메뉴 건너뛰기




Volumn 4, Issue , 2015, Pages

Multi-purpose disassembly sequence planning

Author keywords

[No Author keywords available]

Indexed keywords

DESIGN; MAXIMUM LIKELIHOOD; OPTIMIZATION; PROBABILITY; REPAIR;

EID: 84979025795     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/DETC2015-46906     Document Type: Conference Paper
Times cited : (3)

References (34)
  • 1
    • 0033339836 scopus 로고    scopus 로고
    • A general approach to disassembly planning and control
    • H. Wiendahl and G. Seliger, "A general approach to disassembly planning and control, " Prod. Plan. Control, no. 8, pp. 718-726, 1999.
    • (1999) Prod. Plan. Control , Issue.8 , pp. 718-726
    • Wiendahl, H.1    Seliger, G.2
  • 2
    • 33748523509 scopus 로고    scopus 로고
    • A hierarchical approach to disassembly sequence planning for mechanical product
    • Dec
    • T. Dong, L. Zhang, R. Tong, and J. Dong, "A hierarchical approach to disassembly sequence planning for mechanical product, " Int. J. Adv. Manuf. Technol., vol. 30, no. 5-6, pp. 507-520, Dec. 2005.
    • (2005) Int. J. Adv. Manuf. Technol , vol.30 , Issue.5-6 , pp. 507-520
    • Dong, T.1    Zhang, L.2    Tong, R.3    Dong, J.4
  • 3
    • 84901255318 scopus 로고    scopus 로고
    • A heuristic for disassembly planning in remanufacturing system
    • Jan
    • J. Sung and B. Jeong, "A heuristic for disassembly planning in remanufacturing system., " ScientificWorldJournal., vol. 2014, p. 949527, Jan. 2014.
    • (2014) ScientificWorldJournal , vol.2014 , pp. 949527
    • Sung, J.1    Jeong, B.2
  • 4
    • 84885655160 scopus 로고    scopus 로고
    • Disassembly planning and sequencing for end-of-life products with RFID enriched information
    • Jun
    • H. Wan and V. Krishna Gonnuru, "Disassembly planning and sequencing for end-of-life products with RFID enriched information, " Robot. Comput. Integr. Manuf., vol. 29, no. 3, pp. 112-118, Jun. 2013.
    • (2013) Robot. Comput. Integr. Manuf , vol.29 , Issue.3 , pp. 112-118
    • Wan, H.1    Krishna Gonnuru, V.2
  • 5
    • 84867028202 scopus 로고    scopus 로고
    • End-of-life decision making with uncertain product return quantity
    • S. Behdad, A. S. Williams, and D. Thurston, "End-of-Life Decision Making With Uncertain Product Return Quantity, " Journal of Mechanical Design, vol. 134. p. 100902, 2012.
    • (2012) Journal of Mechanical Design , vol.134 , pp. 100902
    • Behdad, S.1    Williams, A.S.2    Thurston, D.3
  • 6
    • 85018222938 scopus 로고    scopus 로고
    • Lifecycle scenario design for product end-of-life strategy
    • S. Fukushige, K. Yamamoto, and Y. Umeda, "Lifecycle scenario design for product end-of-life strategy, " J. Remanufacturing, vol. 2, no. 1, p. 1, 2012.
    • (2012) J. Remanufacturing , vol.2 , Issue.1 , pp. 1
    • Fukushige, S.1    Yamamoto, K.2    Umeda, Y.3
  • 8
    • 0035866455 scopus 로고    scopus 로고
    • Disassembly sequence plan generation using a branch-And-bound algorithm
    • Jan
    • A. GÜngÖr and S. M. Gupta, "Disassembly sequence plan generation using a branch-And-bound algorithm, " Int. J. Prod. Res., vol. 39, no. 3, pp. 481-509, Jan. 2001.
    • (2001) Int. J. Prod. Res , vol.39 , Issue.3 , pp. 481-509
    • Güngör, A.1    Gupta, S.M.2
  • 9
    • 0034882408 scopus 로고    scopus 로고
    • Development of integrated design for disassembly and recycling in concurrent engineering
    • Feb
    • K. Chen, "Development of integrated design for disassembly and recycling in concurrent engineering, " Integr. Manuf. Syst., vol. 12, no. 1, pp. 67-79, Feb. 2001.
    • (2001) Integr. Manuf. Syst , vol.12 , Issue.1 , pp. 67-79
    • Chen, K.1
  • 10
    • 80053643210 scopus 로고    scopus 로고
    • Modeling and optimization for disassembly planning
