메뉴 건너뛰기




Volumn 9, Issue 2, 2003, Pages 221-247

Production scheduling in ERP systems: An AI-based approach to face the gap

Author keywords

Knowledge based systems; Production; Resource management; Scheduling

Indexed keywords


EID: 84986165608     PISSN: 14637154     EISSN: None     Source Type: Journal    
DOI: 10.1108/14637150310468416     Document Type: Article
Times cited : (35)

References (82)
  • 1
    • 1542584143 scopus 로고    scopus 로고
    • Advanced planning and scheduling systems: just a fad or a breakthrough in manufacturing and supply chain management?
    • December.
    • Advanced Manufacturing Research Inc. (1996), “Advanced planning and scheduling systems: just a fad or a breakthrough in manufacturing and supply chain management?”, The Report on Manufacturing, December.
    • (1996) The Report on Manufacturing
  • 4
    • 0026126118 scopus 로고
    • A computational study of the job-shop scheduling problem
    • Applegate, D. and Cook, W. (1991), “A computational study of the job-shop scheduling problem”, ORSA Journal of Computing, No. 3, pp. 149-56.
    • (1991) ORSA Journal of Computing , pp. 149-156
    • Applegate, D.1    Cook, W.2
  • 5
    • 0033102073 scopus 로고    scopus 로고
    • Tabu search for total tardiness minimization in flowshop scheduling problems
    • Armentano, A. and Ronconi, D. (1999), “Tabu search for total tardiness minimization in flowshop scheduling problems”, Computers & Operations Research, Vol. 26, pp. 219-35.
    • (1999) Computers & Operations Research , vol.26 , pp. 219-235
    • Armentano, A.1    Ronconi, D.2
  • 7
    • 0024907528 scopus 로고
    • Expert systems can do job shop scheduling: an exploration and a proposal
    • Biegel, J.E. and Wink, L.J. (1989), “Expert systems can do job shop scheduling: an exploration and a proposal”, Computers & Industrial Engineering, Vol. 17 No. 1, pp. 347-52.
    • (1989) Computers & Industrial Engineering , vol.17 , pp. 347-352
    • Biegel, J.E.1    Wink, L.J.2
  • 9
    • 0032295711 scopus 로고    scopus 로고
    • A genetic algorithm based procedure for more realistic scheduling problems
    • Candido, M.A., Khator, S.K. and Barcia, R.M. (1998), “A genetic algorithm based procedure for more realistic scheduling problems”, International Journal of Production Research, Vol. 36 No. 12, pp. 3437-57.
    • (1998) International Journal of Production Research , vol.36 , pp. 3437-3457
    • Candido, M.A.1    Khator, S.K.2    Barcia, R.M.3
  • 10
    • 0032131027 scopus 로고    scopus 로고
    • Hybrid genetic algorithms for a multiple-objective scheduling problem
    • Cavalieri, S. and Gaiardelli, P. (1997), “Hybrid genetic algorithms for a multiple-objective scheduling problem”, Journal of Intelligent Manufacturing, Vol. 9, pp. 361-7.
    • (1997) Journal of Intelligent Manufacturing , vol.9 , pp. 361-367
    • Cavalieri, S.1    Gaiardelli, P.2
  • 11
    • 0347138149 scopus 로고    scopus 로고
    • Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach
    • Chang, P.T. and Lo, Y.T. (2001), “Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach”, International Journal of Computer Integrated Manufacturing, Vol. 14 No. 4, pp. 367-84.
    • (2001) International Journal of Computer Integrated Manufacturing , vol.14 , pp. 367-384
    • Chang, P.T.1    Lo, Y.T.2
  • 12
    • 84986070331 scopus 로고
    • An expert system for dynamic manufacturing rescheduling
    • paper presented at the Symposium on Real Time Optimisation in Automated Manufacturing Facilities, National Bureau of Standards, Gaithersburg, MD.
    • Chiodini, V. (1980), “An expert system for dynamic manufacturing rescheduling”, paper presented at the Symposium on Real Time Optimisation in Automated Manufacturing Facilities, National Bureau of Standards, Gaithersburg, MD.
