Volumn 88, Issue , 2015, Pages 211-218

The bowtie method: A review

Author keywords

Bowtie; Qualitative risk assessment; Quantitative risk assessment; Risk analysis

Indexed keywords

RISK ANALYSIS; RISK PERCEPTION;

EID: 84961218774     PISSN: 09257535     EISSN: 18791042     Source Type: Journal    
DOI: 10.1016/j.ssci.2016.03.001     Document Type: Article
Times cited : (157)

References (60)
  • 1
    • 84901322311 scopus 로고    scopus 로고
    • Dynamic safety risk analysis of offshore drilling
    • Abimbola, M., Khan, F., Khakzad, N., Dynamic safety risk analysis of offshore drilling. J. Loss Prev. Process Ind. 30:July (2014), 74–85.
    • (2014) J. Loss Prev. Process Ind. , vol.30 , pp. 74-85
    • Abimbola, M.1    Khan, F.2    Khakzad, N.3
  • 8
    • 84894318752 scopus 로고    scopus 로고
    • Integrating lean principles and fuzzy bow-tie analysis for risk assessment in chemical industry
    • Aqlan, F., Mustafa Ali, E., Integrating lean principles and fuzzy bow-tie analysis for risk assessment in chemical industry. J. Loss Prev. Process Ind. 29:May (2014), 39–48.
    • (2014) J. Loss Prev. Process Ind. , vol.29 , pp. 39-48
    • Aqlan, F.1    Mustafa Ali, E.2
  • 9
    • 79551518583 scopus 로고    scopus 로고
    • A new approach to construct optimal bow tie diagrams for risk analysis
    • Badreddine, A., Amor, N.B., A new approach to construct optimal bow tie diagrams for risk analysis. Trends Appl. Intell. Syst., 2010, 595–604.
    • (2010) Trends Appl. Intell. Syst. , pp. 595-604
    • Badreddine, A.1    Amor, N.B.2
  • 10
    • 84876408336 scopus 로고    scopus 로고
    • A Bayesian approach to construct bow tie diagrams for risk evaluation
    • Badreddine, A., Amor, N.B., A Bayesian approach to construct bow tie diagrams for risk evaluation. Process Saf. Environ. Prot. 91:3 (2013), 159–171.
    • (2013) Process Saf. Environ. Prot. , vol.91 , Issue.3 , pp. 159-171
    • Badreddine, A.1    Amor, N.B.2
  • 11
    • 84908136717 scopus 로고    scopus 로고
    • A new multi-objectives approach to implement preventive and protective barriers in bow tie diagram
    • Badreddine, A., Romdhane, T.B., HajKacem, M.A.B., Amor, N.B., A new multi-objectives approach to implement preventive and protective barriers in bow tie diagram. J. Loss Prev. Process Ind. 32 (2014), 238–253.
    • (2014) J. Loss Prev. Process Ind. , vol.32 , pp. 238-253
    • Badreddine, A.1    Romdhane, T.B.2    HajKacem, M.A.B.3    Amor, N.B.4
  • 14
    • 84901690768 scopus 로고    scopus 로고
    • Analysis of underlying causes of investigated loss of containment incidents in Dutch Seveso plants using the Storybuilder method
    • Bellamy, L.J., Mud, M., Manuel, H.J., Oh, J.I.H., Analysis of underlying causes of investigated loss of containment incidents in Dutch Seveso plants using the Storybuilder method. J. Loss Prev. Process Ind. 26:6 (2013), 1039–1059.
    • (2013) J. Loss Prev. Process Ind. , vol.26 , Issue.6 , pp. 1039-1059
    • Bellamy, L.J.1    Mud, M.2    Manuel, H.J.3    Oh, J.I.H.4
  • 15
    • 33644757602 scopus 로고    scopus 로고
    • Organizing learning processes on risks by using the bow-tie representation
    • Chevreau, F., Wybo, J., Cauchois, D., Organizing learning processes on risks by using the bow-tie representation. J. Hazard. Mater. 130:3 (2006), 276–283.
