-
1
-
-
1542584143
-
Advanced planning and scheduling systems: just a fad or a breakthrough in manufacturing and supply chain management?
-
December.
-
Advanced Manufacturing Research Inc. (1996), “Advanced planning and scheduling systems: just a fad or a breakthrough in manufacturing and supply chain management?”, The Report on Manufacturing, December.
-
(1996)
The Report on Manufacturing
-
-
-
4
-
-
0026126118
-
A computational study of the job-shop scheduling problem
-
Applegate, D. and Cook, W. (1991), “A computational study of the job-shop scheduling problem”, ORSA Journal of Computing, No. 3, pp. 149-56.
-
(1991)
ORSA Journal of Computing
, pp. 149-156
-
-
Applegate, D.1
Cook, W.2
-
5
-
-
0033102073
-
Tabu search for total tardiness minimization in flowshop scheduling problems
-
Armentano, A. and Ronconi, D. (1999), “Tabu search for total tardiness minimization in flowshop scheduling problems”, Computers & Operations Research, Vol. 26, pp. 219-35.
-
(1999)
Computers & Operations Research
, vol.26
, pp. 219-235
-
-
Armentano, A.1
Ronconi, D.2
-
6
-
-
0342592297
-
Tabu search for minimizing total tardiness in a job shop
-
Armentano, A. and Scrich, C. (2000), “Tabu search for minimizing total tardiness in a job shop”, International Journal of Production Economics, Vol. 63, pp. 131-40.
-
(2000)
International Journal of Production Economics
, vol.63
, pp. 131-140
-
-
Armentano, A.1
Scrich, C.2
-
7
-
-
0024907528
-
Expert systems can do job shop scheduling: an exploration and a proposal
-
Biegel, J.E. and Wink, L.J. (1989), “Expert systems can do job shop scheduling: an exploration and a proposal”, Computers & Industrial Engineering, Vol. 17 No. 1, pp. 347-52.
-
(1989)
Computers & Industrial Engineering
, vol.17
, pp. 347-352
-
-
Biegel, J.E.1
Wink, L.J.2
-
9
-
-
0032295711
-
A genetic algorithm based procedure for more realistic scheduling problems
-
Candido, M.A., Khator, S.K. and Barcia, R.M. (1998), “A genetic algorithm based procedure for more realistic scheduling problems”, International Journal of Production Research, Vol. 36 No. 12, pp. 3437-57.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 3437-3457
-
-
Candido, M.A.1
Khator, S.K.2
Barcia, R.M.3
-
10
-
-
0032131027
-
Hybrid genetic algorithms for a multiple-objective scheduling problem
-
Cavalieri, S. and Gaiardelli, P. (1997), “Hybrid genetic algorithms for a multiple-objective scheduling problem”, Journal of Intelligent Manufacturing, Vol. 9, pp. 361-7.
-
(1997)
Journal of Intelligent Manufacturing
, vol.9
, pp. 361-367
-
-
Cavalieri, S.1
Gaiardelli, P.2
-
11
-
-
0347138149
-
Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach
-
Chang, P.T. and Lo, Y.T. (2001), “Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach”, International Journal of Computer Integrated Manufacturing, Vol. 14 No. 4, pp. 367-84.
-
(2001)
International Journal of Computer Integrated Manufacturing
, vol.14
, pp. 367-384
-
-
Chang, P.T.1
Lo, Y.T.2
-
12
-
-
84986070331
-
An expert system for dynamic manufacturing rescheduling
-
paper presented at the Symposium on Real Time Optimisation in Automated Manufacturing Facilities, National Bureau of Standards, Gaithersburg, MD.
-
Chiodini, V. (1980), “An expert system for dynamic manufacturing rescheduling”, paper presented at the Symposium on Real Time Optimisation in Automated Manufacturing Facilities, National Bureau of Standards, Gaithersburg, MD.
-
(1980)
-
-
Chiodini, V.1
-
13
-
-
0035360038
-
-
“Dynamic scheduling of manufacturing job shops using genetic algorithms”
-
Chryssolouris, G. and Subraniam, V. (2001), “Dynamic scheduling of manufacturing job shops using genetic algorithms”, Journal of Intelligent Manufacturing, Vol. 12, pp. 281-93.