    • (1980)
    • Chiodini, V.1
  • 13
    • 0035360038 scopus 로고    scopus 로고
    • “Dynamic scheduling of manufacturing job shops using genetic algorithms”
    • Chryssolouris, G. and Subraniam, V. (2001), “Dynamic scheduling of manufacturing job shops using genetic algorithms”, Journal of Intelligent Manufacturing, Vol. 12, pp. 281-93.
    • (2001) Journal of Intelligent Manufacturing , vol.12 , pp. 281-293
    • Chryssolouris, G.1    Subraniam, V.2
  • 14
    • 0001937142 scopus 로고
    • Effective capacity planning for automated factories requires workable simulation tools and responsive shopfloor controls
    • April
    • Classen, R.J. and Malstrom, E.M. (1982), “Effective capacity planning for automated factories requires workable simulation tools and responsive shopfloor controls”, Industrial Engineering, April, pp. 73-9.
    • (1982) Industrial Engineering , pp. 73-79
    • Classen, R.J.1    Malstrom, E.M.2
  • 20
    • 0000332876 scopus 로고    scopus 로고
    • Decomposition methods for re-etrant flow shops with sequence-dependent set-up times
    • Demirkol E. and Uzsoy, R. (2000), “Decomposition methods for re-etrant flow shops with sequence-dependent set-up times”, Journal of Scheduling, Vol. 3 No. 3, pp. 155-77.
    • (2000) Journal of Scheduling , vol.3 , pp. 155-177
    • Demirkol, E.1    Uzsoy, R.2
  • 21
    • 0032156495 scopus 로고    scopus 로고
    • Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness
    • Dessouky, M. (1998), “Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness”, Computers & Industrial Engineering, Vol. 34 No. 4, pp. 793-806.
    • (1998) Computers & Industrial Engineering , vol.34 , pp. 793-806
    • Dessouky, M.1
  • 22
    • 0032678513 scopus 로고    scopus 로고
    • Scheduling pre-emptive jobs with precedence constraints on parallel machines
    • Djellab, K. (1998), “Scheduling pre-emptive jobs with precedence constraints on parallel machines”, European Journal of Operational Research, Vol. 11, pp. 355-67.
    • (1998) European Journal of Operational Research , vol.11 , pp. 355-367
    • Djellab, K.1
  • 23
    • 0002184666 scopus 로고
    • A status report: artificial intelligence
    • Dornan, B. (1987), “A status report: artificial intelligence”, Production, pp. 46-50.
    • (1987) Production , pp. 46-50
    • Dornan, B.1
  • 26
    • 0024122608 scopus 로고
    • Stochastic neural networks for solving job-shop scheduling: Part I: problem presentation
    • San Diego, CA
    • Foo, Y.P. and Takefuji, Y. (1988), “Stochastic neural networks for solving job-shop scheduling: Part I: problem presentation”, IEEE International Conference on Neural Networks, San Diego, CA, Vol. II, pp. 275-80.
    • (1988) IEEE International Conference on Neural Networks , vol.2 , pp. 275-280
    • Foo, Y.P.1    Takefuji, Y.2
  • 27
    • 84982522109 scopus 로고
    • ISIS: a knowledge-based system for factory scheduling
    • Fox, M.S. and Smith, S.F. (1984), “ISIS: a knowledge-based system for factory scheduling”, Expert Systems, Vol. 1 No. 1, pp. 25-49.
    • (1984) Expert Systems , vol.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.F.2
  • 28
    • 0032599597 scopus 로고    scopus 로고
    • Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: heuristic mixing method machines and precedence
    • Ghedjati (1999), “Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: heuristic mixing method machines and precedence”, Computers & Industrial Engineering, Vol. 37, pp. 39-42.