    • (2006) J. Hazard. Mater. , vol.130 , Issue.3 , pp. 276-283
    • Chevreau, F.1    Wybo, J.2    Cauchois, D.3
  • 16
    • 22944486017 scopus 로고    scopus 로고
    • Probability bow-ties: a transparent risk management tool
    • Cockshott, J., Probability bow-ties: a transparent risk management tool. Process Saf. Environ. Prot. 83:4 (2005), 307–316.
    • (2005) Process Saf. Environ. Prot. , vol.83 , Issue.4 , pp. 307-316
    • Cockshott, J.1
  • 17
    • 0004319718 scopus 로고
    • The Public Inquiry into the Piper Alpha Disaster
    • Stationery Office London
    • Cullen, W.D., The Public Inquiry into the Piper Alpha Disaster. 1990, Stationery Office, London.
    • (1990)
    • Cullen, W.D.1
  • 18
    • 33644752671 scopus 로고    scopus 로고
    • Aramis project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance
    • de Dianous, V., Fiévez, C., Aramis project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance. J. Hazard. Mater. 130:3 (2006), 220–233.
    • (2006) J. Hazard. Mater. , vol.130 , Issue.3 , pp. 220-233
    • de Dianous, V.1    Fiévez, C.2
  • 19
    • 84865650385 scopus 로고    scopus 로고
    • A framework for human error analysis of offshore evacuations
    • Deacon, T., Amyotte, P.R., Khan, F.I., Mackinnon, S., A framework for human error analysis of offshore evacuations. Saf. Sci. 51:1 (2013), 319–327.
    • (2013) Saf. Sci. , vol.51 , Issue.1 , pp. 319-327
    • Deacon, T.1    Amyotte, P.R.2    Khan, F.I.3    Mackinnon, S.4
  • 20
    • 33644762807 scopus 로고    scopus 로고
    • Aramis project: a comprehensive methodology for the identification of reference accident scenarios in process industries
    • Delvosalle, C., Fiévez, C., Pipart, A., Debray, B., Aramis project: a comprehensive methodology for the identification of reference accident scenarios in process industries. J. Hazard. Mater. 130:3 (2006), 200–219.
    • (2006) J. Hazard. Mater. , vol.130 , Issue.3 , pp. 200-219
    • Delvosalle, C.1    Fiévez, C.2    Pipart, A.3    Debray, B.4
  • 22
    • 54049101970 scopus 로고    scopus 로고
    • Safety-barrier diagrams as a safety management tool
    • Duijm, N.J., Safety-barrier diagrams as a safety management tool. Reliab. Eng. Syst. Saf. 94:2 (2009), 332–341.
    • (2009) Reliab. Eng. Syst. Saf. , vol.94 , Issue.2 , pp. 332-341
    • Duijm, N.J.1
  • 26
    • 84867097890 scopus 로고    scopus 로고
    • Analyzing system safety and risks under uncertainty using a bow-tie diagram: an innovative approach
    • Ferdous, R., Khan, F., Sadiq, R., Amyotte, P., Veitch, B., Analyzing system safety and risks under uncertainty using a bow-tie diagram: an innovative approach. Process Saf. Environ. Prot. 91:1–2 (2013), 1–18.
    • (2013) Process Saf. Environ. Prot. , vol.91 , Issue.1-2 , pp. 1-18
    • Ferdous, R.1    Khan, F.2    Sadiq, R.3    Amyotte, P.4    Veitch, B.5
  • 27
    • 77955247758 scopus 로고    scopus 로고
    • Application of QRA in Operational Safety Issues
    • Tech. Rep., HSE UK
    • Franks, A., Whitehead, R., Crossthwaite, P., Smail, L., 2002. Application of QRA in Operational Safety Issues. Tech. Rep., HSE UK.
    • (2002)
    • Franks, A.1    Whitehead, R.2    Crossthwaite, P.3    Smail, L.4
  • 28
    • 33644756488 scopus 로고    scopus 로고
    • The development of an audit technique to assess the quality of safety barrier management
    • Guldenmund, F.W., Hale, A.R., Goossens, L.H., Betten, J., Duijm, N.J., The development of an audit technique to assess the quality of safety barrier management. J. Hazard. Mater. 130:3 (2006), 234–241.
