메뉴 건너뛰기




Volumn 100, Issue , 2016, Pages 9-21

A risk-based shutdown inspection and maintenance interval estimation considering human error

Author keywords

Consequence; Failure model; Failure probability; Human error and shutdown inspection and maintenance; Risk based inspection and maintenance; System reliability

Indexed keywords

CRITICALITY (NUCLEAR FISSION); EQUIPMENT; HYDROCARBON REFINING; INSPECTION; MAINTENANCE; PLANT SHUTDOWNS; PROBABILITY; RISK PERCEPTION; RISKS; SYSTEMS ENGINEERING;

EID: 84960330963     PISSN: 09575820     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.psep.2015.11.011     Document Type: Article
Times cited : (62)

References (54)
  • 1
    • 33750299162 scopus 로고    scopus 로고
    • The role of maintenance in improving companies, productivity and profitability
    • I. Alsyouf The role of maintenance in improving companies, productivity and profitability Int. J. Prod. Econ. 105 1 2007 70 78
    • (2007) Int. J. Prod. Econ. , vol.105 , Issue.1 , pp. 70-78
    • Alsyouf, I.1
  • 3
    • 0036205176 scopus 로고    scopus 로고
    • Can we make maintenance decision on risk analysis?
    • F. Backlund, and J. Hanu Can we make maintenance decision on risk analysis? J. Qual. Maint. Eng. 8 1 2002 77 91
    • (2002) J. Qual. Maint. Eng. , vol.8 , Issue.1 , pp. 77-91
    • Backlund, F.1    Hanu, J.2
  • 4
    • 33746880385 scopus 로고    scopus 로고
    • On an imperfect preventive maintenance model
    • M. Ben-Daya, and A.S. Alghamdi On an imperfect preventive maintenance model Int. J. Qual. Reliab. Manag. 17 06 2000 661 670
    • (2000) Int. J. Qual. Reliab. Manag. , vol.17 , Issue.6 , pp. 661-670
    • Ben-Daya, M.1    Alghamdi, A.S.2
  • 8
    • 0032047827 scopus 로고    scopus 로고
    • A risk-based maintenance model for cross-country pipelines
    • K.P. Dey, S.O. Ogunlana, S.S. Gupta, and M.T. Tabucanon A risk-based maintenance model for cross-country pipelines Cost Eng. 40 4 1998 24 31
    • (1998) Cost Eng. , vol.40 , Issue.4 , pp. 24-31
    • Dey, K.P.1    Ogunlana, S.O.2    Gupta, S.S.3    Tabucanon, M.T.4
  • 9
    • 0034881839 scopus 로고    scopus 로고
    • A risk-based model for inspection and maintenance of cross-country petroleum pipeline
    • P.M. Dey A risk-based model for inspection and maintenance of cross-country petroleum pipeline J. Qual. Maint. Eng. 7 1 2001 25 41
    • (2001) J. Qual. Maint. Eng. , vol.7 , Issue.1 , pp. 25-41
    • Dey, P.M.1
  • 10
    • 33645508323 scopus 로고    scopus 로고
    • Human error in maintenance: A review
    • B.S. Dhillon, and Y. Liu Human error in maintenance: a review J. Qual. Maint. Eng. 12 1 2006 21 36
    • (2006) J. Qual. Maint. Eng. , vol.12 , Issue.1 , pp. 21-36
    • Dhillon, B.S.1    Liu, Y.2
  • 11
    • 0029225716 scopus 로고
    • Probabilistic analysis of a maintainable system with human error
    • B.S. Dhillon, and N. Yang Probabilistic analysis of a maintainable system with human error J. Qual. Maint. Eng. 1 2 1995 50 59
    • (1995) J. Qual. Maint. Eng. , vol.1 , Issue.2 , pp. 50-59
    • Dhillon, B.S.1    Yang, N.2
  • 13
    • 33646672690 scopus 로고    scopus 로고
    • Optimization of the preventive maintenance plan of a series components system
    • J.A.C. Duarte, J.C.T. Craveiro, and T.P. Trigo Optimization of the preventive maintenance plan of a series components system Int. J. Press. Vessel Pip. 83 2006 244 248
