-
1
-
-
84946012494
-
A Two-phase Iterative Heuristic Approach for the Production Routing Problem
-
N.Absi, C.Archetti, S.Dauzère-Pérès, and D.Feillet. 2014. “A Two-phase Iterative Heuristic Approach for the Production Routing Problem.” Transportation Science 49 (4):784–795.
-
(2014)
Transportation Science
, vol.49
, Issue.4
, pp. 784-795
-
-
Absi, N.1
Archetti, C.2
Dauzère-Pérès, S.3
Feillet, D.4
-
2
-
-
79951839865
-
Uncapacitated Lot-sizing Problem with Production Time Windows, Early Productions, Backlogs and Lost Sales
-
N.Absi, S.Kedad-Sidhoum, and S.Dauzère-Pérès. 2011. “Uncapacitated Lot-sizing Problem with Production Time Windows, Early Productions, Backlogs and Lost Sales.” International Journal of Production Research 49 (9):2551–2566.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.9
, pp. 2551-2566
-
-
Absi, N.1
Kedad-Sidhoum, S.2
Dauzère-Pérès, S.3
-
3
-
-
84894570180
-
Optimization-based Adaptive Large Neighborhood Search for the Production Routing Problem
-
Y.Adulyasak, J.-F.Cordeau, and R.Jans. 2014a. “Optimization-based Adaptive Large Neighborhood Search for the Production Routing Problem.” Transportation Science 48 (1):20–45.
-
(2014)
Transportation Science
, vol.48
, Issue.1
, pp. 20-45
-
-
Adulyasak, Y.1
Cordeau, J.-F.2
Jans, R.3
-
4
-
-
84893873667
-
Formulations and Branch-and-cut Algorithms for Multi-vehicle Production and Inventory Routing Problems
-
Y.Adulyasak, J.-F.Cordeau, and R.Jans. 2014b. “Formulations and Branch-and-cut Algorithms for Multi-vehicle Production and Inventory Routing Problems.” INFORMS Journal on Computing 26 (1):103–120.
-
(2014)
INFORMS Journal on Computing
, vol.26
, Issue.1
, pp. 103-120
-
-
Adulyasak, Y.1
Cordeau, J.-F.2
Jans, R.3
-
5
-
-
84919340915
-
The Production Routing Problem: A Review of Formulations and Solution Algorithms
-
Y.Adulyasak, J.-F.Cordeau, and R.Jans. 2015. “The Production Routing Problem:A Review of Formulations and Solution Algorithms.” Computers & Operations Research 55:141–152.
-
(2015)
Computers & Operations Research
, vol.55
, pp. 141-152
-
-
Adulyasak, Y.1
Cordeau, J.-F.2
Jans, R.3
-
6
-
-
79951821726
-
Comparison of Just-in-time and Time Window Delivery Policies for a Single-item Capacitated Lot Sizing Problem
-
A.Akbalik, and B.Penz. 2011. “Comparison of Just-in-time and Time Window Delivery Policies for a Single-item Capacitated Lot Sizing Problem.” International Journal of Production Research 49 (9):2567–2585.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.9
, pp. 2567-2585
-
-
Akbalik, A.1
Penz, B.2
-
7
-
-
74549143166
-
Neighbourhood Search Meta-heuristics for Capacitated Lot-sizing with Sequence-dependent Setups
-
B.Almada-Lobo, and R.J.W.James. 2010. “Neighbourhood Search Meta-heuristics for Capacitated Lot-sizing with Sequence-dependent Setups.” International Journal of Production Research 48 (3):861–878.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.3
, pp. 861-878
-
-
Almada-Lobo, B.1
James, R.J.W.2
-
8
-
-
69249213631
-
A Hybrid Optimization Approach for Multi-level Capacitated Lot-sizing Problems
-
C.Almeder, 2010. “A Hybrid Optimization Approach for Multi-level Capacitated Lot-sizing Problems.” European Journal of Operational Research 200 (2):599–606.
-
(2010)
European Journal of Operational Research
, vol.200
, Issue.2
, pp. 599-606
-
-
Almeder, C.1
-
9
-
-
79955067887
-
Analysis of the Maximum Level Policy in a Production--distribution System
-
C.Archetti, L.Bertazzi, G.Paletta, and M.G.Speranza. 2011. “Analysis of the Maximum Level Policy in a Production--distribution System.” Computers & Operations Research 12 (38):1731–1746.
-
(2011)
Computers & Operations Research
, vol.12
, Issue.38
, pp. 1731-1746
-
-
Archetti, C.1
Bertazzi, L.2
Paletta, G.3
Speranza, M.G.4
-
10
-
-
0023343841
-
OR Practice -- Determining Lot Sizes and Resource Requirements: A Review
-
H.C.Bahl, L.P.Ritzman, and J.N.D.Gupta. 1987. “OR Practice -- Determining Lot Sizes and Resource Requirements:A Review.” Operations Research 35 (3):329–345.
