-
1
-
-
84901322311
-
Dynamic safety risk analysis of offshore drilling
-
Abimbola, M., Khan, F., Khakzad, N., Dynamic safety risk analysis of offshore drilling. J. Loss Prev. Process Ind. 30:July (2014), 74–85.
-
(2014)
J. Loss Prev. Process Ind.
, vol.30
, pp. 74-85
-
-
Abimbola, M.1
Khan, F.2
Khakzad, N.3
-
2
-
-
38849163642
-
Quantifying occupational risk: the development of an occupational risk model
-
Ale, B.J.M., Baksteen, H., Bellamy, L.J., Bloemhof, A., Goossens, L.H., Hale, A.R., Mud, M.L., Oh, J., Papazoglou, I.A., Post, J., Whiston, J.Y., Quantifying occupational risk: the development of an occupational risk model. Saf. Sci. 46:2 (2008), 176–185.
-
(2008)
Saf. Sci.
, vol.46
, Issue.2
, pp. 176-185
-
-
Ale, B.J.M.1
Baksteen, H.2
Bellamy, L.J.3
Bloemhof, A.4
Goossens, L.H.5
Hale, A.R.6
Mud, M.L.7
Oh, J.8
Papazoglou, I.A.9
Post, J.10
Whiston, J.Y.11
-
3
-
-
43449138490
-
Accidents in the construction industry in the Netherlands: an analysis of accident reports using Storybuilder
-
Ale, B.J.M., Bellamy, L.J., Baksteen, H., Damen, M., Goossens, L.H.J., Hale, A.R., Mud, M., Oh, J., Papazoglou, I.A., Whiston, J.Y., Accidents in the construction industry in the Netherlands: an analysis of accident reports using Storybuilder. Reliab. Eng. Syst. Saf. 93:10 (2008), 1523–1533.
-
(2008)
Reliab. Eng. Syst. Saf.
, vol.93
, Issue.10
, pp. 1523-1533
-
-
Ale, B.J.M.1
Bellamy, L.J.2
Baksteen, H.3
Damen, M.4
Goossens, L.H.J.5
Hale, A.R.6
Mud, M.7
Oh, J.8
Papazoglou, I.A.9
Whiston, J.Y.10
-
4
-
-
38849171177
-
Quantified risk assessment for fall from height
-
Aneziris, O.N., Papazoglou, I.A., Baksteen, H., Mud, M., Ale, B.J., Bellamy, L.J., Hale, A.R., Bloemhoff, A., Post, J., Oh, J., Quantified risk assessment for fall from height. Saf. Sci. 46:2 (2008), 198–220.
-
(2008)
Saf. Sci.
, vol.46
, Issue.2
, pp. 198-220
-
-
Aneziris, O.N.1
Papazoglou, I.A.2
Baksteen, H.3
Mud, M.4
Ale, B.J.5
Bellamy, L.J.6
Hale, A.R.7
Bloemhoff, A.8
Post, J.9
Oh, J.10
-
5
-
-
84867063145
-
Quantification of occupational risk owing to contact with moving parts of machines
-
Aneziris, O.N., Papazoglou, I.A., Konstandinidou, M., Baksteen, H., Mud, M.L., Damen, M., Bellamy, L.J., Oh, J., Quantification of occupational risk owing to contact with moving parts of machines. Saf. Sci. 51 (2013), 382–396.
-
(2013)
Saf. Sci.
, vol.51
, pp. 382-396
-
-
Aneziris, O.N.1
Papazoglou, I.A.2
Konstandinidou, M.3
Baksteen, H.4
Mud, M.L.5
Damen, M.6
Bellamy, L.J.7
Oh, J.8
-
6
-
-
84903899866
-
Occupational risk quantification owing to falling objects
-
Aneziris, O.N., Papazoglou, I.A., Mud, M., Damen, M., Bellamy, L.J., Manuel, H.J., Oh, J., Occupational risk quantification owing to falling objects. Saf. Sci. 69 (2014), 57–70.
-
(2014)
Saf. Sci.