    • (2006) Int. J. Press. Vessel Pip. , vol.83 , pp. 244-248
    • Duarte, J.A.C.1    Craveiro, J.C.T.2    Trigo, T.P.3
  • 14
    • 9444237905 scopus 로고    scopus 로고
    • Turnaround maintenance in petrochemical industry, practice and suggested improvement
    • S.O. Duffua, and M.A.B. Daya Turnaround maintenance in petrochemical industry, practice and suggested improvement J. Qual. Maint. Eng. 10 3 2004 184 190
    • (2004) J. Qual. Maint. Eng. , vol.10 , Issue.3 , pp. 184-190
    • Duffua, S.O.1    Daya, M.A.B.2
  • 16
    • 67349228422 scopus 로고    scopus 로고
    • Maintenance optimization using probabilistic cost-benefit analysis
    • D. Ghosh, and S. Roy Maintenance optimization using probabilistic cost-benefit analysis J. Loss Prev. Process Ind. 22 2009 403 407
    • (2009) J. Loss Prev. Process Ind. , vol.22 , pp. 403-407
    • Ghosh, D.1    Roy, S.2
  • 17
    • 84938691628 scopus 로고    scopus 로고
    • A risk-based methodology to estimate shutdown interval considering system availability
    • A. Hameed, F. Khan, and S. Ahmed A risk-based methodology to estimate shutdown interval considering system availability Proc. Safety Prog. 2014 10.1002/prs.11722
    • (2014) Proc. Safety Prog.
    • Hameed, A.1    Khan, F.2    Ahmed, S.3
  • 18
    • 84978325548 scopus 로고    scopus 로고
    • Analysis of complex repairable systems
    • D. Jacob, and S. Amari Analysis of complex repairable systems Inst. Electr. Electron. Eng. 54 2005 517 529
    • (2005) Inst. Electr. Electron. Eng. , vol.54 , pp. 517-529
    • Jacob, D.1    Amari, S.2
  • 19
    • 1642437512 scopus 로고
    • US Department of Transportation, Federal Highway Administration USA
    • D.C. Judycki Technical Advisory on Motor Vehicle Accident Costs 1994 US Department of Transportation, Federal Highway Administration USA http://safety.fhwa.dot.gov/facts-stats/t75702.
    • (1994) Technical Advisory on Motor Vehicle Accident Costs
    • Judycki, D.C.1
  • 20
    • 84906213642 scopus 로고    scopus 로고
    • A framework to estimate the risk-based shutdown interval for a processing plant
    • F. Khan, and A. Hameed A framework to estimate the risk-based shutdown interval for a processing plant J. Loss Prev. Process Ind. 32 2014 18 29
    • (2014) J. Loss Prev. Process Ind. , vol.32 , pp. 18-29
    • Khan, F.1    Hameed, A.2
  • 21
    • 12344296488 scopus 로고    scopus 로고
    • Risk-based maintenance (RBM): A new approach for process plant inspection and maintenance
    • F.I. Khan, and M. Haddara Risk-based maintenance (RBM): a new approach for process plant inspection and maintenance Am. Inst. Chem. Eng. Process Saf. Prog. 23 4 2004 252 265
    • (2004) Am. Inst. Chem. Eng. Process Saf. Prog. , vol.23 , Issue.4 , pp. 252-265
    • Khan, F.I.1    Haddara, M.2
  • 22
    • 2142815698 scopus 로고    scopus 로고
    • Risk-based maintenance of ethylene oxide production facilities
    • F.I. Khan, and M. Haddara Risk-based maintenance of ethylene oxide production facilities J. Hazard. Mater. A108 2004 147 159
    • (2004) J. Hazard. Mater. , vol.A108 , pp. 147-159
    • Khan, F.I.1    Haddara, M.2
  • 23
    • 0242487685 scopus 로고    scopus 로고
    • Risk-based maintenance (RBM); A quantitative approach for maintenance/inspection scheduling and planning
