메뉴 건너뛰기




Volumn 270, Issue 1-2, 2018, Pages 65-74

A framework for investigating optimization of service parts performance with big data

Author keywords

Big data; Operations management; Service parts; Supply chain management

Indexed keywords


EID: 84988355021     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-016-2314-1     Document Type: Article
Times cited : (19)

References (74)
  • 1
    • 80055050719 scopus 로고    scopus 로고
    • Effects of correlation on intermittent demand forecasting and stock control
    • Altay, N., Litteral, L. A., & Rudisill, F. (2012). Effects of correlation on intermittent demand forecasting and stock control. International Journal of Production Economics, 135(1), 275–283
    • (2012) International Journal of Production Economics , vol.135 , Issue.1 , pp. 275-283
    • Altay, N.1    Litteral, L.A.2    Rudisill, F.3
  • 3
    • 84938416102 scopus 로고    scopus 로고
    • Service differentiation in spare parts supply through dedicated stocks
    • Alvarez, E., Heijden, M., & Zijm, W. (2015). Service differentiation in spare parts supply through dedicated stocks. Annals of Operations Research, 231(1), 283–303
    • (2015) Annals of Operations Research , vol.231 , Issue.1 , pp. 283-303
    • Alvarez, E.1    Heijden, M.2    Zijm, W.3
  • 4
    • 84858746230 scopus 로고    scopus 로고
    • Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice
    • Bacchetti, A., & Saccani, N. (2012). Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice. Omega, 40(6), 722–737
    • (2012) Omega , vol.40 , Issue.6 , pp. 722-737
    • Bacchetti, A.1    Saccani, N.2
  • 6
    • 44949289016 scopus 로고
    • Manufacturing in the 1990s-productivity, flexibility and innovation
    • Bolwijn, P. T., & Kumpe, T. (1990). Manufacturing in the 1990s-productivity, flexibility and innovation. Long Range Planning, 23(4), 44–48
    • (1990) Long Range Planning , vol.23 , Issue.4 , pp. 44-48
    • Bolwijn, P.T.1    Kumpe, T.2
  • 7
    • 84900790096 scopus 로고    scopus 로고
    • Implementation of a system approach for enhanced supply chain continuity and resiliency: A longitudinal study
    • Boone, C. A., Craighead, C. W., Hanna, J. B., & Nair, A. (2013). Implementation of a system approach for enhanced supply chain continuity and resiliency: A longitudinal study. Journal of Business Logistics, 34(3), 222–235
    • (2013) Journal of Business Logistics , vol.34 , Issue.3 , pp. 222-235
    • Boone, C.A.1    Craighead, C.W.2    Hanna, J.B.3    Nair, A.4
  • 8
    • 0002626912 scopus 로고
    • The historical development of the strategic management concept
    • Bracker, J. (1980). The historical development of the strategic management concept. Academy of Management Review, 5(2), 219–224
    • (1980) Academy of Management Review , vol.5 , Issue.2 , pp. 219-224
    • Bracker, J.1
  • 9
    • 84899920957 scopus 로고    scopus 로고
    • Crisis Management planning among tier 2 automobile suppliers: Why suppliers fail to plan
    • Burns, K. F., & Marx, T. G. (2014). Crisis Management planning among tier 2 automobile suppliers: Why suppliers fail to plan. Journal of Contingencies & Crisis Management, 22(2), 108–112
    • (2014) Journal of Contingencies & Crisis Management , vol.22 , Issue.2 , pp. 108-112
    • Burns, K.F.1    Marx, T.G.2
  • 11
    • 0024480893 scopus 로고
    • Near-optimal service constrained stocking policies for spare parts
    • Cohen, M. A., Kleindorfer, P. R., & Lee, H. L. (1989). Near-optimal service constrained stocking policies for spare parts. Operations Research, 37(1), 104
    • (1989) Operations Research , vol.37 , Issue.1 , pp. 104
    • Cohen, M.A.1    Kleindorfer, P.R.2    Lee, H.L.3
  • 12
    • 33747858003 scopus 로고    scopus 로고
    • Composite-variable modeling for service parts logistics
    • Cohn, A. M., & Barnhart, C. (2006). Composite-variable modeling for service parts logistics. Annals of Operations Research, 144(1), 17–32
    • (2006) Annals of Operations Research , vol.144 , Issue.1 , pp. 17-32
    • Cohn, A.M.1    Barnhart, C.2
  • 15
    • 84913599394 scopus 로고    scopus 로고