, vol.69
, pp. 57-70
-
-
Aneziris, O.N.1
Papazoglou, I.A.2
Mud, M.3
Damen, M.4
Bellamy, L.J.5
Manuel, H.J.6
Oh, J.7
-
7
-
-
44649109203
-
Towards risk assessment for crane activities
-
Aneziris, O.N., Papazoglou, I.A., Mud, M.L., Damen, M., Kuiper, J., Baksteen, H., Ale, B.J., Bellamy, L.J., Hale, A.R., Bloemhoff, A., Post, J.G., Oh, J., Towards risk assessment for crane activities. Saf. Sci. 46:6 (2008), 872–884.
-
(2008)
Saf. Sci.
, vol.46
, Issue.6
, pp. 872-884
-
-
Aneziris, O.N.1
Papazoglou, I.A.2
Mud, M.L.3
Damen, M.4
Kuiper, J.5
Baksteen, H.6
Ale, B.J.7
Bellamy, L.J.8
Hale, A.R.9
Bloemhoff, A.10
Post, J.G.11
Oh, J.12
-
8
-
-
84894318752
-
Integrating lean principles and fuzzy bow-tie analysis for risk assessment in chemical industry
-
Aqlan, F., Mustafa Ali, E., Integrating lean principles and fuzzy bow-tie analysis for risk assessment in chemical industry. J. Loss Prev. Process Ind. 29:May (2014), 39–48.
-
(2014)
J. Loss Prev. Process Ind.
, vol.29
, pp. 39-48
-
-
Aqlan, F.1
Mustafa Ali, E.2
-
9
-
-
79551518583
-
A new approach to construct optimal bow tie diagrams for risk analysis
-
Badreddine, A., Amor, N.B., A new approach to construct optimal bow tie diagrams for risk analysis. Trends Appl. Intell. Syst., 2010, 595–604.
-
(2010)
Trends Appl. Intell. Syst.
, pp. 595-604
-
-
Badreddine, A.1
Amor, N.B.2
-
10
-
-
84876408336
-
A Bayesian approach to construct bow tie diagrams for risk evaluation
-
Badreddine, A., Amor, N.B., A Bayesian approach to construct bow tie diagrams for risk evaluation. Process Saf. Environ. Prot. 91:3 (2013), 159–171.
-
(2013)
Process Saf. Environ. Prot.
, vol.91
, Issue.3
, pp. 159-171
-
-
Badreddine, A.1
Amor, N.B.2
-
11
-
-
84908136717
-
A new multi-objectives approach to implement preventive and protective barriers in bow tie diagram
-
Badreddine, A., Romdhane, T.B., HajKacem, M.A.B., Amor, N.B., A new multi-objectives approach to implement preventive and protective barriers in bow tie diagram. J. Loss Prev. Process Ind. 32 (2014), 238–253.
-
(2014)
J. Loss Prev. Process Ind.
, vol.32
, pp. 238-253
-
-
Badreddine, A.1
Romdhane, T.B.2
HajKacem, M.A.B.3
Amor, N.B.4
-
12
-
-
33846634644
-
Storybuilder – a tool for the analysis of accident reports
-
Bellamy, L.J., Ale, B.J.M., Geyer, T., Goossens, L.H., Hale, A.R., Oh, J., Mud, M.L., Bloemhof, A., Papazoglou, I.A., Whiston, J., Storybuilder – a tool for the analysis of accident reports. Reliab. Eng. Syst. Saf. 92:6 (2007), 735–744.
-
(2007)
Reliab. Eng. Syst. Saf.
, vol.92
, Issue.6
, pp. 735-744
-
-
Bellamy, L.J.1
Ale, B.J.M.2
Geyer, T.3
Goossens, L.H.4
Hale, A.R.5
Oh, J.6
Mud, M.L.7
Bloemhof, A.8
Papazoglou, I.A.9
Whiston, J.10
-
13
-
-
38749084908
-
The software tool Storybuilder and the analysis of the horrible stories of occupational accidents
-
Bellamy, L.J., Ale, B.J.M., Whiston, J.Y., Mud, M.L., Baksteen, H., Hale, A.R., Papazoglou, I.A., Bloemhoff, A., Damen, M., Oh, J.I.H., The software tool Storybuilder and the analysis of the horrible stories of occupational accidents. Saf. Sci. 46:2 (2008), 186–197.