    • F.I. Khan, and M. Haddara Risk-based maintenance (RBM); a quantitative approach for maintenance/inspection scheduling and planning J. Loss Prev. Process Ind. 16 2003 561 573
    • (2003) J. Loss Prev. Process Ind. , vol.16 , pp. 561-573
    • Khan, F.I.1    Haddara, M.2
  • 24
    • 41449086139 scopus 로고    scopus 로고
    • A new methodology for risk-based availability analysis
    • F.I. Khan, M. Haddara, and L. Krishnasamy A new methodology for risk-based availability analysis IEEE Trans. Reliab. 57 2008 2008 103 112
    • (2008) IEEE Trans. Reliab. , vol.57 , Issue.2008 , pp. 103-112
    • Khan, F.I.1    Haddara, M.2    Krishnasamy, L.3
  • 26
    • 0031035016 scopus 로고    scopus 로고
    • The validation of three human reliability quantification techniques - THERP, HEART and JHEDI; Part III - Practical aspects of the usage of the techniques
    • B. Kirwan The validation of three human reliability quantification techniques - THERP, HEART and JHEDI; part III - practical aspects of the usage of the techniques; Appl. Ergon. 28 1 1997 27 39
    • (1997) Appl. Ergon. , vol.28 , Issue.1 , pp. 27-39
    • Kirwan, B.1
  • 27
    • 0031019024 scopus 로고    scopus 로고
    • The validation of three human reliability quantification techniques - THERP, HEART and JHEDI; Part II - Results of validation exercise
    • B. Kirwan, R. Kennedy, S. Taylor-Adams, and B. Lambert The validation of three human reliability quantification techniques - THERP, HEART and JHEDI; part II - results of validation exercise Appl. Ergon. 28 1 1997 17 25
    • (1997) Appl. Ergon. , vol.28 , Issue.1 , pp. 17-25
    • Kirwan, B.1    Kennedy, R.2    Taylor-Adams, S.3    Lambert, B.4
  • 28
    • 16244421113 scopus 로고    scopus 로고
    • Development of risk-based maintenance (RBM) strategy for a power generating plant
    • L. Krishnasamy, F.I. Khan, and M. Haddara Development of risk-based maintenance (RBM) strategy for a power generating plant J. Loss Prev. Process Ind. 18 2005 69 81
    • (2005) J. Loss Prev. Process Ind. , vol.18 , pp. 69-81
    • Krishnasamy, L.1    Khan, F.I.2    Haddara, M.3
  • 29
    • 78650292105 scopus 로고    scopus 로고
    • Prioritization of maintenance tasks on industrial equipment for reliability
    • E.V. Kumar, and S.K. Chaturvedi Prioritization of maintenance tasks on industrial equipment for reliability Int. J. Qual. Reliab. Manag. 28 1 2008 109 126
    • (2008) Int. J. Qual. Reliab. Manag. , vol.28 , Issue.1 , pp. 109-126
    • Kumar, E.V.1    Chaturvedi, S.K.2
  • 30
    • 84865225584 scopus 로고    scopus 로고
    • Cost estimating for turnarounds
    • G. Lawrence Cost estimating for turnarounds Pet. Technol. Q. Q1 2012 37 43 www.eqtq.com
    • (2012) Pet. Technol. Q. , vol.Q1 , pp. 37-43
    • Lawrence, G.1
  • 31
    • 0034135276 scopus 로고    scopus 로고
    • Optimization of imperfect preventive maintenance for multi-state system
    • G. Levitin, and A. Lisnianski Optimization of imperfect preventive maintenance for multi-state system Reliab. Eng. Syst. Saf. 67 2000 1999 193 203
    • (1999) Reliab. Eng. Syst. Saf. , vol.67 , Issue.2000 , pp. 193-203
    • Levitin, G.1    Lisnianski, A.2
  • 32
    • 0442307365 scopus 로고    scopus 로고
    • Imperfect repair models with preventive maintenance
    • H. Li, and M. Shaked Imperfect repair models with preventive maintenance J. Appl. Probab. 40 2003 1043 1059
    • (2003) J. Appl. Probab. , vol.40 , pp. 1043-1059
    • Li, H.1    Shaked, M.2