    • (1999) Computers & Industrial Engineering , vol.37 , pp. 39-42
    • Ghedjati1
  • 30
    • 84986141371 scopus 로고    scopus 로고
    • Scheduling in job shops with machine breakdowns: an experimental study
    • Holthaus, O. (1999), “Scheduling in job shops with machine breakdowns: an experimental study”, Computers & Industrial Engineering, Vol. 37 No. 1-2, pp. 1-504.
    • (1999) Computers & Industrial Engineering , vol.37 , pp. 1-504
    • Holthaus, O.1
  • 32
    • 0034161039 scopus 로고    scopus 로고
    • Efficient jobshop scheduling dispatching rules: further developments
    • Holthaus, O. and Rajendran, C. (2000), “Efficient jobshop scheduling dispatching rules: further developments”, Production Planning & Control, Vol. 11 No. 2, pp. 171-8.
    • (2000) Production Planning & Control , vol.11 , pp. 171-178
    • Holthaus, O.1    Rajendran, C.2
  • 35
    • 0032256280 scopus 로고    scopus 로고
    • Efficient Lagrangian relaxation algorithms for industry size job-shop scheduling problems
    • Kaskavelis, C. and Caramanis, M. (1998), “Efficient Lagrangian relaxation algorithms for industry size job-shop scheduling problems”, IIE Transactions, Vol. 30, pp. 1085-97.
    • (1998) IIE Transactions , vol.30 , pp. 1085-1097
    • Kaskavelis, C.1    Caramanis, M.2
  • 37
    • 0032741273 scopus 로고    scopus 로고
    • Open shop scheduling with makespan and total completion time criteria
    • Kyparisis, G. and Koulamas, C. (1998), “Open shop scheduling with makespan and total completion time criteria”, Computers & Operations Research, Vol. 27, pp. 15-27.
    • (1998) Computers & Operations Research , vol.27 , pp. 15-27
    • Kyparisis, G.1    Koulamas, C.2
  • 40
    • 0030147542 scopus 로고    scopus 로고
    • Short-term hydro scheduling using Hopfield neural network
    • Liang, R. and Hsu, Y. (1996), “Short-term hydro scheduling using Hopfield neural network”, IEE Pro.-Gener. Transm. Distrib., Vol. 143, pp. 269-75.
    • (1996) IEE Pro.-Gener. Transm. Distrib. , vol.143 , pp. 269-275
    • Liang, R.1    Hsu, Y.2
  • 41
    • 0034175303 scopus 로고    scopus 로고
    • Intelligent scheduling model and algorithm for manufacturing
    • Liangsheng, G., Gang, S. and Shuchun, W. (2000), “Intelligent scheduling model and algorithm for manufacturing”, Production Planning & Control, Vol. 11 No. 3, pp. 234-43.
    • (2000) Production Planning & Control , vol.11 , pp. 234-243
    • Liangsheng, G.1    Gang, S.2    Shuchun, W.3
  • 42
    • 84986015487 scopus 로고
    • “Manufacturing open systems”
    • Lindholm, E. (1992), “Manufacturing open systems”, Datamation, Vol. 38, pp. 105-6.
    • (1992) Datamation , vol.38 , pp. 105-106
    • Lindholm, E.1
  • 43
    • 0042985719 scopus 로고
    • CIMII: The Integrated Manufacturing Enterprise
    • Lopes, P.F. (1992), “CIMII: The Integrated Manufacturing Enterprise”, Industrial Engineering, Vol. 24, pp. 43-5.
    • (1992) Industrial Engineering , vol.24 , pp. 43-45
    • Lopes, P.F.1
  • 44
    • 0022241624 scopus 로고
    • MARS – an expert system using the automated reasoning reasoning tool to schedule resources
    • Instrument Society of America, Pittsburgh, PA
    • Marsh, C.A. (1985), “MARS – an expert system using the automated reasoning reasoning tool to schedule resources”, Robotics and Expert Systems – Proceedings of Robex 85, Instrument Society of America, Pittsburgh, PA, pp. 123-5.
