni, P.1
Mosalam, K.2
Der Kiureghiam, A.3
-
35
-
-
7244222608
-
Enterprise risk management: from incentives to controls
-
Wiley Hoboken
-
[35] Lam, J., Enterprise risk management: from incentives to controls. 2003, Wiley, Hoboken.
-
(2003)
-
-
Lam, J.1
-
36
-
-
84989852109
-
Criteria for U.S. and Canadian CMBS Transactions
-
McGraw Hill Financial
-
[36] Standard and Poor's, Criteria for U.S. and Canadian CMBS Transactions. 2013, McGraw Hill Financial.
-
(2013)
-
-
Standard and Poor's1
-
37
-
-
0042855820
-
Seismic force modification factors for the proposed 2005 edition of the National Building Code of Canada
-
[37] Mithcell, D., Tremblay, R., Karacabeyli, E., Paultre, P., Saatcioglu, M., Anderson, D., Seismic force modification factors for the proposed 2005 edition of the National Building Code of Canada. Can J Civil Eng, 2003, 308–327.
-
(2003)
Can J Civil Eng
, pp. 308-327
-
-
Mithcell, D.1
Tremblay, R.2
Karacabeyli, E.3
Paultre, P.4
Saatcioglu, M.5
Anderson, D.6
-
38
-
-
0041305350
-
Fourth generation seismic hazard maps of Canada: values for over 650 Canadian localities intended for the 2005 National Building Code of Canada
-
Geological survey of Canada Ottawa
-
[38] Adams, J., Halchuk, S., Fourth generation seismic hazard maps of Canada: values for over 650 Canadian localities intended for the 2005 National Building Code of Canada. Open-File 4459, 2003, Geological survey of Canada, Ottawa.
-
(2003)
Open-File 4459
-
-
Adams, J.1
Halchuk, S.2
|