-
(2008)
Saf. Sci.
, vol.46
, Issue.2
, pp. 186-197
-
-
Bellamy, L.J.1
Ale, B.J.M.2
Whiston, J.Y.3
Mud, M.L.4
Baksteen, H.5
Hale, A.R.6
Papazoglou, I.A.7
Bloemhoff, A.8
Damen, M.9
Oh, J.I.H.10
-
14
-
-
84901690768
-
Analysis of underlying causes of investigated loss of containment incidents in Dutch Seveso plants using the Storybuilder method
-
Bellamy, L.J., Mud, M., Manuel, H.J., Oh, J.I.H., Analysis of underlying causes of investigated loss of containment incidents in Dutch Seveso plants using the Storybuilder method. J. Loss Prev. Process Ind. 26:6 (2013), 1039–1059.
-
(2013)
J. Loss Prev. Process Ind.
, vol.26
, Issue.6
, pp. 1039-1059
-
-
Bellamy, L.J.1
Mud, M.2
Manuel, H.J.3
Oh, J.I.H.4
-
15
-
-
33644757602
-
Organizing learning processes on risks by using the bow-tie representation
-
Chevreau, F., Wybo, J., Cauchois, D., Organizing learning processes on risks by using the bow-tie representation. J. Hazard. Mater. 130:3 (2006), 276–283.
-
(2006)
J. Hazard. Mater.
, vol.130
, Issue.3
, pp. 276-283
-
-
Chevreau, F.1
Wybo, J.2
Cauchois, D.3
-
16
-
-
22944486017
-
Probability bow-ties: a transparent risk management tool
-
Cockshott, J., Probability bow-ties: a transparent risk management tool. Process Saf. Environ. Prot. 83:4 (2005), 307–316.
-
(2005)
Process Saf. Environ. Prot.
, vol.83
, Issue.4
, pp. 307-316
-
-
Cockshott, J.1
-
17
-
-
0004319718
-
The Public Inquiry into the Piper Alpha Disaster
-
Stationery Office London
-
Cullen, W.D., The Public Inquiry into the Piper Alpha Disaster. 1990, Stationery Office, London.
-
(1990)
-
-
Cullen, W.D.1
-
18
-
-
33644752671
-
Aramis project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance
-
de Dianous, V., Fiévez, C., Aramis project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance. J. Hazard. Mater. 130:3 (2006), 220–233.
-
(2006)
J. Hazard. Mater.
, vol.130
, Issue.3
, pp. 220-233
-
-
de Dianous, V.1
Fiévez, C.2
-
19
-
-
84865650385
-
A framework for human error analysis of offshore evacuations
-
Deacon, T., Amyotte, P.R., Khan, F.I., Mackinnon, S., A framework for human error analysis of offshore evacuations. Saf. Sci. 51:1 (2013), 319–327.
-
(2013)
Saf. Sci.
, vol.51
, Issue.1
, pp. 319-327
-
-
Deacon, T.1
Amyotte, P.R.2
Khan, F.I.3
Mackinnon, S.4
-
20
-
-
33644762807
-
Aramis project: a comprehensive methodology for the identification of reference accident scenarios in process industries
-
Delvosalle, C., Fiévez, C., Pipart, A., Debray, B., Aramis project: a comprehensive methodology for the identification of reference accident scenarios in process industries. J. Hazard. Mater. 130:3 (2006), 200–219.
-
(2006)
J. Hazard. Mater.
, vol.130
, Issue.3
, pp. 200-219
-
-
Delvosalle, C.1
Fiévez, C.2
Pipart, A.3
Debray, B.4
-
21
-
-
21644457284
-
Identification of reference accident scenarios in Seveso establishments
-
Delvosalle, C., Fievez, C., Pipart, A., Fabrega, J.C., Planas, E., Christou, M., Mushtaq, F., Identification of reference accident scenarios in Seveso establishments. Reliab. Eng. Syst. Saf. 90 (2005), 238–246.