    • (1985) Robotics and Expert Systems – Proceedings of Robex 85 , pp. 123-125
    • Marsh, C.A.1
  • 45
    • 0033359123 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for permutation flow shops with sequence-dependent set-up times
    • Mercado, R. and Bard, J. (1999), “A branch-and-bound algorithm for permutation flow shops with sequence-dependent set-up times”, IIE Transactions, Vol. 31, pp. 721-31.
    • (1999) IIE Transactions , vol.31 , pp. 721-731
    • Mercado, R.1    Bard, J.2
  • 47
    • 0035780959 scopus 로고    scopus 로고
    • An elaborate analysis of production systems in industry: what a consultant should know
    • Metaxiotis, K.S., Ergazakis, K.A. and Psarras, J.E. (2001a), “An elaborate analysis of production systems in industry: what a consultant should know”, Industrial Management & Data Systems, Vol. 101 No. 4, pp. 185-93.
    • (2001) Industrial Management & Data Systems , vol.101 , pp. 185-193
    • Metaxiotis, K.S.1    Ergazakis, K.A.2    Psarras, J.E.3
  • 48
    • 0042486013 scopus 로고    scopus 로고
    • Expert systems in production planning and scheduling: a state-of-the-art survey
    • Kluwer, Dordrecht.
    • Metaxiotis, K.S., Askounis, D. and Psarras, J. (2001b), “Expert systems in production planning and scheduling: a state-of-the-art survey”, Journal of Intelligent Manufacturing, Kluwer, Dordrecht.
    • (2001) Journal of Intelligent Manufacturing
    • Metaxiotis, K.S.1    Askounis, D.2    Psarras, J.3
  • 49
    • 84986033097 scopus 로고    scopus 로고
    • Production scheduling with dynamic selection of scheduling algorithms: an intelligent approach
    • paper presented at the 16th International Conference on Production Research, Prague, August.
    • Metaxiotis, K., Psarras, J. and Ergazakis, K. (2001c), “Production scheduling with dynamic selection of scheduling algorithms: an intelligent approach”, paper presented at the 16th International Conference on Production Research, Prague, August.
    • (2001)
    • Metaxiotis, K.1    Psarras, J.2    Ergazakis, K.3
  • 50
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • Morad, N. and Zalzala, A. (1999), “Genetic algorithms in integrated process planning and scheduling”, Journal of Intelligent Manufacturing, Vol. 10, pp. 169-79.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 169-179
    • Morad, N.1    Zalzala, A.2
  • 52
    • 0009765219 scopus 로고
    • PATRIARCH: a multilevel system for cost accounting, planning, scheduling
    • partial working document, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburg, PA.
    • Morton, T.E., Fox, M. and Sathi, A. (1984), “PATRIARCH: a multilevel system for cost accounting, planning, scheduling”, partial working document, Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburg, PA.
    • (1984)
    • Morton, T.E.1    Fox, M.2    Sathi, A.3
  • 53
    • 0041992460 scopus 로고    scopus 로고
    • An improved heuristic for the single-machine, weighted-tardiness problem
    • Moursli, M. and Pochet, M. (2000), “An improved heuristic for the single-machine, weighted-tardiness problem”, Omega, Vol. 27, pp. 485-95.
    • (2000) Omega , vol.27 , pp. 485-495
    • Moursli, M.1    Pochet, M.2
  • 54
    • 0030241820 scopus 로고    scopus 로고
    • Multi-objective genetic algorithm and its applications to flow shop scheduling
    • Murata, T., Ishibuchi, H. and Tanaka, H. (1996a), “Multi-objective genetic algorithm and its applications to flow shop scheduling”, Computers Industrial Engineering, Vol. 30 No. 4,pp. 957-68.
    • (1996) Computers Industrial Engineering , vol.30 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 55
    • 0030241443 scopus 로고    scopus 로고
    • Genetic algorithms for flowshop scheduling problems
    • Murata, T., Ishibuchi, H. and Tanaka, H. (1996b), “Genetic algorithms for flowshop scheduling problems”, Computers Industrial Engineering, Vol. 30 No. 4, pp. 1061-71.