-
(2001)
Journal of Intelligent Manufacturing
, vol.12
, pp. 281-293
-
-
Chryssolouris, G.1
Subraniam, V.2
-
14
-
-
0001937142
-
Effective capacity planning for automated factories requires workable simulation tools and responsive shopfloor controls
-
April
-
Classen, R.J. and Malstrom, E.M. (1982), “Effective capacity planning for automated factories requires workable simulation tools and responsive shopfloor controls”, Industrial Engineering, April, pp. 73-9.
-
(1982)
Industrial Engineering
, pp. 73-79
-
-
Classen, R.J.1
Malstrom, E.M.2
-
16
-
-
0004113622
-
-
Addison-Wesley, Reading, MA.
-
Conway R., Maxwell, W. and Miller, L. (1967), Theory of Scheduling, Addison-Wesley, Reading, MA.
-
(1967)
Theory of Scheduling
-
-
Conway, R.1
Maxwell, W.2
Miller, L.3
-
17
-
-
0006859281
-
Genetic neuro-scheduler: a new approach for job shop scheduling
-
Dagli, C.H. and Sittisathanchai, S. (1995), “Genetic neuro-scheduler: a new approach for job shop scheduling”, International Journal of Production Economics, Vol. 45, pp. 135-45.
-
(1995)
International Journal of Production Economics
, vol.45
, pp. 135-145
-
-
Dagli, C.H.1
Sittisathanchai, S.2
-
19
-
-
0003265061
-
An expert system scheduler: some reflections on expert system development
-
Deal, D.E., Chen, J.G., Ignizio, J.P. and Jayakamer, V. (1992), “An expert system scheduler: some reflections on expert system development”, Journal of Computers and Operations Research.
-
(1992)
Journal of Computers and Operations Research
-
-
Deal, D.E.1
Chen, J.G.2
Ignizio, J.P.3
Jayakamer, V.4
-
20
-
-
0000332876
-
Decomposition methods for re-etrant flow shops with sequence-dependent set-up times
-
Demirkol E. and Uzsoy, R. (2000), “Decomposition methods for re-etrant flow shops with sequence-dependent set-up times”, Journal of Scheduling, Vol. 3 No. 3, pp. 155-77.
-
(2000)
Journal of Scheduling
, vol.3
, pp. 155-177
-
-
Demirkol, E.1
Uzsoy, R.2
-
21
-
-
0032156495
-
Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness
-
Dessouky, M. (1998), “Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness”, Computers & Industrial Engineering, Vol. 34 No. 4, pp. 793-806.
-
(1998)
Computers & Industrial Engineering
, vol.34
, pp. 793-806
-
-
Dessouky, M.1
-
22
-
-
0032678513
-
Scheduling pre-emptive jobs with precedence constraints on parallel machines
-
Djellab, K. (1998), “Scheduling pre-emptive jobs with precedence constraints on parallel machines”, European Journal of Operational Research, Vol. 11, pp. 355-67.
-
(1998)
European Journal of Operational Research
, vol.11
, pp. 355-367
-
-
Djellab, K.1
-
23
-
-
0002184666
-
A status report: artificial intelligence
-
Dornan, B. (1987), “A status report: artificial intelligence”, Production, pp. 46-50.
-
(1987)
Production
, pp. 46-50
-
-
Dornan, B.1
-
25
-
-
0033706619
-
Evaluating simple scheduling rules in a mixed shop environment
-
Ferrell, W., Sale, J., Sams, J. and Yellamraju, M. (2000), “Evaluating simple scheduling rules in a mixed shop environment”, Computers & Industrial Engineering, Vol. 38 No. 1, pp. 39-66.
-
(2000)
Computers & Industrial Engineering
, vol.38
, pp. 39-66
-
-
Ferrell, W.1
Sale, J.2
Sams, J.3
Yellamraju, M.4
-
26
-
-
0024122608
-
Stochastic neural networks for solving job-shop scheduling: Part I: problem presentation
-
San Diego, CA
-
Foo, Y.P. and Takefuji, Y. (1988), “Stochastic neural networks for solving job-shop scheduling: Part I: problem presentation”, IEEE International Conference on Neural Networks, San Diego, CA, Vol. II, pp. 275-80.