-
(2005)
Reliab. Eng. Syst. Saf.
, vol.90
, pp. 238-246
-
-
Delvosalle, C.1
Fievez, C.2
Pipart, A.3
Fabrega, J.C.4
Planas, E.5
Christou, M.6
Mushtaq, F.7
-
22
-
-
54049101970
-
Safety-barrier diagrams as a safety management tool
-
Duijm, N.J., Safety-barrier diagrams as a safety management tool. Reliab. Eng. Syst. Saf. 94:2 (2009), 332–341.
-
(2009)
Reliab. Eng. Syst. Saf.
, vol.94
, Issue.2
, pp. 332-341
-
-
Duijm, N.J.1
-
25
-
-
83255194044
-
Handling and updating uncertain information in bow-tie analysis
-
Ferdous, R., Khan, F., Sadiq, R., Amyotte, P., Veitch, B., Handling and updating uncertain information in bow-tie analysis. J. Loss Prev. Process Ind. 25:1 (2012), 8–19.
-
(2012)
J. Loss Prev. Process Ind.
, vol.25
, Issue.1
, pp. 8-19
-
-
Ferdous, R.1
Khan, F.2
Sadiq, R.3
Amyotte, P.4
Veitch, B.5
-
26
-
-
84867097890
-
Analyzing system safety and risks under uncertainty using a bow-tie diagram: an innovative approach
-
Ferdous, R., Khan, F., Sadiq, R., Amyotte, P., Veitch, B., Analyzing system safety and risks under uncertainty using a bow-tie diagram: an innovative approach. Process Saf. Environ. Prot. 91:1–2 (2013), 1–18.
-
(2013)
Process Saf. Environ. Prot.
, vol.91
, Issue.1-2
, pp. 1-18
-
-
Ferdous, R.1
Khan, F.2
Sadiq, R.3
Amyotte, P.4
Veitch, B.5
-
27
-
-
77955247758
-
Application of QRA in Operational Safety Issues
-
Tech. Rep., HSE UK
-
Franks, A., Whitehead, R., Crossthwaite, P., Smail, L., 2002. Application of QRA in Operational Safety Issues. Tech. Rep., HSE UK.
-
(2002)
-
-
Franks, A.1
Whitehead, R.2
Crossthwaite, P.3
Smail, L.4
-
28
-
-
33644756488
-
The development of an audit technique to assess the quality of safety barrier management
-
Guldenmund, F.W., Hale, A.R., Goossens, L.H., Betten, J., Duijm, N.J., The development of an audit technique to assess the quality of safety barrier management. J. Hazard. Mater. 130:3 (2006), 234–241.
-
(2006)
J. Hazard. Mater.
, vol.130
, Issue.3
, pp. 234-241
-
-
Guldenmund, F.W.1
Hale, A.R.2
Goossens, L.H.3
Betten, J.4
Duijm, N.J.5
-
29
-
-
84939113577
-
Energy damage and the 10 countermeasure strategies
-
Haddon, W., Energy damage and the 10 countermeasure strategies. J. Trauma 13 (1973), 321–331.
-
(1973)
J. Trauma
, vol.13
, pp. 321-331
-
-
Haddon, W.1
-
31
-
-
84999622081
-
-
ISO, Iso 17776 – Petroleum and Natural Gas Industries – Offshore Production Installations – Guidelines on Tools and Techniques for Hazard Identification and Risk Assessment Reference Number
-
ISO, 2000. Iso 17776 – Petroleum and Natural Gas Industries – Offshore Production Installations – Guidelines on Tools and Techniques for Hazard Identification and Risk Assessment Reference Number.
-
(2000)
-
-
-
32
-
-
78649573321
-
Iso 31010 Risk Management – Risk Assessment Techniques
-
ISO, IEC, 2009. Iso 31010 Risk Management – Risk Assessment Techniques.