-
(1987)
Operations Research
, vol.35
, Issue.3
, pp. 329-345
-
-
Bahl, H.C.1
Ritzman, L.P.2
Gupta, J.N.D.3
-
11
-
-
77955271201
-
A Branch-and-price Algorithm for an Integrated Production and Inventory Routing Problem
-
J.F.Bard, and N.Nananukul. 2010. “A Branch-and-price Algorithm for an Integrated Production and Inventory Routing Problem.” Computers & Operations Research 37 (12):2202–2217.
-
(2010)
Computers & Operations Research
, vol.37
, Issue.12
, pp. 2202-2217
-
-
Bard, J.F.1
Nananukul, N.2
-
12
-
-
34047126268
-
A Reactive GRASP and Path Relinking for a Combined Production--Distribution Problem
-
M.Boudia, M.A.O.Louly, and C.Prins. 2007. “A Reactive GRASP and Path Relinking for a Combined Production--Distribution Problem.” Computers & Operations Research 34 (11):3402–3419.
-
(2007)
Computers & Operations Research
, vol.34
, Issue.11
, pp. 3402-3419
-
-
Boudia, M.1
Louly, M.A.O.2
Prins, C.3
-
13
-
-
56349117292
-
A Memetic Algorithm with Dynamic Population Management for an Integrated Production--Distribution Problem
-
M.Boudia, and C.Prins. 2009. “A Memetic Algorithm with Dynamic Population Management for an Integrated Production--Distribution Problem.” European Journal of Operational Research 195 (3):703–715.
-
(2009)
European Journal of Operational Research
, vol.195
, Issue.3
, pp. 703-715
-
-
Boudia, M.1
Prins, C.2
-
14
-
-
0035566749
-
The Kellogg Company Optimizes Production, Inventory, and Distribution
-
G.Brown, J.Keegan, B.Vigus, and K.Wood. 2001. “The Kellogg Company Optimizes Production, Inventory, and Distribution.” Interfaces 31 (6):1–15.
-
(2001)
Interfaces
, vol.31
, Issue.6
, pp. 1-15
-
-
Brown, G.1
Keegan, J.2
Vigus, B.3
Wood, K.4
-
17
-
-
84935486275
-
A New Approach to Solve the Multi-product Multi-period Inventory Lot Sizing with Supplier Selection Problem
-
L.E.Cárdenas-Barrón, J.L.González-Velarde, and G.Treviño-Garza. 2015. “A New Approach to Solve the Multi-product Multi-period Inventory Lot Sizing with Supplier Selection Problem.” Computers & Operations Research 64:225–232.
-
(2015)
Computers & Operations Research
, vol.64
, pp. 225-232
-
-
Cárdenas-Barrón, L.E.1
González-Velarde, J.L.2
Treviño-Garza, G.3
-
18
-
-
84961291602
-
Fix-and-optimize and Variable Neighborhood Search Approaches for Multi-level Capacitated Lot Sizing Problems
-
H.Chen, 2015. “Fix-and-optimize and Variable Neighborhood Search Approaches for Multi-level Capacitated Lot Sizing Problems.” Omega 56:25–36.
-
(2015)
Omega
, vol.56
, pp. 25-36
-
-
Chen, H.1
-
19
-
-
0000635282
-
A New Dynamic Programming Algorithm for the Single Item Capacitated Dynamic Lot Size Model
-
H.-D.Chen, D.W.Hearn, and C.-Y.Lee. 1994. “A New Dynamic Programming Algorithm for the Single Item Capacitated Dynamic Lot Size Model.” Journal of Global Optimization 4 (3):285–300.
-
(1994)
Journal of Global Optimization
, vol.4
, Issue.3
, pp. 285-300
-
-
Chen, H.-D.1
Hearn, D.W.2
Lee, C.-Y.3
-
22
-
-
84890564346
-
A Branch-and-cut Algorithm for the Multi-product Multi-vehicle Inventory-routing Problem
-
L.C.Coelho, and G.Laporte. 2013. “A Branch-and-cut Algorithm for the Multi-product Multi-vehicle Inventory-routing Problem.” International Journal of Production Research 51 (23–24):7156–7169.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.23-24
, pp. 7156-7169
-
-
Coelho, L.C.1
Laporte, G.2
-
23
-
-
84876857684
-
Ibm Blends Heuristics and Optimization to Plan its Semiconductor Supply Chain
-
A.Degbotse, B.T.Denton, K.Fordyce, R.J.Milne, R.Orzell, and C.T.Wang. 2013. “Ibm Blends Heuristics and Optimization to Plan its Semiconductor Supply Chain.” Interfaces 43 (2):130–141.
-
(2013)
Interfaces
, vol.43
, Issue.2
, pp. 130-141
-
-
Degbotse, A.1
Denton, B.T.2
Fordyce, K.3
Milne, R.J.4
Orzell, R.5
Wang, C.T.6
-
24
-
-
0019032810
-
Deterministic Production Planning: Algorithms and Complexity
-
M.Florian, J.K.Lenstra, and A.H.G.Rinnooy Kan. 1980. “Deterministic Production Planning:Algorithms and Complexity.” Management Science 26 (7):669–679.