  • 33
    • 0018517702 scopus 로고
    • Reliable preventive maintenance policy
    • 3
    • M.A.K. Malik Reliable preventive maintenance policy AIIE Trans. 1 l/3 1979 221 228
    • (1979) AIIE Trans. , vol.1 , Issue.L , pp. 221-228
    • Malik, M.A.K.1
  • 34
    • 77950959955 scopus 로고    scopus 로고
    • The development and application of dynamic operational risk assessment in oil/gas and chemical process industry
    • M.S. Mannan, and X. Yang The development and application of dynamic operational risk assessment in oil/gas and chemical process industry Reliab. Eng. Syst. Saf. 95 2010 2010 806 815
    • (2010) Reliab. Eng. Syst. Saf. , vol.95 , Issue.2010 , pp. 806-815
    • Mannan, M.S.1    Yang, X.2
  • 35
    • 80755132730 scopus 로고
    • Optimum policies for a system with imperfect maintenance
    • T. Nakagawa, and K. Yasui Optimum policies for a system with imperfect maintenance IEEE Trans. Reliab. R-36 5 1987 631 633
    • (1987) IEEE Trans. Reliab. , vol.R36 , Issue.5 , pp. 631-633
    • Nakagawa, T.1    Yasui, K.2
  • 36
    • 84863973940 scopus 로고    scopus 로고
    • Optimal imperfect preventive maintenance policies for a used system
    • T. Nakagawa, C. Qian, and X. Zhao Optimal imperfect preventive maintenance policies for a used system Int. J. Syst. Sci. 43 9 2012 1632 1641
    • (2012) Int. J. Syst. Sci. , vol.43 , Issue.9 , pp. 1632-1641
    • Nakagawa, T.1    Qian, C.2    Zhao, X.3
  • 37
    • 84859424664 scopus 로고    scopus 로고
    • Availability modelling of repairable systems using Bayesian networks
    • M. Neil, and D. Marquez Availability modelling of repairable systems using Bayesian networks Eng. Appl. Artif. Intell. 25 2012 698 704
    • (2012) Eng. Appl. Artif. Intell. , vol.25 , pp. 698-704
    • Neil, M.1    Marquez, D.2
  • 38
    • 0019702692 scopus 로고
    • Optimal maintenance policy with imperfect preventive maintenance
    • D.G. Nguyen, and D.N.P. Murthy Optimal maintenance policy with imperfect preventive maintenance IEEE Trans. Reliab. R-30 5 1981
    • (1981) IEEE Trans. Reliab. , vol.R30 , Issue.5
    • Nguyen, D.G.1    Murthy, D.N.P.2
  • 39
    • 84880604197 scopus 로고    scopus 로고
    • The role of human error in risk analysis: Application to pre and post-maintenance procedures of process facilities
    • A. Noroozi, N. Khakzad, F. Khan, S. MacKinnon, and R. Abbassi The role of human error in risk analysis: application to pre and post-maintenance procedures of process facilities Reliab. Eng. Syst. Saf. 119 2013 251 258
    • (2013) Reliab. Eng. Syst. Saf. , vol.119 , pp. 251-258
    • Noroozi, A.1    Khakzad, N.2    Khan, F.3    MacKinnon, S.4    Abbassi, R.5
  • 41
    • 84868135551 scopus 로고    scopus 로고
    • A framework for the evaluation of turnaround maintenance projects
    • C. Obiajunwa A framework for the evaluation of turnaround maintenance projects J. Qual. Maint. Eng. 18 4 2012 368 383
    • (2012) J. Qual. Maint. Eng. , vol.18 , Issue.4 , pp. 368-383
    • Obiajunwa, C.1
  • 42
    • 42049118318 scopus 로고    scopus 로고
    • Reliability assessment of reliquefaction systems on LNG carriers
    • C.K. Pil, M. Rausand, and J. Vatn Reliability assessment of reliquefaction systems on LNG carriers Reliab. Eng. Syst. Saf. 93 2008 1345 1353
    • (2008) Reliab. Eng. Syst. Saf. , vol.93 , pp. 1345-1353
    • Pil, C.K.1    Rausand, M.2    Vatn, J.3