-
(1988)
IEEE International Conference on Neural Networks
, vol.2
, pp. 275-280
-
-
Foo, Y.P.1
Takefuji, Y.2
-
27
-
-
84982522109
-
ISIS: a knowledge-based system for factory scheduling
-
Fox, M.S. and Smith, S.F. (1984), “ISIS: a knowledge-based system for factory scheduling”, Expert Systems, Vol. 1 No. 1, pp. 25-49.
-
(1984)
Expert Systems
, vol.1
, pp. 25-49
-
-
Fox, M.S.1
Smith, S.F.2
-
28
-
-
0032599597
-
Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: heuristic mixing method machines and precedence
-
Ghedjati (1999), “Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: heuristic mixing method machines and precedence”, Computers & Industrial Engineering, Vol. 37, pp. 39-42.
-
(1999)
Computers & Industrial Engineering
, vol.37
, pp. 39-42
-
-
Ghedjati1
-
30
-
-
84986141371
-
Scheduling in job shops with machine breakdowns: an experimental study
-
Holthaus, O. (1999), “Scheduling in job shops with machine breakdowns: an experimental study”, Computers & Industrial Engineering, Vol. 37 No. 1-2, pp. 1-504.
-
(1999)
Computers & Industrial Engineering
, vol.37
, pp. 1-504
-
-
Holthaus, O.1
-
31
-
-
0030717003
-
New dispatching rules for scheduling in a job shop: an experimental study
-
Holthaus, O. and Rajendran, C. (1997), “New dispatching rules for scheduling in a job shop: an experimental study”, International Journal of Advanced Manufacturing Technology, Vol. 13, pp. 148-53.
-
(1997)
International Journal of Advanced Manufacturing Technology
, vol.13
, pp. 148-153
-
-
Holthaus, O.1
Rajendran, C.2
-
32
-
-
0034161039
-
Efficient jobshop scheduling dispatching rules: further developments
-
Holthaus, O. and Rajendran, C. (2000), “Efficient jobshop scheduling dispatching rules: further developments”, Production Planning & Control, Vol. 11 No. 2, pp. 171-8.
-
(2000)
Production Planning & Control
, vol.11
, pp. 171-178
-
-
Holthaus, O.1
Rajendran, C.2
-
34
-
-
0034651053
-
New dispatching rules for shop scheduling: a step forward
-
Jayamohan, M. and Rajendran, C. (2000), “New dispatching rules for shop scheduling: a step forward”, International Journal of Production Research, Vol. 38 No. 3, pp. 563-86.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 563-586
-
-
Jayamohan, M.1
Rajendran, C.2
-
35
-
-
0032256280
-
Efficient Lagrangian relaxation algorithms for industry size job-shop scheduling problems
-
Kaskavelis, C. and Caramanis, M. (1998), “Efficient Lagrangian relaxation algorithms for industry size job-shop scheduling problems”, IIE Transactions, Vol. 30, pp. 1085-97.
-
(1998)
IIE Transactions
, vol.30
, pp. 1085-1097
-
-
Kaskavelis, C.1
Caramanis, M.2
-
37
-
-
0032741273
-
Open shop scheduling with makespan and total completion time criteria
-
Kyparisis, G. and Koulamas, C. (1998), “Open shop scheduling with makespan and total completion time criteria”, Computers & Operations Research, Vol. 27, pp. 15-27.
-
(1998)
Computers & Operations Research
, vol.27
, pp. 15-27
-
-
Kyparisis, G.1
Koulamas, C.2
-
39
-
-
0031121631
-
Job shop scheduling with a genetic algorithm and machine learning
-
Lee, C.-Y., Piramuthu, S. and Tsai, Y.-K. (1997), “Job shop scheduling with a genetic algorithm and machine learning”, International Journal of Production Research, Vol. 35 No. 4, pp. 1171-91.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 1171-1191
-
-
Lee, C.-Y.1
Piramuthu, S.2
Tsai, Y.-K.3
-
40
-
-
0030147542
-
Short-term hydro scheduling using Hopfield neural network
-
Liang, R. and Hsu, Y. (1996), “Short-term hydro scheduling using Hopfield neural network”, IEE Pro.-Gener. Transm. Distrib., Vol. 143, pp. 269-75.