-
(1980)
Management Science
, vol.26
, Issue.7
, pp. 669-679
-
-
Florian, M.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
25
-
-
84861355096
-
A Hybrid Approach for the Capacitated Lot Sizing Problem with Setup Carryover
-
H.G.Goren, S.Tunali, and R.Jans. 2012. “A Hybrid Approach for the Capacitated Lot Sizing Problem with Setup Carryover.” International Journal of Production Research 50 (6):1582–1597.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.6
, pp. 1582-1597
-
-
Goren, H.G.1
Tunali, S.2
Jans, R.3
-
26
-
-
33750728882
-
Meta-heuristics for Dynamic Lot Sizing: A Review and Comparison of Solution Approaches
-
R.Jans, and Z.Degraeve. 2007. “Meta-heuristics for Dynamic Lot Sizing:A Review and Comparison of Solution Approaches.” European Journal of Operational Research 177 (3):1855–1875.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1855-1875
-
-
Jans, R.1
Degraeve, Z.2
-
28
-
-
0041511823
-
The Capacitated Lot Sizing Problem: A Review of Models and Algorithms
-
B.Karimi, S.M.T.F.Ghomi, and J.M.Wilson. 2003. “The Capacitated Lot Sizing Problem:A Review of Models and Algorithms.” Omega 31 (5):365–378.
-
(2003)
Omega
, vol.31
, Issue.5
, pp. 365-378
-
-
Karimi, B.1
Ghomi, S.M.T.F.2
Wilson, J.M.3
-
29
-
-
84867037710
-
An Effective Approach to Multi-item Capacitated Dynamic Lot-sizing Problems
-
Y.Li, Y.Tao, and F.Wang. 2012. “An Effective Approach to Multi-item Capacitated Dynamic Lot-sizing Problems.” International Journal of Production Research 50 (19):5348–5362.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.19
, pp. 5348-5362
-
-
Li, Y.1
Tao, Y.2
Wang, F.3
-
31
-
-
85174698947
-
Toward a Physical Internet: Meeting the Global Logistics Sustainability Grand Challenge
-
B.Montreuil, 2011. “Toward a Physical Internet:Meeting the Global Logistics Sustainability Grand Challenge.” Logistics Research 3 (2–3):71–87.
-
(2011)
Logistics Research
, vol.3
, Issue.2-3
, pp. 71-87
-
-
Montreuil, B.1
-
33
-
-
60349090312
-
Solving a Multi-level Capacitated Lot Sizing Problem with Multi-period Setup Carry-over via a Fix-and-optimize Heuristic
-
F.Sahling, L.Buschkühl, H.Tempelmeier, and S.Helber. 2009. “Solving a Multi-level Capacitated Lot Sizing Problem with Multi-period Setup Carry-over via a Fix-and-optimize Heuristic.” Computers & Operations Research 36 (9):2546–2553.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.9
, pp. 2546-2553
-
-
Sahling, F.1
Buschkühl, L.2
Tempelmeier, H.3
Helber, S.4
-
34
-
-
4744372709
-
A Lagrangean-based Heuristic for Multi-plant, Multi-item, Multi-period Capacitated Lot-sizing Problems with Inter-plant Transfers
-
M.Sambasivan, and S.Yahya. 2005. “A Lagrangean-based Heuristic for Multi-plant, Multi-item, Multi-period Capacitated Lot-sizing Problems with Inter-plant Transfers.” Computers & Operations Research 32 (3):537–555.
-
(2005)
Computers & Operations Research
, vol.32
, Issue.3
, pp. 537-555
-
-
Sambasivan, M.1
Yahya, S.2
-
35
-
-
84897980547
-
Interconnected Logistic Networks and Protocols: Simulation-based Efficiency Assessment
-
R.Sarraj, E.Ballot, S.Pan, D.Hakimi, and B.Montreuil. 2014. “Interconnected Logistic Networks and Protocols:Simulation-based Efficiency Assessment.” International Journal of Production Research 52 (11):3185–3208.
-
(2014)
International Journal of Production Research
, vol.52
, Issue.11
, pp. 3185-3208
-
-
Sarraj, R.1
Ballot, E.2
Pan, S.3
Hakimi, D.4
Montreuil, B.5
-
36
-
-
0032094448
-
An Algorithm for Single-item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs
-
D.X.Shaw, and A.P.M.Wagelmans. 1998. “An Algorithm for Single-item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs.” Management Science 44 (6):831–838.
-
(1998)
Management Science
, vol.44
, Issue.6
, pp. 831-838
-
-
Shaw, D.X.1
Wagelmans, A.P.M.2
-
37
-
-
84938983159
-
Integrated Production, Distribution and Scheduling in the Aluminium Industry: A Continuous-time MILP Model and Decomposition Method
-
M.Steinrücke, 2015. “Integrated Production, Distribution and Scheduling in the Aluminium Industry:A Continuous-time MILP Model and Decomposition Method.” International Journal of Production Research 53 (19):5912–5930.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.19
, pp. 5912-5930
-
-
Steinrücke, M.1
-
38
-
-
0001962762
-
Dynamic Version of the Economic Lot Size Model
-
H.M.Wagner, and T.M.Whitin. 1958. “Dynamic Version of the Economic Lot Size Model.” Management Science 5 (1):89–96.
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
|