    • (2006) J. Hazard. Mater. , vol.130 , Issue.3 , pp. 234-241
    • Guldenmund, F.W.1    Hale, A.R.2    Goossens, L.H.3    Betten, J.4    Duijm, N.J.5
  • 29
    • 84939113577 scopus 로고
    • Energy damage and the 10 countermeasure strategies
    • Haddon, W., Energy damage and the 10 countermeasure strategies. J. Trauma 13 (1973), 321–331.
    • (1973) J. Trauma , vol.13 , pp. 321-331
    • Haddon, W.1
  • 31
    • 84999622081 scopus 로고    scopus 로고
    • ISO, Iso 17776 – Petroleum and Natural Gas Industries – Offshore Production Installations – Guidelines on Tools and Techniques for Hazard Identification and Risk Assessment Reference Number
    • ISO, 2000. Iso 17776 – Petroleum and Natural Gas Industries – Offshore Production Installations – Guidelines on Tools and Techniques for Hazard Identification and Risk Assessment Reference Number.
    • (2000)
  • 32
    • 78649573321 scopus 로고    scopus 로고
    • Iso 31010 Risk Management – Risk Assessment Techniques
    • ISO, IEC, 2009. Iso 31010 Risk Management – Risk Assessment Techniques.
    • (2009)
    • ISO, I.E.C.1
  • 33
    • 77953617607 scopus 로고    scopus 로고
    • A semi-quantitative assessment of occupational risks using bow-tie representation
    • Jacinto, C., Silva, C., A semi-quantitative assessment of occupational risks using bow-tie representation. Saf. Sci. 48:8 (2010), 973–979.
    • (2010) Saf. Sci. , vol.48 , Issue.8 , pp. 973-979
    • Jacinto, C.1    Silva, C.2
  • 34
    • 0142258534 scopus 로고
    • The Management Oversight and Risk Tree – Mort
    • Tech. Rep., U.S. Atomic Energy Commission
    • Johnson, W.G., 1973. The Management Oversight and Risk Tree – Mort. Tech. Rep., U.S. Atomic Energy Commission.
    • (1973)
    • Johnson, W.G.1
  • 35
    • 84860700471 scopus 로고    scopus 로고
    • Dynamic risk analysis using bow-tie approach
    • Khakzad, N., Khan, F., Amyotte, P., Dynamic risk analysis using bow-tie approach. Reliab. Eng. Syst. Saf. 104:August (2012), 36–44.
    • (2012) Reliab. Eng. Syst. Saf. , vol.104 , pp. 36-44
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 36
    • 84871439873 scopus 로고    scopus 로고
    • Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network
    • Khakzad, N., Khan, F., Amyotte, P., Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network. Process Saf. Environ. Prot. 91:1–2 (2013), 46–53.
    • (2013) Process Saf. Environ. Prot. , vol.91 , Issue.1-2 , pp. 46-53
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 37
    • 84874548097 scopus 로고    scopus 로고
    • Quantitative risk analysis of offshore drilling operations: a Bayesian approach
    • Khakzad, N., Khan, F., Amyotte, P., Quantitative risk analysis of offshore drilling operations: a Bayesian approach. Saf. Sci. 57 (2013), 108–117.
    • (2013) Saf. Sci. , vol.57 , pp. 108-117
    • Khakzad, N.1    Khan, F.2    Amyotte, P.3
  • 38
    • 84856228967 scopus 로고    scopus 로고
    • Analysis of a loss of containment incident dataset for major hazards intelligence using Storybuilder
    • Lisbona, D., Johnson, M., Millner, A., McGillivray, A., Maddison, T., Wardman, M., Analysis of a loss of containment incident dataset for major hazards intelligence using Storybuilder. J. Loss Prev. Process Ind. 25:2 (2012), 344–363.
    • (2012) J. Loss Prev. Process Ind. , vol.25 , Issue.2 , pp. 344-363
    • Lisbona, D.1    Johnson, M.2    Millner, A.3    McGillivray, A.4    Maddison, T.5    Wardman, M.6
  • 39
    • 80955179045 scopus 로고    scopus 로고
    • Bow-tie model in layer of protection analysis
    • Markowski, A.S., Kotynia, A., Bow-tie model in layer of protection analysis. Process Saf. Environ. Prot. 89:4 (2011), 205–213.