-
(1996)
IEE Pro.-Gener. Transm. Distrib.
, vol.143
, pp. 269-275
-
-
Liang, R.1
Hsu, Y.2
-
41
-
-
0034175303
-
Intelligent scheduling model and algorithm for manufacturing
-
Liangsheng, G., Gang, S. and Shuchun, W. (2000), “Intelligent scheduling model and algorithm for manufacturing”, Production Planning & Control, Vol. 11 No. 3, pp. 234-43.
-
(2000)
Production Planning & Control
, vol.11
, pp. 234-243
-
-
Liangsheng, G.1
Gang, S.2
Shuchun, W.3
-
42
-
-
84986015487
-
-
“Manufacturing open systems”
-
Lindholm, E. (1992), “Manufacturing open systems”, Datamation, Vol. 38, pp. 105-6.
-
(1992)
Datamation
, vol.38
, pp. 105-106
-
-
Lindholm, E.1
-
43
-
-
0042985719
-
CIMII: The Integrated Manufacturing Enterprise
-
Lopes, P.F. (1992), “CIMII: The Integrated Manufacturing Enterprise”, Industrial Engineering, Vol. 24, pp. 43-5.
-
(1992)
Industrial Engineering
, vol.24
, pp. 43-45
-
-
Lopes, P.F.1
-
44
-
-
0022241624
-
MARS – an expert system using the automated reasoning reasoning tool to schedule resources
-
Instrument Society of America, Pittsburgh, PA
-
Marsh, C.A. (1985), “MARS – an expert system using the automated reasoning reasoning tool to schedule resources”, Robotics and Expert Systems – Proceedings of Robex 85, Instrument Society of America, Pittsburgh, PA, pp. 123-5.
-
(1985)
Robotics and Expert Systems – Proceedings of Robex 85
, pp. 123-125
-
-
Marsh, C.A.1
-
45
-
-
0033359123
-
A branch-and-bound algorithm for permutation flow shops with sequence-dependent set-up times
-
Mercado, R. and Bard, J. (1999), “A branch-and-bound algorithm for permutation flow shops with sequence-dependent set-up times”, IIE Transactions, Vol. 31, pp. 721-31.
-
(1999)
IIE Transactions
, vol.31
, pp. 721-731
-
-
Mercado, R.1
Bard, J.2
-
46
-
-
21844503079
-
Enhancing competitiveness through the new market value equation
-
Meredith, J.R., McCutcheon, D.M. and Hartley, J. (1994), “Enhancing competitiveness through the new market value equation”, International Journal of Operations & Production Management, Vol. 14 No. 11, pp. 7-22.
-
(1994)
International Journal of Operations & Production Management
, vol.14
, pp. 7-22
-
-
Meredith, J.R.1
McCutcheon, D.M.2
Hartley, J.3
-
47
-
-
0035780959
-
An elaborate analysis of production systems in industry: what a consultant should know
-
Metaxiotis, K.S., Ergazakis, K.A. and Psarras, J.E. (2001a), “An elaborate analysis of production systems in industry: what a consultant should know”, Industrial Management & Data Systems, Vol. 101 No. 4, pp. 185-93.
-
(2001)
Industrial Management & Data Systems
, vol.101
, pp. 185-193
-
-
Metaxiotis, K.S.1
Ergazakis, K.A.2
Psarras, J.E.3
-
48
-
-
0042486013
-
Expert systems in production planning and scheduling: a state-of-the-art survey
-
Kluwer, Dordrecht.
-
Metaxiotis, K.S., Askounis, D. and Psarras, J. (2001b), “Expert systems in production planning and scheduling: a state-of-the-art survey”, Journal of Intelligent Manufacturing, Kluwer, Dordrecht.
-
(2001)
Journal of Intelligent Manufacturing
-
-
Metaxiotis, K.S.1
Askounis, D.2
Psarras, J.3
-
49
-
-
84986033097
-
Production scheduling with dynamic selection of scheduling algorithms: an intelligent approach
-
paper presented at the 16th International Conference on Production Research, Prague, August.