    • no. September
    • A. Azab, A. Ziout, and W. ElMaraghy, "Modeling and optimization for disassembly planning, " in JJMIE, 2011, no. September, pp. 27-29.
    • JJMIE 2011 , pp. 27-29
    • Azab, A.1    Ziout, A.2    Elmaraghy, W.3
  • 11
    • 0037274721 scopus 로고    scopus 로고
    • Disassembly planning based on precedence relations among assemblies
    • F. Torres, S. T. Puente, and R. Aracil, "Disassembly planning based on precedence relations among assemblies, " Int. J. Adv. Manuf. Technol., vol. 21, pp. 317-327, 2003.
    • (2003) Int. J. Adv. Manuf. Technol , vol.21 , pp. 317-327
    • Torres, F.1    Puente, S.T.2    Aracil, R.3
  • 12
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly sequencing: A survey
    • Jan
    • a. J. D. Lambert, "Disassembly sequencing: A survey, " Int. J. Prod. Res., vol. 41, no. 16, pp. 3721-3759, Jan. 2003.
    • (2003) Int. J. Prod. Res , vol.41 , Issue.16 , pp. 3721-3759
    • Lambert, J.D.1
  • 13
    • 33947652668 scopus 로고    scopus 로고
    • Uncertainty management in optimal disassembly planning through learning-based strategies
    • S. Reveliotis, "Uncertainty management in optimal disassembly planning through learning-based strategies, " IIE Trans., 2007.
    • (2007) IIE Trans
    • Reveliotis, S.1
  • 14
    • 84896898601 scopus 로고    scopus 로고
    • Leveraging virtual reality experiences with mixed-integer nonlinear programming visualization of disassembly sequence planning under uncertainty
    • Feb
    • S. Behdad, L. P. Berg, D. Thurston, and J. Vance, "Leveraging Virtual Reality Experiences With Mixed-Integer Nonlinear Programming Visualization of Disassembly Sequence Planning Under Uncertainty, " J. Mech. Des., vol. 136, no. 4, p. 041005, Feb. 2014.
    • (2014) J. Mech. des , vol.136 , Issue.4 , pp. 041005
    • Behdad, S.1    Berg, L.P.2    Thurston, D.3    Vance, J.4
  • 18
    • 72149095756 scopus 로고    scopus 로고
    • A hybrid approach using ISM and fuzzy TOPSIS for the selection of reverse logistics provider
    • Nov
    • G. Kannan, S. Pokharel, and P. Sasi Kumar, "A hybrid approach using ISM and fuzzy TOPSIS for the selection of reverse logistics provider, " Resour. Conserv. Recycl., vol. 54, no. 1, pp. 28-36, Nov. 2009.
    • (2009) Resour. Conserv. Recycl , vol.54 , Issue.1 , pp. 28-36
    • Kannan, G.1    Pokharel, S.2    Sasi Kumar, P.3
  • 19
    • 84978986206 scopus 로고    scopus 로고
    • A production-remanufacturing inventory model with fuzzy
    • No. July
    • Z. Zhang, "A PRODUCTION-REMANUFACTURING INVENTORY MODEL WITH FUZZY RANDOM DEMAND, " 2010, no. July, pp. 11-14.
    • (2010) Random Demand , pp. 11-14
    • Zhang, Z.1
  • 20
    • 84902491421 scopus 로고    scopus 로고
    • Dynamic model and fuzzy robust control of uncertain closed-loop supply chain with time-varying delay in remanufacturing
    • Jun
    • S. Zhang, X. Zhao, and J. Zhang, "Dynamic Model and Fuzzy Robust Control of Uncertain Closed-Loop Supply Chain with Time-Varying Delay in Remanufacturing, " Ind. Eng. Chem. Res., vol. 53, no. 23, pp. 9805-9811, Jun. 2014.
    • (2014) Ind. Eng. Chem. Res , vol.53 , Issue.23 , pp. 9805-9811
    • Zhang, S.1    Zhao, X.2    Zhang, J.3
  • 21
    • 33846028582 scopus 로고    scopus 로고
    • An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
    • Jun
    • M. I. G. Salema, A. P. Barbosa-Povoa, and A. Q. Novais, "An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty, " Eur. J. Oper. Res., vol. 179, no. 3, pp. 1063-1077, Jun. 2007.
    • (2007) Eur. J. Oper. Res , vol.179 , Issue.3 , pp. 1063-1077
    • Salema, M.I.G.1    Barbosa-Povoa, A.P.2    Novais, A.Q.3
  • 22
    • 1642269093 scopus 로고    scopus 로고
    • Closed-loop supply chain models with product remanufacturing
    • Feb