-
(2009)
-
-
ISO, I.E.C.1
-
33
-
-
77953617607
-
A semi-quantitative assessment of occupational risks using bow-tie representation
-
Jacinto, C., Silva, C., A semi-quantitative assessment of occupational risks using bow-tie representation. Saf. Sci. 48:8 (2010), 973–979.
-
(2010)
Saf. Sci.
, vol.48
, Issue.8
, pp. 973-979
-
-
Jacinto, C.1
Silva, C.2
-
34
-
-
0142258534
-
The Management Oversight and Risk Tree – Mort
-
Tech. Rep., U.S. Atomic Energy Commission
-
Johnson, W.G., 1973. The Management Oversight and Risk Tree – Mort. Tech. Rep., U.S. Atomic Energy Commission.
-
(1973)
-
-
Johnson, W.G.1
-
35
-
-
84860700471
-
Dynamic risk analysis using bow-tie approach
-
Khakzad, N., Khan, F., Amyotte, P., Dynamic risk analysis using bow-tie approach. Reliab. Eng. Syst. Saf. 104:August (2012), 36–44.
-
(2012)
Reliab. Eng. Syst. Saf.
, vol.104
, pp. 36-44
-
-
Khakzad, N.1
Khan, F.2
Amyotte, P.3
-
36
-
-
84871439873
-
Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network
-
Khakzad, N., Khan, F., Amyotte, P., Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network. Process Saf. Environ. Prot. 91:1–2 (2013), 46–53.
-
(2013)
Process Saf. Environ. Prot.
, vol.91
, Issue.1-2
, pp. 46-53
-
-
Khakzad, N.1
Khan, F.2
Amyotte, P.3
-
37
-
-
84874548097
-
Quantitative risk analysis of offshore drilling operations: a Bayesian approach
-
Khakzad, N., Khan, F., Amyotte, P., Quantitative risk analysis of offshore drilling operations: a Bayesian approach. Saf. Sci. 57 (2013), 108–117.
-
(2013)
Saf. Sci.
, vol.57
, pp. 108-117
-
-
Khakzad, N.1
Khan, F.2
Amyotte, P.3
-
38
-
-
84856228967
-
Analysis of a loss of containment incident dataset for major hazards intelligence using Storybuilder
-
Lisbona, D., Johnson, M., Millner, A., McGillivray, A., Maddison, T., Wardman, M., Analysis of a loss of containment incident dataset for major hazards intelligence using Storybuilder. J. Loss Prev. Process Ind. 25:2 (2012), 344–363.
-
(2012)
J. Loss Prev. Process Ind.
, vol.25
, Issue.2
, pp. 344-363
-
-
Lisbona, D.1
Johnson, M.2
Millner, A.3
McGillivray, A.4
Maddison, T.5
Wardman, M.6
-
39
-
-
80955179045
-
Bow-tie model in layer of protection analysis
-
Markowski, A.S., Kotynia, A., Bow-tie model in layer of protection analysis. Process Saf. Environ. Prot. 89:4 (2011), 205–213.
-
(2011)
Process Saf. Environ. Prot.
, vol.89
, Issue.4
, pp. 205-213
-
-
Markowski, A.S.1
Kotynia, A.2
-
40
-
-
71649110679
-
Fuzzy logic for process safety analysis
-
Markowski, A.S., Mannan, M.S., Bigoszewska, A., Fuzzy logic for process safety analysis. J. Loss Prev. Process Ind. 22:6 (2009), 695–702.
-
(2009)
J. Loss Prev. Process Ind.
, vol.22
, Issue.6
, pp. 695-702
-
-
Markowski, A.S.1
Mannan, M.S.2
Bigoszewska, A.3
-
41
-
-
79960184926
-
Application of a generic bow-tie based risk analysis framework on risk management of sea ports and offshore terminals
-
Mokhtari, K., Ren, J., Roberts, C., Wang, J., Application of a generic bow-tie based risk analysis framework on risk management of sea ports and offshore terminals. J. Hazard. Mater. 192:2 (2011), 465–475.