    • (2011) Process Saf. Environ. Prot. , vol.89 , Issue.4 , pp. 205-213
    • Markowski, A.S.1    Kotynia, A.2
  • 41
    • 79960184926 scopus 로고    scopus 로고
    • Application of a generic bow-tie based risk analysis framework on risk management of sea ports and offshore terminals
    • Mokhtari, K., Ren, J., Roberts, C., Wang, J., Application of a generic bow-tie based risk analysis framework on risk management of sea ports and offshore terminals. J. Hazard. Mater. 192:2 (2011), 465–475.
    • (2011) J. Hazard. Mater. , vol.192 , Issue.2 , pp. 465-475
    • Mokhtari, K.1    Ren, J.2    Roberts, C.3    Wang, J.4
  • 42
    • 0003850384 scopus 로고
    • The Cause/Consequence Diagram Method as a Basis for Quantitative Accident Analysis
    • Tech. Rep., Danish Atomic Energy Commission, Roskilde, Denmark
    • Nielsen, D.S., 1971. The Cause/Consequence Diagram Method as a Basis for Quantitative Accident Analysis. Tech. Rep., Danish Atomic Energy Commission, Roskilde, Denmark.
    • (1971)
    • Nielsen, D.S.1
  • 43
    • 84929148011 scopus 로고    scopus 로고
    • Dynamic approach to risk management: application to the Hoeganaes metal dust accidents
    • Paltrinieri, N., Khan, F., Amyotte, P., Cozzani, V., Dynamic approach to risk management: application to the Hoeganaes metal dust accidents. Process Saf. Environ. Prot. 92:6 (2014), 669–679.
    • (2014) Process Saf. Environ. Prot. , vol.92 , Issue.6 , pp. 669-679
    • Paltrinieri, N.1    Khan, F.2    Amyotte, P.3    Cozzani, V.4
  • 44
    • 33846337832 scopus 로고    scopus 로고
    • A logical model for quantification of occupational risk
    • Papazoglou, I.a., Ale, B.J.M., A logical model for quantification of occupational risk. Reliab. Eng. Syst. Saf. 92:6 (2007), 785–803.
    • (2007) Reliab. Eng. Syst. Saf. , vol.92 , Issue.6 , pp. 785-803
    • Papazoglou, I.A.1    Ale, B.J.M.2
  • 45
    • 84903791533 scopus 로고    scopus 로고
    • How can we use the information provided by process safety performance indicators? Possibilities and limitations
    • Pasman, H., Rogers, W., How can we use the information provided by process safety performance indicators? Possibilities and limitations. J. Loss Prev. Process Ind. 30:1 (2014), 197–206.
    • (2014) J. Loss Prev. Process Ind. , vol.30 , Issue.1 , pp. 197-206
    • Pasman, H.1    Rogers, W.2
  • 46
    • 84907351640 scopus 로고    scopus 로고
    • Risk-based process plant design considering inherent safety
    • Rathnayaka, S., Khan, F., Amyotte, P., Risk-based process plant design considering inherent safety. Saf. Sci. 70 (2014), 438–464.
    • (2014) Saf. Sci. , vol.70 , pp. 438-464
    • Rathnayaka, S.1    Khan, F.2    Amyotte, P.3
  • 47
    • 0004223940 scopus 로고
    • Human Error
    • Cambridge University Press
    • Reason, J.T., Human Error. 1990, Cambridge University Press.
    • (1990)
    • Reason, J.T.1
  • 48
    • 33644784661 scopus 로고    scopus 로고
    • A global view on ARAMIS, a risk assessment methodology for industries in the framework of the Seveso II directive
    • Salvi, O., Debray, B., A global view on ARAMIS, a risk assessment methodology for industries in the framework of the Seveso II directive. J. Hazard. Mater. 130:3 (2006), 187–199.
    • (2006) J. Hazard. Mater. , vol.130 , Issue.3 , pp. 187-199
    • Salvi, O.1    Debray, B.2
  • 49
    • 84858284798 scopus 로고    scopus 로고
    • Risk analysis for oil & gas pipelines: a sustainability assessment approach using fuzzy based bow-tie analysis
    • Shahriar, A., Sadiq, R., Tesfamariam, S., Risk analysis for oil & gas pipelines: a sustainability assessment approach using fuzzy based bow-tie analysis. J. Loss Prev. Process Ind. 25:3 (2012), 505–523.