-
Metaxiotis, K., Psarras, J. and Ergazakis, K. (2001c), “Production scheduling with dynamic selection of scheduling algorithms: an intelligent approach”, paper presented at the 16th International Conference on Production Research, Prague, August.
-
(2001)
-
-
Metaxiotis, K.1
Psarras, J.2
Ergazakis, K.3
-
50
-
-
0032642660
-
Genetic algorithms in integrated process planning and scheduling
-
Morad, N. and Zalzala, A. (1999), “Genetic algorithms in integrated process planning and scheduling”, Journal of Intelligent Manufacturing, Vol. 10, pp. 169-79.
-
(1999)
Journal of Intelligent Manufacturing
, vol.10
, pp. 169-179
-
-
Morad, N.1
Zalzala, A.2
-
51
-
-
0003949709
-
-
John Wiley & Sons, New York, NY.
-
Morton, T. and Pentico, D. (1993), Heuristic Scheduling Systems, John Wiley & Sons, New York, NY.
-
(1993)
Heuristic Scheduling Systems
-
-
Morton, T.1
Pentico, D.2
-
52
-
-
0009765219
-
PATRIARCH: a multilevel system for cost accounting, planning, scheduling
-
partial working document, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburg, PA.
-
Morton, T.E., Fox, M. and Sathi, A. (1984), “PATRIARCH: a multilevel system for cost accounting, planning, scheduling”, partial working document, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburg, PA.
-
(1984)
-
-
Morton, T.E.1
Fox, M.2
Sathi, A.3
-
53
-
-
0041992460
-
An improved heuristic for the single-machine, weighted-tardiness problem
-
Moursli, M. and Pochet, M. (2000), “An improved heuristic for the single-machine, weighted-tardiness problem”, Omega, Vol. 27, pp. 485-95.
-
(2000)
Omega
, vol.27
, pp. 485-495
-
-
Moursli, M.1
Pochet, M.2
-
54
-
-
0030241820
-
Multi-objective genetic algorithm and its applications to flow shop scheduling
-
Murata, T., Ishibuchi, H. and Tanaka, H. (1996a), “Multi-objective genetic algorithm and its applications to flow shop scheduling”, Computers Industrial Engineering, Vol. 30 No. 4,pp. 957-68.
-
(1996)
Computers Industrial Engineering
, vol.30
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
55
-
-
0030241443
-
Genetic algorithms for flowshop scheduling problems
-
Murata, T., Ishibuchi, H. and Tanaka, H. (1996b), “Genetic algorithms for flowshop scheduling problems”, Computers Industrial Engineering, Vol. 30 No. 4, pp. 1061-71.
-
(1996)
Computers Industrial Engineering
, vol.30
, pp. 1061-1071
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
57
-
-
0009809628
-
Viewing scheduling as an opportunistic problem-solving process
-
working paper, Carnegie-Mellon University, Pittsburgh, PA.
-
Ow, P.S. and Smith, S.F. (1986), “Viewing scheduling as an opportunistic problem-solving process”, working paper, Carnegie-Mellon University, Pittsburgh, PA.
-
(1986)
-
-
Ow, P.S.1
Smith, S.F.2
-
58
-
-
0000107307
-
Characterizing the manufacturing-scheduling problem
-
Panurak, V.H.D. (1991), “Characterizing the manufacturing-scheduling problem”, Journal of Manufacturing Systems, Vol. 10 No. 3, pp. 241-52.
-
(1991)
Journal of Manufacturing Systems
, vol.10
, pp. 241-252
-
-
Panurak, V.H.D.1
-
59
-
-
0032184310
-
An object oriented production planning system development in an ERP environment
-
Park, H., Kim, Y. and Park, S. (1999), “An object oriented production planning system development in an ERP environment”, Computers in Industrial Engineering, Vol. 35 No. 1-2, pp. 157-60.