    • A closed-loop location-inventory problem with spare parts consideration
    • Diabat, A., Abdallah, T., & Henschel, A. (2015). A closed-loop location-inventory problem with spare parts consideration. Computers & Operations Research, 54, 245–256
    • (2015) Computers & Operations Research , vol.54 , pp. 245-256
    • Diabat, A.1    Abdallah, T.2    Henschel, A.3
  • 16
    • 84930767058 scopus 로고    scopus 로고
    • Maintenance spare parts planning and control: A framework for control and agenda for future research
    • Driessen, M., Arts, J., van Houtum, G.-J., Rustenburg, J. W., & Huisman, B. (2015). Maintenance spare parts planning and control: A framework for control and agenda for future research. Production Planning & Control, 20, 407–426
    • (2015) Production Planning & Control , vol.20 , pp. 407-426
    • Driessen, M.1    Arts, J.2    van Houtum, G.-J.3    Rustenburg, J.W.4    Huisman, B.5
  • 17
    • 85132311172 scopus 로고
    • Patterns of control in U.S., UK, and European multinational corporations
    • Egelhoff, W. G. (1984). Patterns of control in U.S., UK, and European multinational corporations. Journal of International Business Studies, 15(2), 73–83
    • (1984) Journal of International Business Studies , vol.15 , Issue.2 , pp. 73-83
    • Egelhoff, W.G.1
  • 19
    • 0011424458 scopus 로고    scopus 로고
    • Filling Customer orders from multiple locations: A comparison of pooling methods
    • Evers, P. T. (1999). Filling Customer orders from multiple locations: A comparison of pooling methods. Journal of Business Logistics, 20(1), 121–139
    • (1999) Journal of Business Logistics , vol.20 , Issue.1 , pp. 121-139
    • Evers, P.T.1
  • 20
    • 0346540030 scopus 로고    scopus 로고
    • An investigation of the impact of flexibility on global reach and firm performance
    • Fawcett, S. E., Calantone, R. J., & Smith, S. (1996). An investigation of the impact of flexibility on global reach and firm performance. Journal of Business Logistics, 17(2), 167–196
    • (1996) Journal of Business Logistics , vol.17 , Issue.2 , pp. 167-196
    • Fawcett, S.E.1    Calantone, R.J.2    Smith, S.3
  • 21
    • 84907993905 scopus 로고    scopus 로고
    • Supply chain game changers-mega, nano, and virtual trends-and forces that impede supply chain design (ie, building a winning team)
    • Fawcett, S. E., & Waller, M. A. (2014). Supply chain game changers-mega, nano, and virtual trends-and forces that impede supply chain design (ie, building a winning team). Journal of Business Logistics, 35(3), 157–164
    • (2014) Journal of Business Logistics , vol.35 , Issue.3 , pp. 157-164
    • Fawcett, S.E.1    Waller, M.A.2
  • 24
    • 16344394088 scopus 로고    scopus 로고
    • Rigor in grounded theory research: An interpretive perspective on generating theory from qualitative field studies
    • Whitman ME, Woszczynski AB, (eds), Idea Group Publishing, Hershey, PA
    • Gasson, S. (2004). Rigor in grounded theory research: An interpretive perspective on generating theory from qualitative field studies. In M. E. Whitman & A. B. Woszczynski (Eds.), The Handbook of Information Systems Research (pp. 79–102). Hershey, PA: Idea Group Publishing
    • (2004) The Handbook of Information Systems Research , pp. 79-102
    • Gasson, S.1
  • 25
    • 84879945631 scopus 로고    scopus 로고
    • Spare parts estimation for machine availability improvement addressing its reliability and operating environment—Case study
    • Ghodrati, B., Ahmadi, A., & Galar, D. (2013). Spare parts estimation for machine availability improvement addressing its reliability and operating environment—Case study. International Journal of Reliability, Quality & Safety Engineering, 20(3), 1–15
    • (2013) International Journal of Reliability, Quality & Safety Engineering , vol.20 , Issue.3 , pp. 1-15
    • Ghodrati, B.1    Ahmadi, A.2    Galar, D.3
  • 27
    • 85027948280 scopus 로고    scopus 로고
    • Cost allocation in inventory pools of spare parts with service-differentiated demand classes