    • R. C. Savaskan, S. Bhattacharya, and L. N. Van Wassenhove, "Closed-Loop Supply Chain Models with Product Remanufacturing, " Manage. Sci., vol. 50, no. 2, pp. 239-252, Feb. 2004.
    • (2004) Manage. Sci , vol.50 , Issue.2 , pp. 239-252
    • Savaskan, R.C.1    Bhattacharya, S.2    Van Wassenhove, L.N.3
  • 23
    • 84897495935 scopus 로고    scopus 로고
    • Fuzzy multi-objective recoverable remanufacturing planning decisions involving multiple components and multiple machines
    • Jun
    • T.-S. Su, "Fuzzy multi-objective recoverable remanufacturing planning decisions involving multiple components and multiple machines, " Comput. Ind. Eng., vol. 72, pp. 72-83, Jun. 2014.
    • (2014) Comput. Ind. Eng , vol.72 , pp. 72-83
    • Su, T.-S.1
  • 24
    • 85018221140 scopus 로고    scopus 로고
    • An integrated fuzzy approach for evaluating remanufacturing alternatives of a product design
    • Nov
    • X. Wang and H. K. Chan, "An integrated fuzzy approach for evaluating remanufacturing alternatives of a product design, " J. Remanufacturing, vol. 3, no. 1, p. 10, Nov. 2013.
    • (2013) J. Remanufacturing , vol.3 , Issue.1 , pp. 10
    • Wang, X.1    Chan, H.K.2
  • 25
    • 34147190047 scopus 로고    scopus 로고
    • Impact of uncertainty in the quality of returns on the profitability of a singleperiod refurbishing operation
    • Oct
    • C. Zikopoulos and G. Tagaras, "Impact of uncertainty in the quality of returns on the profitability of a singleperiod refurbishing operation, " Eur. J. Oper. Res., vol. 182, no. 1, pp. 205-225, Oct. 2007.
    • (2007) Eur. J. Oper. Res , vol.182 , Issue.1 , pp. 205-225
    • Zikopoulos, C.1    Tagaras, G.2
  • 27
    • 84978967910 scopus 로고    scopus 로고
    • Remanufacturing planning with different quality levels for product returns
    • Nov
    • M. Ferguson, V. D. R. Guide, E. Koca, and G. Souza, "Remanufacturing Planning with Different Quality Levels for Product Returns, " SSRN Electron. J., Nov. 2006.
    • (2006) SSRN Electron. J
    • Ferguson, M.1    Guide, V.D.R.2    Koca, E.3    Souza, G.4
  • 29
    • 84871775397 scopus 로고    scopus 로고
    • Assembly strategies for remanufacturing systems with variable quality returns
    • Jan
    • X. Jin, S. J. Hu, J. Ni, and G. Xiao, "Assembly Strategies for Remanufacturing Systems With Variable Quality Returns, " IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 76-85, Jan. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng , vol.10 , Issue.1 , pp. 76-85
    • Jin, X.1    Hu, S.J.2    Ni, J.3    Xiao, G.4
  • 30
    • 79957631311 scopus 로고    scopus 로고
    • Optimal control of reassembly with variable quality returns in a product remanufacturing system
    • Jan
    • X. Jin, J. Ni, and Y. Koren, "Optimal control of reassembly with variable quality returns in a product remanufacturing system, " CIRP Ann.-Manuf. Technol., vol. 60, no. 1, pp. 25-28, Jan. 2011.
    • (2011) CIRP Ann.-Manuf. Technol , vol.60 , Issue.1 , pp. 25-28
    • Jin, X.1    Ni, J.2    Koren, Y.3
  • 32
    • 77955192654 scopus 로고    scopus 로고
    • Simultaneous selective disassembly and end-of-life decision making for multiple products that share disassembly operations
    • April
    • S. Behdad, M. Kwak, H. Kim, and D. Thurston, "Simultaneous Selective Disassembly and End-of-Life Decision Making for Multiple Products That Share Disassembly Operations, " J. Mech. Des., vol. 132, no. April, p. 041002, 2010.
    • (2010) J. Mech. des , vol.132 , pp. 041002
    • Behdad, S.1    Kwak, M.2    Kim, H.3    Thurston, D.4
  • 34
    • 84979035782 scopus 로고    scopus 로고
    • https://www.ifixit.com/Guide/D%C3%A9montage+Samsung+ NaviBot+SR8855+%28Fran%C3%A7ais%29/15522.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.