-
(1999)
Computers in Industrial Engineering
, vol.35
, pp. 157-160
-
-
Park, H.1
Kim, Y.2
Park, S.3
-
60
-
-
0033717569
-
Scheduling jobs on parallel machines applying neural network and heuristic rules
-
Park, Y., Kim, S. and Lee, Y. (2000), “Scheduling jobs on parallel machines applying neural network and heuristic rules”, Computers & Industrial Engineering, Vol. 38 No. 1, pp. 189-202.
-
(2000)
Computers & Industrial Engineering
, vol.38
, pp. 189-202
-
-
Park, Y.1
Kim, S.2
Lee, Y.3
-
61
-
-
0034630792
-
The choice of dispatching rules in a shop using internally set due-dates with quoted leadtime and tardiness costs
-
Philipoom, P. (2000), “The choice of dispatching rules in a shop using internally set due-dates with quoted leadtime and tardiness costs”, International Journal of Production Research, Vol. 38 No. 7, pp. 1641-55.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 1641-1655
-
-
Philipoom, P.1
-
62
-
-
0003438602
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Pinedo, M. (1995), Scheduling: Theory, Algorithms and Applications, Prentice-Hall, Englewood Cliffs, NJ, pp. 9-14.
-
(1995)
Scheduling: Theory, Algorithms and Applications
, pp. 9-14
-
-
Pinedo, M.1
-
63
-
-
0003687099
-
-
McGraw-Hill, New York, NY
-
Pinedo, M. and Chao, X. (1999), Operations Scheduling with Applications in Manufacturing and Services, McGraw-Hill, New York, NY, pp. 15-23.
-
(1999)
Operations Scheduling with Applications in Manufacturing and Services
, pp. 15-23
-
-
Pinedo, M.1
Chao, X.2
-
64
-
-
0042155737
-
Design issues with regard to scheduling systems in manufacturing
-
Pinedo, M., Samroengraja, R. and Yen, P.C. (1994), “Design issues with regard to scheduling systems in manufacturing”, Control and Dynamic Systems, Vol. 60 pp. 203-38.
-
(1994)
Control and Dynamic Systems
, vol.60
, pp. 203-238
-
-
Pinedo, M.1
Samroengraja, R.2
Yen, P.C.3
-
65
-
-
0033721287
-
The application of parallel multipopulation genetic algorithms to dynamic job-shop scheduling
-
Qi, J.G., Burns, G.R. and Harrison, D.K. (2000), “The application of parallel multipopulation genetic algorithms to dynamic job-shop scheduling”, International Journal of Advanced Manufacturing Technology, Vol. 16, pp. 609-15.
-
(2000)
International Journal of Advanced Manufacturing Technology
, vol.16
, pp. 609-615
-
-
Qi, J.G.1
Burns, G.R.2
Harrison, D.K.3
-
66
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flowshops and jobshops
-
Rajendran, C. and Holthaus, O. (1999), “A comparative study of dispatching rules in dynamic flowshops and jobshops”, European Journal of Operational Research, No. 116, pp. 156-70.
-
(1999)
European Journal of Operational Research
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
67
-
-
0034659575
-
Dispatching rules for scheduling in assembly shops
-
Rajendran, C. and Reeja, M. (2000), “Dispatching rules for scheduling in assembly shops”, International Journal of Production Research, Vol. 38 No. 9, pp. 2051-66.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 2051-2066
-
-
Rajendran, C.1
Reeja, M.2
-
68
-
-
0035897984
-
A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs
-
Rajendran, C. and Ziegler, H. (2001), “A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs”, European Journal of Operational Research, Vol. 131 No. 3, pp. 622-34.
-
(2001)
European Journal of Operational Research
, vol.131
, pp. 622-634
-
-
Rajendran, C.1
Ziegler, H.2
-
69
-
-
29444438437
-
Dynamic job shop scheduling: a survey of simulation research
-
Ramasesh, R. (1990), “Dynamic job shop scheduling: a survey of simulation research”, Omega, Vol. 18, pp. 34-40.
-
(1990)
Omega
, vol.18
, pp. 34-40
-
-
Ramasesh, R.1
-
70
-
-
0009807158
-
-
Technical paper MM-1093, Society of Manufacturing Engineers, Dearborn, MI.
-
Robbins, J.H. (1985), PEPS: The Prototype Expert Priority Scheduler, Technical paper MM-1093, Society of Manufacturing Engineers, Dearborn, MI.