    • Guajardo, M., & Rönnqvist, M. (2015). Cost allocation in inventory pools of spare parts with service-differentiated demand classes. International Journal of Production Research, 53(1), 220–237
    • (2015) International Journal of Production Research , vol.53 , Issue.1 , pp. 220-237
    • Guajardo, M.1    Rönnqvist, M.2
  • 28
    • 0000580880 scopus 로고
    • An empirical typology of mature industrial-product environments
    • Hambrick, D. C. (1983). An empirical typology of mature industrial-product environments. Academy of Management Journal, 26(2), 213–230
    • (1983) Academy of Management Journal , vol.26 , Issue.2 , pp. 213-230
    • Hambrick, D.C.1
  • 30
    • 84901705764 scopus 로고    scopus 로고
    • Data quality for data science, predictive analytics, and big data in supply chain management: an introduction to the problem and suggestions for research and applications
    • Hazen, B. T., Boone, C. A., Ezell, J. D., & Jones-Farmer, L. A. (2014). Data quality for data science, predictive analytics, and big data in supply chain management: an introduction to the problem and suggestions for research and applications. International Journal Of Production Economics, 154, 72–80
    • (2014) International Journal Of Production Economics , vol.154 , pp. 72-80
    • Hazen, B.T.1    Boone, C.A.2    Ezell, J.D.3    Jones-Farmer, L.A.4
  • 31
    • 84969786292 scopus 로고    scopus 로고
    • Back in business: Operations research in support of big data analytics for operations and supply chain management
    • &
    • Hazen, B. T., Skipper, J. B., Boone, C. A., & Hill, R. R. (2016). Back in business: Operations research in support of big data analytics for operations and supply chain management. Annals of Operations Research. doi:10.1007/s10479-016-2226-0
    • (2016) Annals of Operations Research
    • Hazen, B.T.1    Skipper, J.B.2    Boone, C.A.3    Hill, R.R.4
  • 32
    • 84989064848 scopus 로고
    • Generic strategies: An empirical investigation of typology validity and strategy content
    • Herbert, T. T., & Deresky, H. (1987). Generic strategies: An empirical investigation of typology validity and strategy content. Strategic Management Journal, 8(2), 135–147
    • (1987) Strategic Management Journal , vol.8 , Issue.2 , pp. 135-147
    • Herbert, T.T.1    Deresky, H.2
  • 33
    • 0000190227 scopus 로고
    • Toward a contingency theory of business strategy
    • Hoffer, C. W. (1975). Toward a contingency theory of business strategy. Academy of Management Journal, 18(4), 784–810
    • (1975) Academy of Management Journal , vol.18 , Issue.4 , pp. 784-810
    • Hoffer, C.W.1
  • 34
    • 0035815827 scopus 로고    scopus 로고
    • Maintenance spare parts logistics: Special characteristics and strategic choices
    • Huiskonen, J. (2001). Maintenance spare parts logistics: Special characteristics and strategic choices. International Journal Of Production Economics, 71(1), 125–133
    • (2001) International Journal Of Production Economics , vol.71 , Issue.1 , pp. 125-133
    • Huiskonen, J.1
  • 36
    • 84928743035 scopus 로고    scopus 로고
    • Technical paper: Joint optimization of preventive maintenance and inventory policies for multi-unit systems subject to deteriorating spare part inventory
    • Jiang, Y., Chen, M., & Zhou, D. (2015). Technical paper: Joint optimization of preventive maintenance and inventory policies for multi-unit systems subject to deteriorating spare part inventory. Journal of Manufacturing Systems, 35, 191–205
    • (2015) Journal of Manufacturing Systems , vol.35 , pp. 191-205
    • Jiang, Y.1    Chen, M.2    Zhou, D.3
  • 37
    • 84913569184 scopus 로고    scopus 로고
    • Integrated spare parts logistics and operations planning for maintenance service providers
    • Kazemi Zanjani, M., & Nourelfath, M. (2014). Integrated spare parts logistics and operations planning for maintenance service providers. International Journal Of Production Economics, 158, 44–53
    • (2014) International Journal Of Production Economics , vol.158 , pp. 44-53
    • Kazemi Zanjani, M.1    Nourelfath, M.2
  • 39
    • 84879693885 scopus 로고    scopus 로고