  • 43
    • 0000523339 scopus 로고
    • Optimal replacement policies for a deteriorating system with imperfect maintenance
    • A. Rangan, and R.E. Grace Optimal replacement policies for a deteriorating system with imperfect maintenance Adv. Appl. Probab. 21 1989 949 951
    • (1989) Adv. Appl. Probab. , vol.21 , pp. 949-951
    • Rangan, A.1    Grace, R.E.2
  • 44
    • 84855784101 scopus 로고    scopus 로고
    • Optimization of power machines maintenance intervals taking the risk into consideration
    • A. Rusin, and A. Wojaczek Optimization of power machines maintenance intervals taking the risk into consideration Eksploat. i Niezawodn. - Maint. Reliab. 14 1 2012 72 76
    • (2012) Eksploat. i Niezawodn. - Maint. Reliab. , vol.14 , Issue.1 , pp. 72-76
    • Rusin, A.1    Wojaczek, A.2
  • 46
    • 84873061053 scopus 로고    scopus 로고
    • Strategic analysis of technology and capacity investments in the liquefied natural gas industry
    • E. Sönmez, S. Kekre, A. Scheller-Wolf, and N. Secomandi Strategic analysis of technology and capacity investments in the liquefied natural gas industry Eur. J. Oper. Res. 226 1 2013 100 114
    • (2013) Eur. J. Oper. Res. , vol.226 , Issue.1 , pp. 100-114
    • Sönmez, E.1    Kekre, S.2    Scheller-Wolf, A.3    Secomandi, N.4
  • 48
    • 0034890068 scopus 로고    scopus 로고
    • Application of performance shaping factor (PSF) for work improvement in industrial plant maintenance tasks
    • Takashi Toriizuka Application of performance shaping factor (PSF) for work improvement in industrial plant maintenance tasks Int. J. Ind. Ergon. 28 2001 2001 225 236
    • (2001) Int. J. Ind. Ergon. , vol.28 , Issue.2001 , pp. 225-236
    • Toriizuka, T.1
  • 49
    • 0031220052 scopus 로고    scopus 로고
    • A general framework for preventive maintenance optimization in chemical process operations
    • J.S. Tan, and M.A. Kramer A general framework for preventive maintenance optimization in chemical process operations Comput. Chem. Eng. 21 12 1997 1451 1469
    • (1997) Comput. Chem. Eng. , vol.21 , Issue.12 , pp. 1451-1469
    • Tan, J.S.1    Kramer, M.A.2
  • 51
    • 0029237571 scopus 로고
    • Optimization of test and maintenance intervals based on risk and cost
    • J.K. Vaurio Optimization of test and maintenance intervals based on risk and cost Reliab. Eng. Syst. Saf. 49 1995 23 36
    • (1995) Reliab. Eng. Syst. Saf. , vol.49 , pp. 23-36
    • Vaurio, J.K.1
  • 52
    • 84867655808 scopus 로고    scopus 로고
    • Development of a risk-based maintenance strategy using FMEA for a continuous catalytic reforming plant
    • Y. Wang, G. Cheng, H. Hu, and W. Wu Development of a risk-based maintenance strategy using FMEA for a continuous catalytic reforming plant J. Loss Prev. Process Ind. 25 2012 958 965
    • (2012) J. Loss Prev. Process Ind. , vol.25 , pp. 958-965
    • Wang, Y.1    Cheng, G.2    Hu, H.3    Wu, W.4
  • 54
    • 79955667315 scopus 로고    scopus 로고
    • An evaluation of maintenance strategy using risk based inspection
    • T. Zhaoyang, L. Jianfeng, W. Zongzhi, z. Jianhu, and H. Weifeng An evaluation of maintenance strategy using risk based inspection Saf. Sci. 49 2011 852 860
    • (2011) Saf. Sci. , vol.49 , pp. 852-860
    • Zhaoyang, T.1    Jianfeng, L.2    Zongzhi, W.3    Jianhu, Z.4    Weifeng, H.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.