-
(1985)
PEPS: The Prototype Expert Priority Scheduler
-
-
Robbins, J.H.1
-
71
-
-
84893565762
-
ERP software: characteristics and consequences
-
paper presented at the 7th European Conference on Information Systems – ECIS ’99, Copenhagen, June.
-
Rosemann, M. (1999), “ERP software: characteristics and consequences”, paper presented at the 7th European Conference on Information Systems – ECIS ’99, Copenhagen, June.
-
(1999)
-
-
Rosemann, M.1
-
72
-
-
84986135018
-
Structuring and modeling knowledge in the context of enterprise resource planning
-
paper presented at the 4th Pacific Asia Conference on Information Systems – PACIS 2000, Hong-Kong, June.
-
Rosemann, M. (2000), “Structuring and modeling knowledge in the context of enterprise resource planning”, paper presented at the 4th Pacific Asia Conference on Information Systems – PACIS 2000, Hong-Kong, June.
-
(2000)
-
-
Rosemann, M.1
-
73
-
-
0032784020
-
An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
-
Sabuncuoglu, I. (1999), “An analysis of heuristics in a dynamic job shop with weighted tardiness objectives”, International Journal of Production Research, Vol. 37 No. 1, pp. 165-87.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 165-187
-
-
Sabuncuoglu, I.1
-
74
-
-
0346438795
-
A large step random walk for minimizing total weighted tardiness in a job shop
-
Suliman, K. (2000), “A large step random walk for minimizing total weighted tardiness in a job shop”, Journal of Scheduling, Vol. 3, pp. 125-38.
-
(2000)
Journal of Scheduling
, vol.3
, pp. 125-138
-
-
Suliman, K.1
-
75
-
-
0033881797
-
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
-
Sakawa, M. and. Kubota, R (2000), “Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms”, European Journal of Operation Research, Vol. 120, pp. 393-407.
-
(2000)
European Journal of Operation Research
, vol.120
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
77
-
-
0001868119
-
Scheduling problems and travelling salesmen: the genetic edge recombination operator
-
Whitley, D., Starkweather, T. and Fuquay, D. (1989), “Scheduling problems and travelling salesmen: the genetic edge recombination operator”, Proceedings of the 3rd International Conference on Genetic Algorithms, pp. 133-40.
-
(1989)
Proceedings of the 3rd International Conference on Genetic Algorithms
, pp. 133-140
-
-
Whitley, D.1
Starkweather, T.2
Fuquay, D.3
-
78
-
-
21344489411
-
Utilization and benefits of expert systems in manufacturing: a study of large American industrial corporations
-
Wong, B.K., Chong, J.K.S. and Park, J. (1994), “Utilization and benefits of expert systems in manufacturing: a study of large American industrial corporations”, International Journal of Operations & Production Management, Vol. 14 No. 1, pp. 38-49.
-
(1994)
International Journal of Operations & Production Management
, vol.14
, pp. 38-49
-
-
Wong, B.K.1
Chong, J.K.S.2
Park, J.3
-
79
-
-
0042656835
-
On the architecture of an object-oriented scheduling system
-
PhD thesis, Department of Industrial Engineering and Operations Research, Columbia University, New York, NY.
-
Yen, P.C. (1995), “On the architecture of an object-oriented scheduling system”, PhD thesis, Department of Industrial Engineering and Operations Research, Columbia University, New York, NY.
-
(1995)
-
-
Yen, P.C.1
-
80
-
-
0035309164
-
Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling
-
Yu, H. and Liang, W. (2001), “Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling”, Computers & Industrial Engineering, Vol. 39 No. 3-4, pp. 337-56.
-
(2001)
Computers & Industrial Engineering
, vol.39
, pp. 337-356
-
-
Yu, H.1
Liang, W.2
-
82
-
-
0020822392
-
The OPT scheduling system: a review of a new production-scheduling system
-
Jacobs, R.D. (1983), “The OPT scheduling system: a review of a new production-scheduling system”, Production and Inventory Management, Vol. 24 No. 3.
-
(1983)
Production and Inventory Management
, vol.24
-
-
Jacobs, R.D.1
|