    • The case of Amazon.com: Towards a conceptual framework of online customer service experience (OCSE) using the emerging consensus technique (ECT)
    • Klaus, P. (2013). The case of Amazon.com: Towards a conceptual framework of online customer service experience (OCSE) using the emerging consensus technique (ECT). Journal of Services Marketing, 27(6), 443–457
    • (2013) Journal of Services Marketing , vol.27 , Issue.6 , pp. 443-457
    • Klaus, P.1
  • 44
    • 0043162431 scopus 로고    scopus 로고
    • The strategic dynamics of total quality management: A grounded theory research study
    • Leonard, D., & McAdam, R. (2002). The strategic dynamics of total quality management: A grounded theory research study. The Quality Management Journal, 9(1), 50–62
    • (2002) The Quality Management Journal , vol.9 , Issue.1 , pp. 50-62
    • Leonard, D.1    McAdam, R.2
  • 45
    • 85027917446 scopus 로고    scopus 로고
    • Comparing concepts for shop floor control of information-processing services in a job shop setting: A case from the financial services sector
    • Leyer, M., & Moormann, J. (2015). Comparing concepts for shop floor control of information-processing services in a job shop setting: A case from the financial services sector. International Journal of Production Research, 53(4), 1168–1179
    • (2015) International Journal of Production Research , vol.53 , Issue.4 , pp. 1168-1179
    • Leyer, M.1    Moormann, J.2
  • 46
    • 80052828249 scopus 로고    scopus 로고
    • A Bayesian Inventory Model using real-time condition monitoring information
    • Li, R., & Ryan, J. K. (2011). A Bayesian Inventory Model using real-time condition monitoring information. Production & Operations Management, 20(5), 754–771
    • (2011) Production & Operations Management , vol.20 , Issue.5 , pp. 754-771
    • Li, R.1    Ryan, J.K.2
  • 50
    • 0024664587 scopus 로고
    • A possibility of spare parts planning improvement in the production enterprises
    • Papazov, K., & Tashev, A. (1988). A possibility of spare parts planning improvement in the production enterprises. Engineering Costs & Production Economics, 15(1–4), 211–214
    • (1988) Engineering Costs & Production Economics , vol.15 , Issue.1-4 , pp. 211-214
    • Papazov, K.1    Tashev, A.2
  • 52
    • 3843076381 scopus 로고    scopus 로고
    • Supplier relations and flexibility in the Spanish automotive industry
    • Pérez, M. P., & Sánchez, A. M. (2001). Supplier relations and flexibility in the Spanish automotive industry. Supply Chain Management: An International Journal, 6(1), 29–38. doi:10.1108/13598540110381272
    • (2001) Supply Chain Management: An International Journal , vol.6 , Issue.1 , pp. 29-38
    • Pérez, M.P.1    Sánchez, A.M.2
  • 54
    • 84901060634 scopus 로고    scopus 로고
    • A review of multi-criteria classification of spare parts: From literature analysis to industrial evidences
    • Roda, I., Macchi, M., Fumagalli, L., & Viveros, P. (2014). A review of multi-criteria classification of spare parts: From literature analysis to industrial evidences. Journal of Manufacturing Technology Management, 25(4), 528–549
    • (2014) Journal of Manufacturing Technology Management , vol.25 , Issue.4 , pp. 528-549
    • Roda, I.1    Macchi, M.2    Fumagalli, L.3    Viveros, P.4
  • 55
    • 84922962670 scopus 로고    scopus 로고
    • A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount
    • Samouei, P., Kheirkhan, A. S., & Fattahi, P. (2015). A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount. Annals of Operations Research, 226(1), 551–563
    • (2015) Annals of Operations Research , vol.226 , Issue.1 , pp. 551-563
    • Samouei, P.1    Kheirkhan, A.S.2    Fattahi, P.3
  • 56
    • 84908258559 scopus 로고    scopus 로고
    • On the robust decision-making in a supply chain under disruption risks
    • Sawik, T. (2014). On the robust decision-making in a supply chain under disruption risks. International Journal of Production Research, 52(22), 6760–6781
    • (2014) International Journal of Production Research , vol.52 , Issue.22 , pp. 6760-6781