    • (1996) Computers Industrial Engineering , vol.30 , pp. 1061-1071
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 57
    • 0009809628 scopus 로고
    • Viewing scheduling as an opportunistic problem-solving process
    • working paper, Carnegie-Mellon University, Pittsburgh, PA.
    • Ow, P.S. and Smith, S.F. (1986), “Viewing scheduling as an opportunistic problem-solving process”, working paper, Carnegie-Mellon University, Pittsburgh, PA.
    • (1986)
    • Ow, P.S.1    Smith, S.F.2
  • 58
    • 0000107307 scopus 로고
    • Characterizing the manufacturing-scheduling problem
    • Panurak, V.H.D. (1991), “Characterizing the manufacturing-scheduling problem”, Journal of Manufacturing Systems, Vol. 10 No. 3, pp. 241-52.
    • (1991) Journal of Manufacturing Systems , vol.10 , pp. 241-252
    • Panurak, V.H.D.1
  • 59
    • 0032184310 scopus 로고    scopus 로고
    • An object oriented production planning system development in an ERP environment
    • Park, H., Kim, Y. and Park, S. (1999), “An object oriented production planning system development in an ERP environment”, Computers in Industrial Engineering, Vol. 35 No. 1-2, pp. 157-60.
    • (1999) Computers in Industrial Engineering , vol.35 , pp. 157-160
    • Park, H.1    Kim, Y.2    Park, S.3
  • 60
    • 0033717569 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines applying neural network and heuristic rules
    • Park, Y., Kim, S. and Lee, Y. (2000), “Scheduling jobs on parallel machines applying neural network and heuristic rules”, Computers & Industrial Engineering, Vol. 38 No. 1, pp. 189-202.
    • (2000) Computers & Industrial Engineering , vol.38 , pp. 189-202
    • Park, Y.1    Kim, S.2    Lee, Y.3
  • 61
    • 0034630792 scopus 로고    scopus 로고
    • The choice of dispatching rules in a shop using internally set due-dates with quoted leadtime and tardiness costs
    • Philipoom, P. (2000), “The choice of dispatching rules in a shop using internally set due-dates with quoted leadtime and tardiness costs”, International Journal of Production Research, Vol. 38 No. 7, pp. 1641-55.
    • (2000) International Journal of Production Research , vol.38 , pp. 1641-1655
    • Philipoom, P.1
  • 64
    • 0042155737 scopus 로고
    • Design issues with regard to scheduling systems in manufacturing
    • Pinedo, M., Samroengraja, R. and Yen, P.C. (1994), “Design issues with regard to scheduling systems in manufacturing”, Control and Dynamic Systems, Vol. 60 pp. 203-38.
    • (1994) Control and Dynamic Systems , vol.60 , pp. 203-238
    • Pinedo, M.1    Samroengraja, R.2    Yen, P.C.3
  • 65
    • 0033721287 scopus 로고    scopus 로고
    • The application of parallel multipopulation genetic algorithms to dynamic job-shop scheduling
    • Qi, J.G., Burns, G.R. and Harrison, D.K. (2000), “The application of parallel multipopulation genetic algorithms to dynamic job-shop scheduling”, International Journal of Advanced Manufacturing Technology, Vol. 16, pp. 609-15.
    • (2000) International Journal of Advanced Manufacturing Technology , vol.16 , pp. 609-615
    • Qi, J.G.1    Burns, G.R.2    Harrison, D.K.3
  • 66
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flowshops and jobshops
    • Rajendran, C. and Holthaus, O. (1999), “A comparative study of dispatching rules in dynamic flowshops and jobshops”, European Journal of Operational Research, No. 116, pp. 156-70.
    • (1999) European Journal of Operational Research , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 68
    • 0035897984 scopus 로고    scopus 로고
    • A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs
    • Rajendran, C. and Ziegler, H. (2001), “A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs”, European Journal of Operational Research, Vol. 131 No. 3, pp. 622-34.
    • (2001) European Journal of Operational Research , vol.131 , pp. 622-634
    • Rajendran, C.1    Ziegler, H.2
  • 69
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: a survey of simulation research
    • Ramasesh, R. (1990), “Dynamic job shop scheduling: a survey of simulation research”, Omega, Vol. 18, pp. 34-40.