-
(2011)
J. Hazard. Mater.
, vol.192
, Issue.2
, pp. 465-475
-
-
Mokhtari, K.1
Ren, J.2
Roberts, C.3
Wang, J.4
-
42
-
-
0003850384
-
The Cause/Consequence Diagram Method as a Basis for Quantitative Accident Analysis
-
Tech. Rep., Danish Atomic Energy Commission, Roskilde, Denmark
-
Nielsen, D.S., 1971. The Cause/Consequence Diagram Method as a Basis for Quantitative Accident Analysis. Tech. Rep., Danish Atomic Energy Commission, Roskilde, Denmark.
-
(1971)
-
-
Nielsen, D.S.1
-
43
-
-
84929148011
-
Dynamic approach to risk management: application to the Hoeganaes metal dust accidents
-
Paltrinieri, N., Khan, F., Amyotte, P., Cozzani, V., Dynamic approach to risk management: application to the Hoeganaes metal dust accidents. Process Saf. Environ. Prot. 92:6 (2014), 669–679.
-
(2014)
Process Saf. Environ. Prot.
, vol.92
, Issue.6
, pp. 669-679
-
-
Paltrinieri, N.1
Khan, F.2
Amyotte, P.3
Cozzani, V.4
-
44
-
-
33846337832
-
A logical model for quantification of occupational risk
-
Papazoglou, I.a., Ale, B.J.M., A logical model for quantification of occupational risk. Reliab. Eng. Syst. Saf. 92:6 (2007), 785–803.
-
(2007)
Reliab. Eng. Syst. Saf.
, vol.92
, Issue.6
, pp. 785-803
-
-
Papazoglou, I.A.1
Ale, B.J.M.2
-
45
-
-
84903791533
-
How can we use the information provided by process safety performance indicators? Possibilities and limitations
-
Pasman, H., Rogers, W., How can we use the information provided by process safety performance indicators? Possibilities and limitations. J. Loss Prev. Process Ind. 30:1 (2014), 197–206.
-
(2014)
J. Loss Prev. Process Ind.
, vol.30
, Issue.1
, pp. 197-206
-
-
Pasman, H.1
Rogers, W.2
-
46
-
-
84907351640
-
Risk-based process plant design considering inherent safety
-
Rathnayaka, S., Khan, F., Amyotte, P., Risk-based process plant design considering inherent safety. Saf. Sci. 70 (2014), 438–464.
-
(2014)
Saf. Sci.
, vol.70
, pp. 438-464
-
-
Rathnayaka, S.1
Khan, F.2
Amyotte, P.3
-
47
-
-
0004223940
-
Human Error
-
Cambridge University Press
-
Reason, J.T., Human Error. 1990, Cambridge University Press.
-
(1990)
-
-
Reason, J.T.1
-
48
-
-
33644784661
-
A global view on ARAMIS, a risk assessment methodology for industries in the framework of the Seveso II directive
-
Salvi, O., Debray, B., A global view on ARAMIS, a risk assessment methodology for industries in the framework of the Seveso II directive. J. Hazard. Mater. 130:3 (2006), 187–199.
-
(2006)
J. Hazard. Mater.
, vol.130
, Issue.3
, pp. 187-199
-
-
Salvi, O.1
Debray, B.2
-
49
-
-
84858284798
-
Risk analysis for oil & gas pipelines: a sustainability assessment approach using fuzzy based bow-tie analysis
-
Shahriar, A., Sadiq, R., Tesfamariam, S., Risk analysis for oil & gas pipelines: a sustainability assessment approach using fuzzy based bow-tie analysis. J. Loss Prev. Process Ind. 25:3 (2012), 505–523.
-
(2012)
J. Loss Prev. Process Ind.
, vol.25
, Issue.3
, pp. 505-523
-
-
Shahriar, A.1
Sadiq, R.2
Tesfamariam, S.3
-
50
-
-
33745871581
-
Safety barriers: definition, classification, and performance
-
Sklet, S., Safety barriers: definition, classification, and performance. J. Loss Prev. Process Ind. 19:5 (2006), 494–506.