    • Sawik, T.1
  • 57
    • 84922676232 scopus 로고    scopus 로고
    • On the fair optimization of cost and customer service level in a supply chain under disruption risks
    • Sawik, T. (2015). On the fair optimization of cost and customer service level in a supply chain under disruption risks. Omega, 53, 58–66
    • (2015) Omega , vol.53 , pp. 58-66
    • Sawik, T.1
  • 58
    • 38949209941 scopus 로고    scopus 로고
    • Designing control management systems for parts recovery and spare parts management in the final phase within closed-loop supply chains
    • Schroter, M., & Spengler, T. (2004). Designing control management systems for parts recovery and spare parts management in the final phase within closed-loop supply chains. International Journal of Integrated Supply Management, 1(2), 158–179
    • (2004) International Journal of Integrated Supply Management , vol.1 , Issue.2 , pp. 158-179
    • Schroter, M.1    Spengler, T.2
  • 63
    • 0036756454 scopus 로고    scopus 로고
    • Easy quantification of improved spare parts inventory policies
    • Thonemann, U. W., Brown, A. O., & Hausman, W. H. (2002). Easy quantification of improved spare parts inventory policies. Management Science, 48(9), 1213–1225
    • (2002) Management Science , vol.48 , Issue.9 , pp. 1213-1225
    • Thonemann, U.W.1    Brown, A.O.2    Hausman, W.H.3
  • 64
    • 10844283310 scopus 로고    scopus 로고
    • Replacement parts management: The value of information
    • Tibben-Lembke, R. S., & Amato, H. N. (2001). Replacement parts management: The value of information. Journal of Business Logistics, 22(2), 149–164
    • (2001) Journal of Business Logistics , vol.22 , Issue.2 , pp. 149-164
    • Tibben-Lembke, R.S.1    Amato, H.N.2
  • 65
    • 84863449598 scopus 로고    scopus 로고
    • Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound poisson demand
    • Topan, E., & Bayindir, Z. P. (2012). Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound poisson demand. Journal of the Operational Research Society, 63(8), 1143–1152
    • (2012) Journal of the Operational Research Society , vol.63 , Issue.8 , pp. 1143-1152
    • Topan, E.1    Bayindir, Z.P.2
  • 69
    • 84900796645 scopus 로고    scopus 로고
    • Data science, predictive analytics, and big data: A revolution that will transform supply chain design and management
    • Waller, M. A., & Fawcett, S. E. (2013). Data science, predictive analytics, and big data: A revolution that will transform supply chain design and management. Journal of Business Logistics, 34(2), 77–84
    • (2013) Journal of Business Logistics , vol.34 , Issue.2 , pp. 77-84
    • Waller, M.A.1    Fawcett, S.E.2
  • 71
    • 0036475684 scopus 로고    scopus 로고
    • A reexamination and extension of international strategy–structure theory
    • Wolf, J., & Egelhoff, W. G. (2002). A reexamination and extension of international strategy–structure theory. Strategic Management Journal, 23(2), 181–189
    • (2002) Strategic Management Journal , vol.23 , Issue.2 , pp. 181-189
    • Wolf, J.1    Egelhoff, W.G.2
  • 72
    • 12344280027 scopus 로고    scopus 로고
    • Inventory pooling of repairable spare parts with non-zero lateral transshipment time qnd delayed lateral transshipments
    • Wong, H., Cattrysse, D., & Van Oudheusden, D. (2005). Inventory pooling of repairable spare parts with non-zero lateral transshipment time qnd delayed lateral transshipments. European Journal of Operational Research, 165(1), 207–218
    • (2005) European Journal of Operational Research , vol.165 , Issue.1 , pp. 207-218
    • Wong, H.1    Cattrysse, D.2    Van Oudheusden, D.3
  • 73
    • 3242696769 scopus 로고    scopus 로고
    • Global sourcing: Process and design for efficient management
    • Zeng, A. Z. (2003). Global sourcing: Process and design for efficient management. Supply Chain Management: An International Journal, 8(4), 367–379
    • (2003) Supply Chain Management: An International Journal , vol.8 , Issue.4 , pp. 367-379
    • Zeng, A.Z.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.