    • (1990) Omega , vol.18 , pp. 34-40
    • Ramasesh, R.1
  • 70
  • 71
    • 84893565762 scopus 로고    scopus 로고
    • ERP software: characteristics and consequences
    • paper presented at the 7th European Conference on Information Systems – ECIS ’99, Copenhagen, June.
    • Rosemann, M. (1999), “ERP software: characteristics and consequences”, paper presented at the 7th European Conference on Information Systems – ECIS ’99, Copenhagen, June.
    • (1999)
    • Rosemann, M.1
  • 72
    • 84986135018 scopus 로고    scopus 로고
    • Structuring and modeling knowledge in the context of enterprise resource planning
    • paper presented at the 4th Pacific Asia Conference on Information Systems – PACIS 2000, Hong-Kong, June.
    • Rosemann, M. (2000), “Structuring and modeling knowledge in the context of enterprise resource planning”, paper presented at the 4th Pacific Asia Conference on Information Systems – PACIS 2000, Hong-Kong, June.
    • (2000)
    • Rosemann, M.1
  • 73
    • 0032784020 scopus 로고    scopus 로고
    • An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
    • Sabuncuoglu, I. (1999), “An analysis of heuristics in a dynamic job shop with weighted tardiness objectives”, International Journal of Production Research, Vol. 37 No. 1, pp. 165-87.
    • (1999) International Journal of Production Research , vol.37 , pp. 165-187
    • Sabuncuoglu, I.1
  • 74
    • 0346438795 scopus 로고    scopus 로고
    • A large step random walk for minimizing total weighted tardiness in a job shop
    • Suliman, K. (2000), “A large step random walk for minimizing total weighted tardiness in a job shop”, Journal of Scheduling, Vol. 3, pp. 125-38.
    • (2000) Journal of Scheduling , vol.3 , pp. 125-138
    • Suliman, K.1
  • 75
    • 0033881797 scopus 로고    scopus 로고
    • Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
    • Sakawa, M. and. Kubota, R (2000), “Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms”, European Journal of Operation Research, Vol. 120, pp. 393-407.
    • (2000) European Journal of Operation Research , vol.120 , pp. 393-407
    • Sakawa, M.1    Kubota, R.2
  • 78
    • 21344489411 scopus 로고
    • Utilization and benefits of expert systems in manufacturing: a study of large American industrial corporations
    • Wong, B.K., Chong, J.K.S. and Park, J. (1994), “Utilization and benefits of expert systems in manufacturing: a study of large American industrial corporations”, International Journal of Operations & Production Management, Vol. 14 No. 1, pp. 38-49.
    • (1994) International Journal of Operations & Production Management , vol.14 , pp. 38-49
    • Wong, B.K.1    Chong, J.K.S.2    Park, J.3
  • 79
    • 0042656835 scopus 로고
    • On the architecture of an object-oriented scheduling system
    • PhD thesis, Department of Industrial Engineering and Operations Research, Columbia University, New York, NY.
    • Yen, P.C. (1995), “On the architecture of an object-oriented scheduling system”, PhD thesis, Department of Industrial Engineering and Operations Research, Columbia University, New York, NY.
    • (1995)
    • Yen, P.C.1
  • 80
    • 0035309164 scopus 로고    scopus 로고
    • Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling
    • Yu, H. and Liang, W. (2001), “Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling”, Computers & Industrial Engineering, Vol. 39 No. 3-4, pp. 337-56.
    • (2001) Computers & Industrial Engineering , vol.39 , pp. 337-356
    • Yu, H.1    Liang, W.2
  • 82
    • 0020822392 scopus 로고
    • The OPT scheduling system: a review of a new production-scheduling system
    • Jacobs, R.D. (1983), “The OPT scheduling system: a review of a new production-scheduling system”, Production and Inventory Management, Vol. 24 No. 3.
    • (1983) Production and Inventory Management , vol.24
    • Jacobs, R.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.