    • (2012) J. Loss Prev. Process Ind. , vol.25 , Issue.3 , pp. 505-523
    • Shahriar, A.1    Sadiq, R.2    Tesfamariam, S.3
  • 50
    • 33745871581 scopus 로고    scopus 로고
    • Safety barriers: definition, classification, and performance
    • Sklet, S., Safety barriers: definition, classification, and performance. J. Loss Prev. Process Ind. 19:5 (2006), 494–506.
    • (2006) J. Loss Prev. Process Ind. , vol.19 , Issue.5 , pp. 494-506
    • Sklet, S.1
  • 51
    • 65949088148 scopus 로고    scopus 로고
    • Fire and explosion assessment on oil and gas floating production storage offloading (FPSO): An effective screening and comparison tool
    • Suardin, J.A., Jeff McPhate, A., Sipkema, A., Childs, M., Mannan, M.S., Fire and explosion assessment on oil and gas floating production storage offloading (FPSO): An effective screening and comparison tool. Process Saf. Environ. Prot. 87:3 (2009), 147–160.
    • (2009) Process Saf. Environ. Prot. , vol.87 , Issue.3 , pp. 147-160
    • Suardin, J.A.1    Jeff McPhate, A.2    Sipkema, A.3    Childs, M.4    Mannan, M.S.5
  • 52
    • 70449527454 scopus 로고    scopus 로고
    • Incorporating human factors into a simplified bow-tie approach for workplace risk assessment
    • Targoutzidis, A., Incorporating human factors into a simplified bow-tie approach for workplace risk assessment. Saf. Sci. 48:2 (2010), 145–156.
    • (2010) Saf. Sci. , vol.48 , Issue.2 , pp. 145-156
    • Targoutzidis, A.1
  • 53
    • 79956153272 scopus 로고    scopus 로고
    • Optimising Hazard Management by Workforce Engagement and Supervision
    • Tech. Rep., HSE UK
    • Trbojevic, V.M., 2008. Optimising Hazard Management by Workforce Engagement and Supervision. Tech. Rep., HSE UK.
    • (2008)
    • Trbojevic, V.M.1
  • 54
    • 0033627150 scopus 로고    scopus 로고
    • Risk based methodology for safety improvements in ports
    • Trbojevic, V.M., Carr, B.J., Risk based methodology for safety improvements in ports. J. Hazard. Mater. 71:1–3 (2000), 467–480.
    • (2000) J. Hazard. Mater. , vol.71 , Issue.1-3 , pp. 467-480
    • Trbojevic, V.M.1    Carr, B.J.2
  • 56
    • 84876992177 scopus 로고    scopus 로고
    • Reference criteria for the identification of accident scenarios in the framework of land use planning
    • Tugnoli, A., Gyenes, Z., Wijk, L.V., Christou, M., Spadoni, G., Cozzani, V., Reference criteria for the identification of accident scenarios in the framework of land use planning. J. Loss Prev. Process Ind. 26:4 (2013), 614–627.
    • (2013) J. Loss Prev. Process Ind. , vol.26 , Issue.4 , pp. 614-627
    • Tugnoli, A.1    Gyenes, Z.2    Wijk, L.V.3    Christou, M.4    Spadoni, G.5    Cozzani, V.6
  • 57
    • 71649098132 scopus 로고    scopus 로고
    • Rail ruminations for process safety improvement
    • Van Scyoc, K., Hughes, G., Rail ruminations for process safety improvement. J. Loss Prev. Process Ind. 22:6 (2009), 689–694.
    • (2009) J. Loss Prev. Process Ind. , vol.22 , Issue.6 , pp. 689-694
    • Van Scyoc, K.1    Hughes, G.2
  • 58
    • 33846585071 scopus 로고    scopus 로고
    • Developments in HSE management in oil and gas exploration and production
    • A. Hale M. Baram Pergamon Oxford, UK (Chapter 3)
    • Visser, J., Developments in HSE management in oil and gas exploration and production. Hale, A., Baram, M., (eds.) Safety Management: The Challenge of Change, 1998, Pergamon, Oxford, UK, 43–65 (Chapter 3).
    • (1998) Safety Management: The Challenge of Change , pp. 43-65
    • Visser, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.