-
(2006)
J. Loss Prev. Process Ind.
, vol.19
, Issue.5
, pp. 494-506
-
-
Sklet, S.1
-
51
-
-
65949088148
-
Fire and explosion assessment on oil and gas floating production storage offloading (FPSO): An effective screening and comparison tool
-
Suardin, J.A., Jeff McPhate, A., Sipkema, A., Childs, M., Mannan, M.S., Fire and explosion assessment on oil and gas floating production storage offloading (FPSO): An effective screening and comparison tool. Process Saf. Environ. Prot. 87:3 (2009), 147–160.
-
(2009)
Process Saf. Environ. Prot.
, vol.87
, Issue.3
, pp. 147-160
-
-
Suardin, J.A.1
Jeff McPhate, A.2
Sipkema, A.3
Childs, M.4
Mannan, M.S.5
-
52
-
-
70449527454
-
Incorporating human factors into a simplified bow-tie approach for workplace risk assessment
-
Targoutzidis, A., Incorporating human factors into a simplified bow-tie approach for workplace risk assessment. Saf. Sci. 48:2 (2010), 145–156.
-
(2010)
Saf. Sci.
, vol.48
, Issue.2
, pp. 145-156
-
-
Targoutzidis, A.1
-
53
-
-
79956153272
-
Optimising Hazard Management by Workforce Engagement and Supervision
-
Tech. Rep., HSE UK
-
Trbojevic, V.M., 2008. Optimising Hazard Management by Workforce Engagement and Supervision. Tech. Rep., HSE UK.
-
(2008)
-
-
Trbojevic, V.M.1
-
54
-
-
0033627150
-
Risk based methodology for safety improvements in ports
-
Trbojevic, V.M., Carr, B.J., Risk based methodology for safety improvements in ports. J. Hazard. Mater. 71:1–3 (2000), 467–480.
-
(2000)
J. Hazard. Mater.
, vol.71
, Issue.1-3
, pp. 467-480
-
-
Trbojevic, V.M.1
Carr, B.J.2
-
56
-
-
84876992177
-
Reference criteria for the identification of accident scenarios in the framework of land use planning
-
Tugnoli, A., Gyenes, Z., Wijk, L.V., Christou, M., Spadoni, G., Cozzani, V., Reference criteria for the identification of accident scenarios in the framework of land use planning. J. Loss Prev. Process Ind. 26:4 (2013), 614–627.
-
(2013)
J. Loss Prev. Process Ind.
, vol.26
, Issue.4
, pp. 614-627
-
-
Tugnoli, A.1
Gyenes, Z.2
Wijk, L.V.3
Christou, M.4
Spadoni, G.5
Cozzani, V.6
-
57
-
-
71649098132
-
Rail ruminations for process safety improvement
-
Van Scyoc, K., Hughes, G., Rail ruminations for process safety improvement. J. Loss Prev. Process Ind. 22:6 (2009), 689–694.
-
(2009)
J. Loss Prev. Process Ind.
, vol.22
, Issue.6
, pp. 689-694
-
-
Van Scyoc, K.1
Hughes, G.2
-
58
-
-
33846585071
-
Developments in HSE management in oil and gas exploration and production
-
A. Hale M. Baram Pergamon Oxford, UK (Chapter 3)
-
Visser, J., Developments in HSE management in oil and gas exploration and production. Hale, A., Baram, M., (eds.) Safety Management: The Challenge of Change, 1998, Pergamon, Oxford, UK, 43–65 (Chapter 3).
-
(1998)
Safety Management: The Challenge of Change
, pp. 43-65
-
-
Visser, J.1
-
59
-
-
82755160934
-
Addressing emerging risks using carbon capture and storage as an example
-
Wilday, J., Paltrinieri, N., Farret, R., Hebrard, J., Breedveld, L., Addressing emerging risks using carbon capture and storage as an example. Process Saf. Environ. Prot. 89:6 (2011), 463–471.
-
(2011)
Process Saf. Environ. Prot.
, vol.89
, Issue.6
, pp. 463-471
-
-
Wilday, J.1
Paltrinieri, N.2
Farret, R.3
Hebrard, J.4
Breedveld, L.5
|